1、Chapter 5: Examination and Inspection Program第5章 检查和检验程序5.1 General 概述5.1.1 This Chapter describes the manufacturing process examination, testing and inspection on Code Item to ensure that all activities are in compliance with the requirements of the ASME Code and the Customer at shop. 本章叙述了在车间制造过程中
2、对ASME规范产品的检查、试验和检验的控制要求,以保证全部活动符合ASME规范和客户的要求。5.1.2 The QC Engineer shall be responsible for control of the examination and inspection for the Code Items in accordance with the requirements of ASME Code, QC Manual and Customer Specificatio. 质控工程师负责控制规范产品的检查和检验符合ASME规范,本质量控制手册,和客户技术要求。5.2 Process Che
3、ck List工序检查单5.2.1 The Process Engineer shall prepare the “Process Check List” (PCL) (Exhibit 5-1). The PCL shall list all required fabrication operations, examinations, inspections, tests, and specific process according to sequences of fabrication process. The PCL shall have space for the Examiner,
4、the Customer and the AI to sign and date. 工艺工程师应编制“工序检查单”(PCL) (表5-1)。PCL应列出制造过程中所有必需的制造方式、检查、检验、试验、特殊工艺。工序检查单(PCL)应预留专栏以备检验员、客户和AI签名并填写日期。5.2.2 The QC Engineer shall review the PCL and enter all necessary “In House” inspection and customers additional requirements when necessary. Then the PCL shall
5、 be submitted to the Technical Manager for approval with signature and date. The QC Engineer shall present the approved PCL with other relative documents to the AI for review with signature and date and also for the designation of Hold Points (H-point), Witness points (W-point). 质控工程师应审核工序检验单 (PCL),
6、必要时应输入客户的附加检验要求,PCL应提交技术经理批准并签名和加写日期。质控工程师应该将经过批准的PCL与其他相关文件一起提交给AI审核并指定停工待检点 (H-point) ,现场见证点 (W-point) ,并签名加写日期。5.2.3 When the drawing is revised, the Process Engineer shall revise the PCL accordingly if necessary. When revision to the PCL is made, it shall be controlled in the same manner as the
7、original. The superseded PCL shall be attached to the revised PCL for reference and be submitted to the AI for review. 当设计图纸被修改时,如有需要工艺工程师应修改PCL。修订后的PCL应该与原版本一样审核批准。作废的PCL应该附加在修订后的PCL上用作参考并给授权检验师以供审核时做参考。5.2.4 On completion, the PCL is then forwarded by the QC Engineer to the Doc. Clerk for file and
8、 issue. 审核结束后,质控工程师将PCL转交给资料管理员存档和发放。5.3 Control of Manufacturing Process and Examination制造过程的控制和检查5.3.1 The manufacturing process shall be performed by the Operator and/or Welder under supervision of the Shop Supervisor according to PCL, drawings and procedures. The Shop Supervisor shall inform the
9、 status of fabrication process to the QC Engineer to assign the Examiner to perform the operation. When NDE required, the QC Engineer shall inform the NDE Level III personnel to assign the NDE personnel to perform the operation. 根据PCL,设计图纸和程序文件,生产过程应该由操作员或焊工在车间主管监督下完成。车间主管应该将工序制造的状态告知质控工程师以便指派检验员执行检
10、验。当要求NDE时,质控工程师应该通知NDE三级人员指派NDE人员进行检验。5.3.2 The Examiner shall perform examinations according to applicable examination and test procedures specified on the PCL. The Examiner shall prepare the “Inspection and Examination Record” (Exhibit 5-2) as required. The Examiner shall evaluate the results of t
11、he examinations and tests, then sign and date on the PCL.检验员应按工序检验单 (PCL) 所指定的检验和测试程序进行检验。检验员应按要求准备“过程检验记录”(表5-2)。检验员应评估检验和试验结果,并在工序检验单 (PCL) 上签名、填写日期。5.3.3 Fabrication to a next stage is not permitted unless the relevant examination stage marked on the PCL has been accepted and signed and dated for
12、 the Examiner and /or AI respectively. 只有当相关检查阶段上标明PCL最近已分别被检验员或者授权检验师接受,签名加写日期后,制造才能进入下一阶段。5.3.4 AIs Inspection授权检验师的检验:5.3.4.1 The QC Engineer shall notify the AI reasonably in advance of approaching AIs “H”-point and “W”-point. 在接近授权检验师所指定的停止待检点 (H-point) 和现场见证点 (W-point) 前,质控工程师应提前通知授权检验师。5.3.4.
13、2 The “H”-points designated by the AI shall not be bypassed without presence of the AI. The AIs acceptance shall be indicated by signature and date on the PCL. 由AI确定的停工待检点 (H-point) 不能错过,必须有AI在场, 见证合格后AI在工序检验单过程 (PCL) 上签字并填写日期。5.3.4.3 For “W”-point designated by the AI, generally, the AI shall be in
14、 presence. In certain instance, the AIs “W” points may be waived with the AIs permission. If the AI is unable to attend, the Examiner shall note the date notified by the AI on PCL. In-house inspections will be made and results shall be available and acceptable to the AI during next visit. AI指定的见证点 (
15、W) 一般情况是AI需到场见证, 但如AI不能到场见证, 需事先得到AI的许可通知,检验员应在PCL上注明通知AI的日期,这个检验点由检验员检查合格后认可。检查记录应在AI下一次来厂时提交给AI认可。5.3.4.4 For spot RT according to UW-52, the RT location shall be chosen by AI. If the AI is not free, the QC Engineer will be allowed by the AI to choose the RT location. 对于按UW-52抽样射线检测时,抽样位置应由AI指定。如果
16、AI没空,AI同意质控工程师确定抽样位置。5.3.4.5 The QC Engineer is responsible to provide opportunity for the AI to perform internal inspection prior to final closure, if no access openings are provided. 对于规范产品未设置检查孔时, 质控工程师应在产品最后一条封闭焊缝焊接前, 通知AI对产品内部进行检验。5.3.5 When nonconformity is found, the disposition shall be cont
17、rolled in accordance with Chapter 6 of this Manual. The Examiner shall record the NCR No. on the PCL. 当发现不符合项时,按本手册第6章进行处理。检验员应在工序检验单(PCL)上记录不符合项报告编号。5.3.6 Production Test产品试板5.3.6.1 The Welding Engineer shall prepare a procedure for impact test for welding production test plates according to ASME C
18、ode Section VIII Div.1 when impact test is required. 当要求冲击试验时,焊接工程师应该根据ASME 规范第VIII 卷第1册的要求为焊接试板准备冲击试验程序。5.3.6.2 The impact test will be subcontracted to a vendor who is qualified by the Welding Engineer and holds an impact test machine meeting the requirements of the Code. Prior to testing, the Pro
19、cess Engineer shall be responsible for obtaining from the vendor and maintaining a copy of the valid calibration certificates of Charpy impact test machine and temperature measuring instruments to ensure that the vendors Charpy impact test machine shall have been calibrated annually in accordance wi