2022年管理资料-技术交底站内电缆沟开挖安全技术交底.doc
《2022年管理资料-技术交底站内电缆沟开挖安全技术交底.doc》由会员分享,可在线阅读,更多相关《2022年管理资料-技术交底站内电缆沟开挖安全技术交底.doc(8页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、此材料由网络搜集而来,如有侵权请告知上传者立即删除。材料共分享,我们负责传递知识。治理材料-技术交底站内电缆沟开挖平安技术交底Content of Disclosure:交底内容:Technical Disclosure:1、挖沟时施工人员之间应保持35m的间隔。在有地下光、电缆和管路的地点挖沟、坑时,应理解地下设备的用途、埋设位置,并与有关部门联络,做好防护后再施工。It is necessary to keep a distance of 3 to 5 meters from the place where excavation is performed. When trench in t
2、he places where there are underground optical cables, electrical cables and pipes, it is necessary to understand the purpose and location of the underground facilities, contact with the relevant departments, and carry out good protection before construction.2、当挖沟、坑阻碍行人阻碍交通或站内作业时,应在施工地点35m处加设防护,并应当天回
3、填夯实。如需过夜时,需搭人行便桥、通车便道,并设防护栏和警示灯,必要时应派专人监守。在有倒塌危险的房屋、围墙附近开挖时应对其临时加固。When trench affects traffic or station operations, set up protection facilities 3-5 meters from the construction site and backfill and compact the trench the same day. In case of overnight, it is need to take temporary decking across
4、 open trench, set fences and warning lights, and send someone to take care of it when necessary. When trench in the vicinity of houses and fences are at risk of collapsing, it is necessary to reinforce them temporarily.3、严禁在阻碍路基稳定的范围内挖沟、坑,在铁路沿线或穿越铁路挖沟、坑时,摆放的料具和挖出的土石严禁侵入根本建筑限界,并应采取防止塌落的措施。It is prohi
5、bited to trench within the area which would impact stability of roadbed. When trench along the railway or crossing the railway, related materials, tools, excavated earth and rock are not allowed to put into the construction boundary and measures should be taken to prevent collapse.4、电缆、光缆敷设需通过铁路、公路、
6、繁忙车道时开挖时间尽量选择在车辆最低峰进展,并应采取平安防护措施。If optical and electrical cable have to across the rail, road, and busy lane, try to avoid rush hours and should take safety measures.5、挖沟、坑的弃土应距沟、坑边0.4m以外。堆土高度不应高于1.5m。Trench spoil pit should be placed away from the trench by at least 0.4 meter with a height of less
7、 than 1.5m.6、在土质松软地带挖沟、坑时应按斜坡形开挖,坡度的大小应按照土壤的性质、湿度及坑深确定,宜符合下表的规定:When trench in soft soil area, excavate a slope with its angle based on the nature, moisture of the soil and pit depth. The slope should meet the following requirements:沟、坑的坡度表Table of slope of trench and pit土 壤 性 质Type of soil坡 度Slope砂
8、土、淤泥Sandy soil, silt1:0.75砂质黏土Sandy clay1:0.5黏 土 及 黄 土Clay and Loess1:0.3坚 土Pan soil1:0.157、挖水沟、坑及流沙沟、坑时应采纳防护板或沉箱等加固措施。Digging ditches, pits and sandy ditch, pit, reinforcement measures like protection shield or caisson should be taken.8、防护板的安装或撤除应有人监护。严禁将防护板一次全部撤除。强流沙地带不宜撤防护板。Installation or remova