1、印度电钢综合有限公司260吨转炉及连铸工程260t converter and CCM project for EIL工艺技术规程Technical Specification(热力、通风)(thermal, ventilation)发放编号:SN.:持 有 人:Possessor(注:在确认现场实际设备与设计要求完全相符后,方可按本手册规定进行操作Note:Only after confirming that actual equipment at site is completely matching with the design,Operation can be carried out
2、 as per this manual)1. 转炉二次除尘系统工艺技术规程 Technical specification of converter secondary dedusting system1.1工艺流程:Process flow转炉二次除尘系统包括2座转炉兑铁水、出钢及散装料卸料等处在冶炼或工作过程产生的烟气和灰尘,共设一套除尘系统集中处理。Converter secondary dedusting system is designed with one set of dedusting system which is shared and used by the dust ge
3、nerating points such as 2 sets of converter for hot metal mixing, tapping and bulk unloading.转炉二次除尘烟罩 除尘管道 布袋除尘器 风机 烟囱 输灰系统 除尘灰外运经过净化处理后的气体排放浓度小于100mg/Nm3.Converter second dedusting hood dedusting pipe bag deduster fan chimney Ash conveying system dedusting dust is transported outside plantEmission
4、concentration of gas after purified is less than 100mg/Nm31.3工艺标准Process standard 转炉二次烟气风量:230104m3/h 烟气温度:120Converter secondary flue gas volume: 230104m3/h temperature of flue gas: 120散装料上料风量: 5104 m3/h 烟气温度:60Bulk charging air volume: 5104 m3/h temperature of flue gas: 60原始含尘量:23g/m3Initial dust
5、content: 23g/m3除尘器压差小于1500PaDifferential pressure of deduster is less than 1500Pa1.4工艺方法Process method1.4.1每座转炉三个排烟口;散装料上料系统除尘采用移动式皮带通风槽;Each converter is designed with three smoke vents; bulk charing system adopts travelling belt ventilation slot1.4.2 除尘器本体灰斗各阀门与料仓卸料阀连锁。除尘器本体灰斗各阀门卸料时料仓卸料阀提前两分钟打开,卸料
6、结束后料仓卸料阀延时两分钟关闭。All valves of deduster body ash bucket are interlocked with cinder valves. Cinder valves shall be opened two minutes before ash discharging from ash buckets, as well as two-minute delay close after discharging is over.1.4.3除尘器本体进口混风阀由进口烟气温度自动控制。进口烟气温度100时,混风阀自动开启,进口烟气温度80时,混风阀自动关闭。Mi
7、xed air valve of deduster proper inlet is automatic controlled by inlet flue gas temperature. When inlet flue gas temperature is 100, mixed air valve is opened automatically; when inlet flue gas temperature is 80, mixed air valve is automatic closed.1.5风机启停Start/stop of fan1.5.1检查确认Check and verific
8、ation 电机稀油站冷却水正常,启动稀油泵;Cooling water of motor lubrication oil station is normal, start oil lubrication pump. 检查风机轴承座冷却正常;Cooling for fan bearing house is normal 检查风机风门关闭;Fan damper is close 1.5.2风机运行Running of fan 现场启动电机;Field start motor 打开风机风门。Open fan damper2.混铁炉除尘系统工艺技术规程Technical specification
9、of mixer furnace dedusting system2.1工艺流程:Process flow混铁炉除尘系统用于捕集和净化混铁炉受铁水和混铁炉出铁水时产生的烟气。本系统采用高悬式覆盖吸尘罩捕集兑铁水全过程的烟尘。铁水罐上部设置顶吸罩捕集混铁炉向铁水罐倒铁水时的烟尘。兑铁水烟气采用采用高悬吸尘罩进行捕集,阻挡生成的烟气从炉口外溢。除尘方式为干式,系统形式为负压,采用布袋除尘器。Dedusting system of mixer furnace is mainly used for collecting and purifying the flue gas generated duri
10、ng hot metal received and discharged from mixer furnace. The system adopts high suspended covered smoke dust suction hood for collecting the dust generated during hot metal mixing. Suction hood is designed above the metal ladle for collecting the smoke dust generated during hot metal is poured into
11、hot metal ladle from mixer furnace. High suspension dust suction hood is adopted for collecting the flue gas during hot metal pouring, prevent the flue gas is overflowed outside from furnace. 混铁炉高悬式吸尘罩 电动阀门 除尘管道 布袋除尘器 风机 烟囱铁水包顶吸罩 电动阀门 输灰系统 除尘灰外运经过净化处理后的气体排放浓度小于100mg/Nm3。High suspension dust suction
12、hood electric valve dedusting pipeline bag deduster fan chimneyHot metal ladle top suction hood electric valve Ash conveying system dedusting dust is transported outside plant2.2工艺标准Process standard高悬式吸尘罩除尘风量: m3/hDedusting air volume of high suspension dedusting hood: m3/h铁水上部顶吸罩除尘风量:m3/hDedusting
13、air volume of suction hood above hot metal ladle: m3/h除尘总风量为: m3/hTotal air volume of dedusting: m3/h烟气温度:平均120Temperature of flue gas: average 120含尘量:2g/m3Dust content: 2g/m3除尘器压差小于1500PaDifferential pressure of deduster is less than 1500Pa2.3工艺方法Process method2.3.1除尘系统电动蝶阀与混铁炉运行连锁,混铁炉运行时阀门提前两分钟打开,
14、混铁炉运行结束后延时两分钟关闭。Dedusting system electric bufferfly valve is interlock running with mixer furnace. Valve is opened two minutes before mixer furnace running, after two-minute delay for closing after mixer furnace is stop.2.3.2除尘系统各阀门与料仓卸料连锁。卸料时提前两分钟打开,卸料结束后延时两分钟关闭。All valves of dedusting system is in
15、terlocked with bunker. It is opened two minutes before discharging and two-minute delay for closing after discharging is over.2.3.3阀门提前两分钟打开,根据实际情况可同时打开。Valve is opened two minutes in advance; also can be opened at same time as per actual condition.2.3.4除尘器本体进口混风阀由进口烟气温度自动控制。进口烟气温度100时,混风阀自动开启,进口烟气温
16、度80时,混风阀自动关闭。Mixed air valve of deduster proper inlet is automatic controlled by inlet flue gas temperature. When inlet flue gas temperature is 100, mixed air valve is opened automatically; when inlet flue gas temperature is 80, mixed air valve is automatic closed.2.4风机启停Start /stop of fan2.4.1检查确认C
17、heck and verification 电机稀油站冷却水正常,启动稀油泵;Cooling water of motor lubrication oil station is normal, start oil lubrication pump. 检查风机轴承座冷却正常;Cooling for fan bearing house is normal 检查风机风门关闭;Fan damper is close2.4.2风机运行Fan running 现场启动电机,打开风机风门Field start motor, open fan damper2.4.3风机停止 关闭风机风门。Field star
18、t motor 现场停止电机。Field stop motor3. 地下料仓除尘系统工艺技术规程Technical specification of underground bunker dedusting system1.1工艺流程:Process flow地下料仓除尘系统包括料仓、散装料卸料等处在运行或工作过程产生的烟气和灰尘,共设一套除尘系统集中处理。Total one set of dedusting system is designed for underground bunker dedusting system, which is mainly used for collecti
19、ng the smoke and dust generated by bunker running and bulk discharging.地下料仓受料皮带卸料除尘烟罩 除尘管道 布袋除尘器 风机 烟囱 输灰系统 除尘灰外运经过净化处理后的气体排放浓度小于100mg/Nm3。Underground bunker recevingBelt discharging dedusting dust hood dedusting pipeline bag deduster fan chimney Ash conveying system dedusting dust is transported ou
20、tside plantEmission concentration of gas after purified is less than 100mg/Nm31.3工艺标准Process standard 屋顶除尘罩除尘风量: 23.6104m3/h 烟气温度:60Dedusting air volume of roof dedusting hood: 23.6104m3/h temperature of flue gas: 60皮带卸料除尘风量: 50.4104 m3/h 烟气温度:60Dedusting air volume of belt discharging: 50.4104 m3/h
21、 temperature of flue gas: 60原始含尘量:23g/m3Initial dust content: 23g/m3除尘器压差小于1500PaDifferential pressure of deduster is less than 1500Pa1.4工艺方法Process method1.4.1地下料仓受料采用屋顶除尘罩,皮带卸料采用局部密封吸尘罩。设定地下料仓有2个料仓同时受料,屋顶除尘罩电动蝶阀与受料料仓连锁;Roof dedusting hood is adopted for underground bunker receiving; belt dischargi
22、ng adopts partial sealing dust suction hood. 2 bunkers are designed for receiving together; electric butterfly valve of roof dedusting hood is interlocked with receiving bunker.1.4.2 除尘器本体灰斗各阀门与料仓卸料阀连锁。除尘器本体灰斗各阀门卸料时料仓卸料阀提前两分钟打开,卸料结束后料仓卸料阀延时两分钟关闭。All valves of deduster body ash bucket are interlocked