A公司英语培训教材.doc





《A公司英语培训教材.doc》由会员分享,可在线阅读,更多相关《A公司英语培训教材.doc(10页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、公 司 英 语一、织机构及职位XX电子有限公司XX Electronics CO., Ltd总经理办公室General managers office 企管部Enterprise management department (EM)行政部Administration department (AD)销售部Sales department (SD)财务部Financial department (FD)技术部Technology department (TD)物控部Production material control department (PMC)生产部Production departmen
2、t(PD)模具部Mold manufacturing department, Tooling manufacturing department (TM)品管部Quality Assurance department (QA)冲压车间Stamp workshop, press workshop 注塑车间injection workshop装配车间Assembly workshop模具装配车间Mold and die Assembly workshop金属加工车间Metal machine workshop电脉冲车间Electric discharge process workshop线切割车间w
3、ire cutting process workshop工磨车间Grinding workshop总经理General manager (GM)副总经理Vice-general manager经理manager董事长president副董事长Vice-presidentXX部门经理Manager of XX department主任、主管supervisor拉长Line leader组长Foreman, forelady秘书secretary文员clerk操作员operator助理assistant职员staff二、产品连接器connector端子terminal条型连接器bar connec
4、tor阴连接器Housing阳连接器wafer线束wire harness间距space额定电压 rated voltage额定电流 rated current接触电阻contact resistance绝缘电阻insulation resistance超声波焊接ultrasonic welding耐压withstand voltage针pin物料编号part number导线wire基体金属Base metal电缆夹cable clamp倒角chamfer接触面积contact area接触件安装孔contact cavity接触长度contact length接触件电镀层contact p
5、lating接触压力contact pressure接触件中心距contact space接触簧片contact spring插孔socket contact法兰、凸缘Flange界面间隙interfacial gap键Key键槽keyway过渡段ramp屏蔽套shielding定位基准Datum reference扁平电缆flat cable ,Ribbon cable柔性印刷电线Flexible printed wiring多层印制电路Multilayer printed circuit焊盘pad图形pattern间距pitch负极Negative pole正极positive pole回
6、流Reflow原理图Schematic diagram单面板single sided board 双面板Two-sided board,Double-sided board表面安装surface Mounting翘曲warp, bow波峰焊wave soldering编织层braid同轴电缆coaxial cable电介质dielectric电缆中导线的头数ends外部干扰external interference填充物filler护套jacket比重specific gravity电阻的温度系数Temperature coefficient of resistance三、模具塑料模具moul
7、d of plastics注塑模具injection mould冲压模具die模架mould base定模座板Top clamping plateTop plateFixed clamp plate水口推板stripper plateA板A plateB板B plate支承板 support plate方铁 spacer plate底针板 ejector plate面针板 ejector retainer plate回针 Return pin导柱 Guide pin有托导套 Shoulder Guide bush直导套 Straight Guide bush动模座板Bottom clamp p
8、lateMoving clamp plate基准线datum line基准面datum plan型芯固定板core-retainer plate凸模固定板punch-retainer plate 顶针ejector pin单腔模具single cavity mould多腔模具multi-cavity mould多浇口multi-gating浇口gate缺料starving排气breathing光泽gloss合模力mould clamping force锁模力mould locking force挤出extrusion开裂crack循环时间cycle time老化aging螺杆screw麻点pi
9、t嵌件insert活动镶件movable insert起垩chalking浇注系统feed system主流道 sprue分流道runner浇口gate直浇口direct gate , sprue gate轮辐浇口spoke gate , spider gate点浇口pin-point gate测浇口edge gate潜伏浇口submarine gate , tunnel gate料穴cold-slug well浇口套sprue bush流道板runner plate排飞槽vent分型线(面)parting line定模stationary mould,Fixed mould动模movable
10、 mould, movable half上模upper mould, upper half下模lower mould, lower half型腔cavity凹模cavity plate,cavity block拼块split定位销dowel定位销孔dowel hole型芯core斜销angle pin, finger cam滑块slide滑块导板slide guide strip楔紧块heel block, wedge lock拉料杆sprue puller定位环locating ring冷却通cooling channel脱模斜度draft滑动型芯slide core螺纹型芯threaded
11、 core热流道模具hot-runner mould绝热流道模insulated runner mould熔合纹weld line (flow line)三板式模具three plate mould脱模ejection换模腔模具 interchangeable cavity mould脱模剂release agent注射能力shot capacity注射速率injection rate注射压力injection pressure差色剂colorant保压时间holdup time闭模时间closing time定型装置sizing system阴模female mould,cavity blo
12、ck阳模male mould电加工设备Electron Discharge Machining数控加工中心CNC machine center万能铁床Universal milling machine卧式刨床Horizontal planer车床Engine lathe平面磨床Surface grinding machine去磁机Demagnetization machine万能摇臂钻床Universal radial movable driller立式钻床Vertical driller超声波清洗机Ultrasonic clearing machine四、品管SPC statistic pr
13、ocess control品管保证Quality Assurance品管控制Quality control来料检验IQC Incoming quality control巡检IPQC In-process quality control校对calibration动态试验dynamic test环境试验Environmental test非破坏性试验non-destructive test光泽gloss击穿电压(dielectric) breakdown voltage拉伸强度tensile strength冷热骤变试验thermal shock test环境试验炉Environmental c
14、hamber盐雾实验salt spray test绝缘电阻测试验仪Insulating resistance meter内应力internal stress疲劳fatigue蠕变creep试样specimen撕裂强度tear strength缩痕shrink mark, sink mark耐久性durability抽样sampling样品数量sample sizeAQL Acceptable Quality level批量lot size抽样计划sampling planOC曲线operation curve试验顺序sequence of tests环境温度ambient temperatur
15、e可焊性solderability阻燃性flame resistance五、生产注塑机injection machine冲床Punch machine混料机blender mixer尼龙nylon黄铜 brass青铜 bronze紫(纯)铜 copper料斗hopper麻点pit配料compounding涂层coating飞边flash预热preheating再生料reworked material再生塑料reworked plastics工艺设计process design紧急停止emergency stop延时time delay六物控保质期shelf lifeABC分类法ABC Clas
16、sification 反常需求Abnormal Demand 措施信息Action Message 活动报告标志Action-report-flag 基于活动的成本核算Activity-based Costing (ABC) 实际能力Actual Capacity 实际成本Actual Costs 调整现有库存量Adjust-on-hand 已分配量Allocation 替代工序Alternative Routine 装配订单Assembly Order 装配零件表Assembly Parts List 装配Assembly 计划自动重排Automatic Rescheduling 可达到库存
17、Available Inventory 可用材料Available Material 达到库存Available Stock 可利用工时Available Work 可签约量Available-to-promise 平均库存Average Inventory 欠交订单Back Order 倒序计划Back Scheduling 倒冲法Back flush 未完成订单Backlog 现有库存余额Balance-on-hand Inventory 批号Batch Number 批量生产Batch Production 标杆瞄准Benchmarking 工时清单Bill of Labor 提货单Bi
18、ll of Lading 物料清单Bill of Material 分库Branch Warehouse 经营规划Business Plan 采购员Buyer 能力管理Capacity Management 能力需求计划Capacity Requirements Planning (CRP) 保管费率Carrying Cost Rate 保管费Carrying Cost 单元式制造Cellular Manufacturing 修改批量日期Change Lot Date 修改工序Change Route 修改产品结构Change Structure 检查点Check Point 闭环物料需求计划
19、Closed Loop MRP 通用工序标识Common Route ID 计算机集成制造Computer-integrated Manufacturing (CIM) 配置代码Configuration Code 约束管理/约束理论Constraints Management/Theory of Constraints (TOC) 依成本的材料清单Costed Bill of Material 急需零件Critical Part 累计提前期Cumulative Lead Time 现有运转时间Current Run Hour 现有运转数量Current Run Quantity 周期盘点Cy
20、cle Counting 调整日期Date Adjust 有效日期Date Available 修改日期Date Changed 结束日期Date Closed 截止日期Date Due 生产日期Date in Produced 库存调整日期Date Inventory Adjust 作废日期D ate Obsolete 收到日期Date Received 交付日期Date Released 需求日期Date Required 发货日期Date to Pull 空负荷Dead Load 需求管理Demand Management 需求Demand 实际能力Demonstrated Capaci
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 公司 英语 培训教材

限制150内