1、21年项目管理师考试试题及答案6卷21年项目管理师考试试题及答案6卷 第1卷 121 Charisma would be an example of _ power.A. LegitimateB. RewardC. CoerciveD. ExpertE. Referent正确答案:E 81 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work sche
2、duled to this point of time. You can therefore conclude that:A. The project will be completed late.B. The critical path has been lengthened.C. the costs are being overrun.D. Overtime will be required to maintain the original critical path.E. None of the above正确答案:E 内部回报率是项目预期利润的评定标准,可以把它看作:( )A向政府汇报
3、的税后利润B在投资生命期利用的没有项目损失的资金应该支付的最大利率C完工估算(EAC)减完工预算(BAC)D贴现收入和贴现成本的比率正确答案:B 200 Using the figure in the Special Window, what is the probability of success for Project B?A. 0.30B. 0.20C. 0.35D.0.15E.0.12正确答案:C 质量控制检验和测量结果被用于( )A质量计划的输入项B准备一个操作定义C准备一个控制图表D质量保证的输入项正确答案:D21年项目管理师考试试题及答案6卷 第2卷 人与人之间最快最有效的沟通
4、是与什么一起产生的( )A相同的观点B不同的利益C先进的程度D降低预先感知的障碍的能力E很好的解码技术正确答案:A 网络进度的一些基本术语及概念包括( )A工作事件人力技术水平及浮动B工作文档事件人力及技术水平C浮动工作事件及时间估算D估算浮动时间报告的起草生命周期阶段及赶工时间正确答案:C Planning activities such that predetermined resource availability pools are not exceeded is called:A.Resource leveling.B.Manpower leveling.C.Resource lim
5、ited planning.D.Manpower planning.E.Manpower contingency planning.正确答案:CC 7 Which of the following types of contracts is equivalent to a cost plus contract:A. Fixed firm priceB. Cost reimbursableC. Fixed price plus incentive feeD. progress paymentsE. All of the above正确答案:B The estimated cost to comp
6、lete (ETC) is _.A.BCWP/ACWPB.the forecasted and final cost - cost to dateC.(ACWP-BCWP)/BCWP *D.Total estimate - ACWPE.None of the above.正确答案:BB21年项目管理师考试试题及答案6卷 第3卷 统计控制表是一种工具用来帮助A、控制进度变化,以避免超时过多B、衡量一致性程度C、判断结果是否一致D、判断结果是否符合要求正确答案:A 下列各项都是进度计划的里程碑除了( )A结束日期B合同日期C计划的关键事件D固定日期E活动的工期正确答案:E 109 The roll
7、ing wave or moving window concept is used most frequently on projects where:A. The baseline is frozen for the duration of the project and no scope changes are permittedB. Marketing is unsure of what the customer actually wants and reserves the right to make major scope changesC. The low levels of th
8、e work breakdown structure are known with certainty for the next three to six months, but the remaining tasks are based upon the results of the first three to six months of work D. Networking techniques are not appropriateE. All of the above正确答案:C 154 Which of the following is referred to as payback
9、 period:A. the number of periods required to recover the initial investmentB. the rate of return on the investmentC. the number of periods required to bring project cost back to the original budget, based on current performanceD. loan payment scheduleE. None of the above正确答案:A 你决定要在公司中组建一个PMP考试的学习小组
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 21 项目 管理 考试 试题 答案
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内