《工程施工土建监理建筑监理资料》弱电工程表格.doc





《《工程施工土建监理建筑监理资料》弱电工程表格.doc》由会员分享,可在线阅读,更多相关《《工程施工土建监理建筑监理资料》弱电工程表格.doc(18页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、配线线路绝缘电阻测试记录Record of Insulation Resistance Test for Distribution Line电07 编号No:_单位工程名称Name of unit project施工日期Construction duration分部工程名称Name of divisional project分项工程名称Name of sub-divisional project施工图号Construction drawing No.检查部位Inspection location测试仪器型号、精度Type and precision of test instru.线路编号Cir
2、cuit No线路型号、规格、敷设方法Circuit type、spec、laying mode绝缘电阻(M)Insulation resistanceABBCCAANBNCNAPEBPECPENPE监理(建设)单位:Supervision Company(The Owner):(公章)监理工程师: (Seal)Supervising Engineer:(建设单位代表):(Representative of The Owner):年 月 日Year/Month/Day施工单位:Construction Company:班组长:Monitor of Work Team: (公章)施工员: (Se
3、al)Technician:质检员:Quality Inspector:年 月 日Year/Month/Day接地电阻测试记录Record of Grounding Test电09 编号No:_单位工程名称Name of unit project测试日期Test date分部工程名称Name of divisional project分项工程名称Name of sub-divisional project施工图号Construction drawing No.测试仪器型号、精度Type and precision of test instru.测试部位Test location接地性质Grou
4、nding kind接地电阻()Grounding resistance 测试环境Surrounding of test结论Conclusion设计值Design value实测值Measured value温度()Temperature天气情况Weather简图或备注:Sketch or remarks:监理(建设)单位:Supervision Company(The Owner):(公章)监理工程师: (Seal)Supervising Engineer:(建设单位代表):(Representative of The Owner):年 月 日Year/Month/Day施工单位:Const
5、ruction Company:班组长:Monitor of Work Team: (公章)施工员: (Seal)Technician:质检员:Quality Inspector:年 月 日Year/Month/Day电缆敷设及绝缘电阻测试记录Record of Cable Laying and Insulation Resistance Test电06 编号No:_单位工程名称Name of unit project施工日期Cons. duration分部工程名称Name of divisional project施工图号Construction drawing No.测试仪器型号、精度Ty
6、pe and precision of test instru.电缆编号Cable No.规格型号Spec. and type起点From终点To敷设方式Laying mode电缆头型式Type of terminal中间头数量Number ofconnection绝缘电阻(M)Insulation resistance长度(m)Length相间Phases对零To zero对地To earth电缆支架安装记录:Record of Cable support Installation:1) 电缆支架最上层至竖井顶部或楼板的距离为_m;1)Distance from the upmost of
7、support to the top of vertical shaft or floor slab is _m;2)电缆支架最下层至沟底或地面的距离为_m;2)Distance from the undermost of support to ditch bottom or ground is _m;3)电缆支架层间最小距离为_m;3)The min. distance between layers of cable support _m。班组长: 施工员: 质检员: 年 月 日Monitor of Work Team: Technician Quality Inspector: Year/
8、Month/Day电缆桥架安装检查记录Record of Cable Trays Installation Inspection电05 编号No:_单位工程名称Name of unit project施工日期Cons. duration分部工程名称Name of divisional project分项工程名称Name of sub-divisional project project施工图号Construction drawing No.桥架材质Material of the tray支架安装Supports installation规格Spec.水平安装间距(m)Horizontal sp
9、acing of the trays垂直安装间距(m)Vertical spacing of the trays固定方法Fixing method规定值Specified value实测值Measure value规定值Specified value实测值Measured value桥架安装Cable trays installation规格Spec.长度(m)Length弯曲半径(mm)Bending radius伸缩节的设置Extension joints固定方法Fixing method允许值Permitted value实测值Measured value与接地干线的连接情况:Conne
10、ction with trunk line of grounding:连接板两端的跨接接地情况:Cross connection grounding in two ends of the connection plate:简图说明:Illustration:班组长: 施工员: 质检员: 年 月 日Monitor of Work Team: Technician Quality Inspector: Year/Month/Day技 术 交 底 记 录Record of Techniques Clarification施04 编号No:_单位工程名称Name of unit project分部工程
11、名称Name of divisional(sub-divisional) project施工图号Construction drawing No.交底依据:Basis of clarification:交底内容:Contents of clarification:交底人签字:Signature of The Person to Clarify:年 月 日Year/Month/Day被交底人签字:Signature of The Person to Accept The Clarify: 年 月 日Year/Month/Day开 工 报 告Report of Work Commencement施0
12、3 编号No:_单位工程名称Name of unit project合同造价Contract price计划工作天Planed work days工程地点Project location计划开工日期Planed start date计划竣工日期Planed completion date施工许可证或开工报告批准文号Construction license or the No.of approval for project start序号No.工程开工条件Conditions of the project start具备情况Conditions available1合同或协议书签订情况Sign
13、on the contract or agreement2工程项目是否列入计划The project is listed in the plan3设计交底施工图会审情况Design clarification and the drawings joint checkup4施工组织设计或施工方案批准交底情况Approval for construction organization or construction plan5施工图预算编制情况Completion of the budget making with the construction drwaing6施工机械落实情况Construc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程施工土建监理建筑监理资料 工程施工 土建 监理 建筑 资料 工程 表格

限制150内