1、2022年-2023年建筑工程管理行业文档 齐鲁斌创作STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING DOOR STOPS STANDARD: DOOR STOPS ARE SRCURE AND STOPPING FURNITURE DAMAGE.PROCEDURE:1 Check door stop is securely fixed to w
2、all or floor.2. Check the rubber on the stop is in good condition and located correctly.3 Check the door stop is located at the correct height and position to stop the door before it hits any other item.4 Check and repair any damage on the back of the door where the stop hits it .5 Reolace any door,
3、 stop thowing signs of rust.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING RAKIO CONTROLSSTANDARD: RADIO CONTROLS ARE OPERATING AND IN GOOD ORDER.=PROCEDURE: 1 Check radio knobs operate freely and
4、lock out when another is depressed.2 Check line indicator globes are operating .3 Check engraving is colour infilled and clear.4 Check all stations are and tuned.5 Check volume control is secure and operating volume levels are correct.6 Check cover plate is not scratched or marked and is securely fi
5、xed to the wall .7 Check volume control in the batheoom operates correctly and is secure.8 Check sound reproduction from speaker is clear and speakers are not damaged.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DAT
6、E:TASK: CHECKING TOILETLET FLUSH STANDARD: TO ENSURE CORRECT OPERATION AND WATER CONSERVATIONPROCEDURE1 Depress flush button and time the flush cycle, this should not exceed 7 seconds or be less than 4 seconds.2 After the flush ensure system shuts of water supply to the bowl and starts refilling the
7、 cistern tank.3 Check the thank refill shuts off tightly, 25 mm blow the overflow pipe by removing the lid and watching the water inlet and level.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING A GU
8、ESTROOM CLOCK STANDARD: CLOCK WILL BE CHECKED AND SET AT THE CORRECT TIME EACH KEN FIX VISIT PROCEDURE:Each guestroom is equipped with an analog clock located on the bedside conetrol panel or between each bed.The clock is to be adjusted to the correct time on each visit by turning the knob in the ce
9、ntre of the clock either clockwise or anti clockwise. This will turn the minute hand and engage the hour hand each revolution to tick over the hour . When time is correctly set release centre adjust button and watch for one minute to ensure the clock ticks over one minute.Check the alarm off/on swit
10、ch is turned in the off position. To check the alarm operation depress the centre adjust dnob and set the alarm to go off I minute ahead of the time indicated on the clock. Switch the alarm, switch to on and wait for alarm to sound, when alarm has sounded switch the alarm off. STANDARDS AND PROCEDUR
11、ESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING ARTWORKSTANDARD: ENSURE ARTWORK IS IN GOOD CONDITION AND SECURELY MOUNTED TO WALL=PROCEDURE:1. Check artwork is securely mounted and fixed to wall.2. Check artwork is mount
12、ed square and level, adjust if necessary.3. Repair any scratches, marks or damage on artwork frame.4. Ensure artwork is sitting flush in frame and free of wrinkles5. Check glass for scratches of cracks and replace as necessary.6. Report any damage to artwork print to the Chief EngineerSTANDARDS AND
13、PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECKING OF VENTS STANDARD: MAINTAIN AIR CONDITIONING VENTS FREE OF DUST AND CLEAN.=PROCEDURE:Return air filters will not remove all dust particles from the air, this combin
14、ed with the static build up grills caused by air flowing continuously across grills in one direction, will cause dust build up on the grills. This is to be cleaned off with a dry cloth during each Ken Fix It visit.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HAN
15、DYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: CHECK CEILING FAN STANDARD: CEILING FAN AND RELATED SWITCH GEAR OPERATE CORRECTLY AND THE MOTOR IS KEPT FREE OF DUST BUILD UP.=PROCEDURE:1. Check the ceiling fan blades are tightly fixed to the boss. 2. Check paintwork is in good condition.3. Is
16、olate fan and clean motor vents and top blades.4. Check .directional switch is in the correct setting, fan should operate clockwise when looking up at it .5. Check switch on bedside panel operates correctly in all three positions.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT .
17、 KEN FIX IT /HANDYMANHEAD: CHIEF ENGINEER G .M . APPROVAL : DATE:TASK: WINDOW SHUTTERS CHECKSTANDARD: WINDOW SHUTTERS WILL OPERATE FREELY AND BE MAINTAINED IN GOOD CONDITION.=PROCEDURE:On each Ken Fix It visit the window shutter operation is to be checked to ensure they open and close freely and .co
18、rrectly ,check open shut arms are secure and all louvres are connected tightly. Check window shutters are secure and flush to window frame recess. Check paintwork is unmarked and touch on when necessary.STANDARDS AND PROCEDURESDEPARTMENT : JOB CATEGORY :REPAIRS AND MAINT . KEN FIX IT /HANDYMANHEAD:
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国外 著名 酒店 工程部 操作 程序 英文 REPAIRSANDMAINTENANCE 17 36
![提示](https://www.taowenge.com/images/bang_tan.gif)
链接地址:https://www.taowenge.com/p-50941982.html
限制150内