1、ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 1 2005 Revision All Rights Reserved 1)STANDARDS SUMMARY?ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 2 2005 Revision All Rights Reserved 1.1 SUMMARY?.3 1.2 COMMON OMISSIONS AND PR
2、OBLEMS?.9 1.2.1 FIRE LIFE SAFETY?.9 1.2.2 MECHANICAL,ELECTRICAL AND PLUMBING?!#.11 ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 3 2005 Revision All Rights Reserved 1.1 SUMMARY InterContinental Hotels Group$&%?(?)*$&%?(?)*$&%?(?)*$&%?(?)*Engineering Standards for
3、 Inter-Continental Hotels Group$&%&?(?)*?+?,?-?.$&%&?(?)*?+?,?-?.$&%&?(?)*?+?,?-?.$&%&?(?)*?+?,?-?.Summary?Section/?0/?0/?0/?0 System12121212 Requirements?&3?&3?&3?&3 AIR CONDITIONING4?54?54?54?5 General?76?76?76?76 All public areas fully air conditioned.Service areas ventilation except staff cafete
4、ria,offices.HVAC in locations with average temp of 13oC 5hrs/yr.8?9:7;?=?A&BC&D?EF#G7H?I?J?K L:M?N?O&P?QR=?S?TUFVWD?E?X&Y?Z?713oC/5_/a Air changes&temperature b?Z&As detailed in tables c?d?e7f Guest rooms g?h Moderate climate:4-pipe overhead fan coil,tropical:2-pipe.Temperature summer:22oC;winter:24
5、oC.Thermostat setting 23oC+/-3oC.Z?i?jk4T!#l?mT?n&!poqrs=k2T!FZk?tlk22oCosu?lk24oCFZ&v&wk23oC+/-3oC Fresh primary air/exhaust:90/85cbm/room with thermal wheel heat recovery.x?yT/z?k90/85cbm/hr#q?|?q?s Public areas:#;s=Medium pressure multiple zone variable air volume systems.23oC.=?T&723oC Swimming
6、Pool Indoors M&?VAV with latent heat recovery.28oC r#?q?T&?F28oC Administration,Telephone operator&Department head offices?L:M&h?#7L:M Minimum fresh air/exhaust+individual fan coils _yT/z?+?T?n!Service areas Q&Rs=Laundry 100%fresh air/exhaust.28oC with spot cooling.?h100%yT/z?F28oCsr7?&(?7)Kitchens
7、Induction hood.27oC with spot cooling.7?hz#T&27oC9?Staff cafeteriaH#I?J?K HVAC.23oCVW?D7E?k23oC Computer room h Independent self-contained unit.23oC.?A?&k23oC Lift plant rooms?h Tropical locations:Self-contained unit,unless supplied by room exhaust q&rhp?S?T Equipment?Chillers-Scroll/Screw/Centrifug
8、al?w?/?/Moderate climate 5 hours temp.13oC:3 units 50%.Diversity:80%.Refrigerants:R134a,407C.HFC only.Z?i5 _ Z?13oCk2?67%?Fqr5 _ Zp13oCk3&?50%&?F&k80%F?kR134a,407C?7?ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 4 2005 Revision All Rights Reserved Cooling Towers?
9、7 Cross-flow/induced draft-2speed fans.Not required for air-cooled chillers.&/SpT!TFp?&D?w Boilers-Hot water?q&Cold climate 5oC:250%.of maximum demand.Diversity:80%.94%efficiency or heat pump.j?k80%F94%?7q?F Boilers Steam?2 units 100%.3-pass water tubes boilers.2?&100%&?F Section/?0/?0/?0/?0 System?
10、Requirements?&?&?&?&Building Automation#?v Controlling entire HVAC incl.fan coils,major plumbing equipment.Specific electrical circuits,coldrooms&freezers,spec.life safety equipment.Sub-metering.Interface w.Fidelio.v?VW?D?Es&T?n!x!7CUF&?p?sh&?&?CF?&FFidelio7?F Fans T?Non-overloading centrifugal fan
11、type.Impellers should have backward curved blades exc.fan coils.?T?F#GT&n!Np?9?#F PLUMBING 7?7?7?7?Water Supply Quality as per WHO standards.Additional treatment to be non corrosive&non-scale forming.Unreliable supply backed up by own well,desalination plant&storage tanks.Capacity:900 ltrs/room/day.
12、W/o laundry:750 ltrs/room/day.&?FN?&?F?C&?C?!Fk900#/h/lF?hk750#/hp/lF Distribution B Max.fixture pressure 5,5 bar per zone.1,5+/-0,5 bar at top level.Separate pumps for each zone.Direct feed to lower floors if street pressure is adequate.Sub-metering all major departments.?$C?%5,5&/=F?(?)?*1,5+/-0,5
13、&F$+?F,?-.%?/?0?1&?2?3?4?5F7?28?9xUF Hardness 6 0 ppm for boilers,dishwashers.50 ppm laundry.120 ppm cooling towers&hot water.?7k0 ppmk?h50 ppm&7?q?k120 ppm Water Treatment?8 Dedicated water treatment systems for cooling towers,boilers,closed circuits heating&cooling*&?&?9:?q?&?B;?8&?p Kitchens&Laun
14、dry Effluent 7h?hz?Grease traps for kitchen effluent.PH correction for laundry-as required.*?hz?wF?&8A&hPHB?CF ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 5 2005 Revision All Rights Reserved Hot water q?Duplex storage type with circulation pumps.Shell/tube heat
15、 exchangers.Where non-scale forming exterior plate/frame heat exchangers.General supply:60oC.Dishwasher booster to 80oC.Thermostatic anti-scald mixing valves in all public areas to limit to 40oC.D?E?F?G?HF!?Iq?bwUF?JM?N8K?q?bwFL?Sk60 oC?7?M?k80 oCF8?9:7;=NZPOQ8R?S:TUPV40 oC Irrigation W8X Sub-surfac
16、e automatic piping system j?Y!#?Storm drainage Z7z?Separate system discharging into storm sewer,combination sewer as per local situation.?Z?Y?&?p$?:?Y?+j?_?Materials a?b Domestic water:copper or Polypropylene.Pool,fountains,irrigation:PVC.Stand-pipe,sprinklers,heating,cooling:BS.Sewer:Cast iron or P
17、VC(Insulated).Uk?cedgfih FijikWeXkPVCFl!U?j&.mVW#pkBSFYpkn?oPVCpbrq?s8t?u Sewage Treatment Plant?FNZO?Q?RiS:wFk6#/.F8k6/3#D?Gas&Fuel?8b As per local conditions-most feasible supply.?8Pj?8 V?v7?2 Swimming Pool&7 Dedicated water treatment.Indoor pool heated to 28oC.)?8FM7Z?q?28 oCF Section/?0/?0/?0/?0
18、 System?Requirements?&?&?&?&ELECTRICAL Supply?HV loop to air-cooled transformers rated at 2*100%or 3*50%capacity.High or low voltage metering-as per local code&best tariff.Power factor correction.D?w?e2*100%3*50%F3?j?&?.FP$8B?CF Emergency Power?C%Emergency generator for all life safety systems,lifts
19、,partial lighting,coldrooms,domestic&sump pumps&specific other equipment.Fuel,enough for 48 hours.UPS for all computer equipment.?8?9&?p?&?g?&?U&O?PC?Fb0?48_p?&F?8?9C Distribution B Sub-metering all major departments&equipment 7?8?9x?C Guest Rooms g?h Distribution panel in each room with 5 circuit
20、s hpB?95?Bn ENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 6 2005 Revision All Rights Reserved Lighting e As per interior designer,IC room&other standards.Dimming for all public areas except corridors,rooms.?m?Jh?O?P?F7G?S?hpNO?P:#;ps=?Y?7E?F Audio-visual.C MATV&S
21、ound systems for all rooms,specific public areas.Pocket paging system.h?)=UB&9xl?U?P7F?7 Security CCTV,Hold-up&burglar alarm,Exit door monitoring system.9?O|?,?#?7F Communication&Data SystemsS?7 See separate standards c?d?ELEVATORS Guest Elevators g Adequate number to answer all calls within 30 seco
22、nds for 50%,45 sec.for 95%,60 sec.for 100%of waiting persons.0?3050%i?4595%?&18?97i?F Service Elevators H#I&8?Minimum of two(2)units for hotels 400 rooms,but minimum of 50%of guest elevators.400hp8?B&C2U?g?7?50%F Banquet Larger elevator to accommodate all guests within 30 minutes and transport exhib
23、ition goods(car etc).#?30?08&9g?8?Pq?$Fu Firemen s lift?O As required by local code.7j?&Escalators 8 As required by layout.7?&LIFE SAFETY 8?88?88?88?8 Suppression v Fully sprinklered building,concealed quick response type.4?/?m.j8m 2.5 fire hoses in high rise;low rise at discretion of IHG?592.5$?rp$
24、5?&!8e7$F Fire extinguishers throughout+m7A?vFA(BF Dedicated supervised 3-channel voice alarm system for high-rise.Can be utilized as sound system.4?5B;#s!83-?|8?Fv?8P?F Section/?0/?0/?0/?0 System?Requirements?&?&?&?&Interfaces with paging systems,BMS,smoke control systems,elevator recall,other ext.
25、sub-systems,door hold-open devices?.&?sBMS?.vENGINEERING STANDARDS SECTION 1 SUMMARY?InterContinental Hotels Group Asia Pacific 7 2005 Revision All Rights Reserved BMSq#!u7.FO&P?&?m Guest rooms:Addressable smoke detector with integral acoustic alarm g?hkv|$J8?w Central Control Room vh All high-rise