住宅小区供电系统设计(DOC32页)hzcc.doc
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《住宅小区供电系统设计(DOC32页)hzcc.doc》由会员分享,可在线阅读,更多相关《住宅小区供电系统设计(DOC32页)hzcc.doc(45页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,
3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8
4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe
5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207
6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo
7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc
8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F
9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ
10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis
11、ion of production safety and the Olympic Games and otherEvaluation Warning: The document was created with Spire.Doc for .NET.本 科 毕 业 设 计 (论 文)前进小区区供电系系统设计计The Poweer SSuppply Systtem Desiign of Resiidennce学 院: 电子工工程学院院 专业班级级: 电气气工程及及其自动动化 电气0811 学生姓名名: 沙 岩 学 号号: XXXXXXXXXXXX 指导教师师: XXXXXXXXXX(副教教授)
12、220122年 6月毕业设计计(论文文)中文文摘要前进小区区供电系系统设计计摘 要要:本次次毕业设设计的课课题是前前进小区区供电系系统的设设计,根根据设计计的基本本要求,运运用所学学的相关关知识,查查阅相关关的资料料,进行行供电系系统的初初步设计计。本次次设计的的基本流流程是:进行负负荷计算算,根据据负荷计计算结果果进行变变压器的的选择并并确定供供电方案案,之后后依次进进行短路路电流的的计算,高高、低压压电器设设备的选选择和校校验,继继电保护护,防雷雷与接地地保护,电电测量仪仪表设计计,电梯梯双电源源互备投投电路设设计等,在在这一框框架下,按按照国家家的标准准,结合合小区实实际情况况完成设设计
13、。本本次设计计考虑到到了供电电系统的的安全、可可靠、灵灵活、经经济四项项基本要要求,在在选择供供电方案案和电器器设备时时,优先先选择低低能耗并并且满足足设计要要求的方方案和设设备,除除此以外外,还考考虑到了了小区未未来的负负荷发展展情况,做做到了远远、近期期结合,留留有扩建建的可能能性。关键词:负荷统计计;变压压器选择择;短路路计算;继电保保护;备备用电源源毕业设计计(论文文)外文文摘要The Poweer SSuppply Systtem Desiign of ResiidennceAbsttracct: Thee suubjeect of thiis ggradduattionn prro
14、jeect is thee deesiggn oof tthe ressideencee arrea powwer suppplyy syysteem. Acccorddingg too thhe bbasiic rrequuireemennts of thee deesiggn, usiing of thee reelevvantt knnowlledgge, seaarchhingg reelevvantt innforrmattionn. BBegiin tthe dessignn off thhe ppoweer ssuppply sysstemm. TThe bassic prooc
15、esss oof ddesiign is loaad sstattistticss, aaccoordiing to thee looad callcullatiion ressultts tto sseleect thee trranssforrmerr, tthenn beeginn thhe SShorrt-ccirccuitt caalcuulattionn, sseleectiion andd caalibbrattionn off hiigh andd loow vvolttagee ellecttriccal equuipmmentt, rrelaay pprottecttion
16、n, llighhtniing arrrestt annd ggrouundiing prootecctioon, eleectrricaal mmeassuriing insstruumennt ddesiign andd thhe ddesiign of eleevattor powwer eacch ootheer pprepparee too innputt. IIn tthiss frrameeworrk, acccorddingg too thhe nnatiionaal sstanndarrds, coombiinedd wiith thee acctuaal ssituuati
17、ion of ressideentiial to commpleete thee grraduuatiion proojecct. Thiis ddesiign connsidderaatioons to thee poowerr suupplly ssysttem of saffe, relliabble, fllexiiblee annd eeconnomiic ffourr baasicc reequiiremmentts, in thee chhoicce oof ppoweer ssuppply plaan aand eleectrricaal eequiipmeent, prref
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 住宅小区 供电系统 设计 DOC32 hzcc
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内