1、基坑围护、降水及土方开挖工程专项施工方案Special Construction Scheme of Foundation Ditch Support, Precipitation and Earthwork Excavation Engineering一、工程概况Project Overview1.1 概述Summary工程名称:上海联恒异氰酸脂有限公司MDI扩建项目工艺装置土建工程、Project Name:Lian heng isocyanate resin co., LTD. Shanghai MDI expansion devices is civil engineering工程地址
2、:上海市漕泾化工区楚华路25号Project Address: Shanghai caojing chemical OuChuHua road no. 25建设单位:上海联恒异氰酸脂有限公司The construction units: Shanghai lian heng isocyanate resin co., LTD设计单位:上海科元燃化工程设计有限公司Design unit: Shanghai yuan combustion engineering design co., LTD勘察单位:上海岩土工程勘察设计有限公司Prospecting units: Shanghai geotec
3、hnical engineering survey and design co., LTD施工单位:中国核工业中原建设有限公司Construction unit: China nuclear industry zhongyuan construction co., LTD监理单位:上东洋工程(上海)有限公司Supervision units: the Oriental engineering (Shanghai) co., LTD1.2工程概况Project Overview:本工程位于上海市漕泾化工区楚华路25号,上海巴斯夫聚氨酯有限公司内的A400地块上。而上海联恒异氰酸脂有限公司MDI扩
4、建项目工艺装置土建工程,由MDI合成单元、MDI初期雨水池、MDA初期雨水池、MDA处理单元、雨淋阀室和管架五大单元组成。This project is located in Shanghai City Caojing Chemical District Chu Hua Road No. 25, Shanghai BASF Polyurethane Co. Ltd in A400 block. And Shanghai Lianheng ISO cyanate grease Co., Ltd. MDI expansion project process device for civil eng
5、ineering. By synthesizing MDI unit, MDI early rain pool, MDA in the early rain pool, MDA treatment unit, the deluge valve chamber and tube frame five unit composed.1.3 基坑概况Foundation Ditch Overview :1.3.1 MDI合成单元Synthetic unit(1)光气隔离舱、HCL吸收及尾气处理的垫层底标高-2.25m,板底厚为1200mm,垫层厚100mm,建筑面积为638.44m。本工程设计标高10
6、0.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为2.25m。其中,水池的垫层底标高-5.90m,板厚为1000mm,垫层厚100mm,建筑面积为31.59。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为5.9m。(1) The phosgene compartment, HCL absorption and tail gas treatment of cushion botto
7、m elevation of 2.25 m, the bottom of the plate thickness is 1200 mm, cushion thickness of 100 mm, with a construction area of 638.44 m squared. This engineering design elevation of 100.000 m by 0.000 mm to cope with the absolute level of wusong elevation + 4.500 m, field inside the natural ground el
8、evation is about 4.500 m + absolutely, is the relative elevation + / - 0.000 m, the excavation depth of 2.25 m. Pool of cushion bottom elevation of 5.90 m, the thickness is 1000 mm, cushion thickness of 100 mm, with a construction area of 31.59 . This engineering design elevation of 100.000 m by 0.0
9、00 mm to cope with the absolute level of wusong elevation + 4.500 m, field inside the natural ground elevation is about 4.500 m + absolutely, is the relative elevation + / - 0.000 m, the excavation depth of 5.9 m. (2)HCL压缩机的垫层底标高-1.18m,板厚为1000mm,垫层厚100mm,建筑面积为127.02。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标
10、高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为1.18m。(2)HCL compressor cushion bottom elevation of 1.18 m, thickness is 1000 mm, cushion thickness of 100 mm, with a construction area of 127.02 . This engineering design elevation of 100.000 m by 0.000 mm to cope with the absolute level of wusong e
11、levation + 4.500 m, field inside the natural ground elevation is about 4.500 m + absolutely, is the relative elevation + / - 0.000 m, the excavation depth of 1.18 m.(3) 氯苯冷却、氯苯精馏的承台垫层底标高-2.17m,承台厚度1300mm,垫层厚度100mm;地梁的梁顶标高-0.77m,根据地梁的截面尺寸对梁底进行开挖,其垫层厚度100mm,建筑面积为:2861.71m。本工程设计标高100.000m为0.000所应对的绝对标高
12、为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为2.17m。(3) the effects of cooling, chlorobenzene rectifying cap cushion bottom elevation of 2.17 m, the thickness of the pile caps is 1300 mm, cushion thickness 100 mm; Ground beam beam top elevation of 0.77 m, the base beam to the excavation of t
13、he bottom of the beam, the section size of the cushion thickness is 100 mm, with a construction area of for: 2861.71 m squared. This engineering design elevation of 100.000 m by 0.000 mm to cope with the absolute level of wusong elevation + 4.500 m, field inside the natural ground elevation is about
14、 4.500 m + absolutely, is the relative elevation + / - 0.000 m, the excavation depth of 2.17 m.1.3.2 MDI初期雨水池Early rain poolMDI初期雨水池的垫层底标高-3m,板厚为500mm,垫层厚100mm,建筑面积为64.89。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为3m。其积水坑的垫层底标高-3.45m,板厚为500mm,垫层厚100mm,建筑面积为6.2
15、5。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为3.45m。MDI rain early cushion pond bottom elevation -3m, a thickness of 500mm, cushion thick 100mm, construction area of 64.89. The engineering design elevation 100.000m addressed by an absolute elevation 0.000 Wuson
16、g elevation + 4.500m, natural floor space inside the absolute elevation of about + 4.500m, is the relative elevation 0.000m, the excavation depth of 3m. Its water pit bottom cushion elevation -3.45m, a thickness of 500mm, cushion thick 100mm, construction area of 6.25. The engineering design elevati
17、on 100.000m addressed by an absolute elevation 0.000 Wusong elevation + 4.500m, natural floor space inside the absolute elevation of about + 4.500m, is the relative elevation 0.000m, the excavation depth is 3.45m.1.3.3 MDA合成单元Synthesis unit(1)合成单元的承台垫层底标高-2.10m,承台厚度1200mm,垫层厚度100mm;地梁的梁顶标高-0.80m,根据地
18、梁的断面尺寸对梁底进行开挖,其垫层厚度100mm;排水沟的垫层底标高为-0.85m,根据图纸的设计要求,底板厚度150-450mm,建筑面积为:2861.71m。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为2.10m。(1) Synthesis units elevation -2.10m, caps thickness 1200mm, cushion thickness 100mm; top elevation beam to beam -0.80m, cross-sec
19、tional dimensions of the beam at the end of the beam base excavation, the mat thickness of 100mm; cushion bottom elevation drains -0.85m, according to the design requirements of the drawings, floor thickness 150-450mm, construction area: 2861.71m. The engineering design elevation 100.000m addressed
20、by an absolute elevation 0.000 Wusong elevation + 4.500m, natural floor space inside the absolute elevation of about + 4.500m, is the relative elevation 0.000m, the excavation depth is 2.10m.(2)二级冷却水系统、蒸汽吸收系统的承台垫层底标高-1.81m,承台厚度1000mm,垫层厚度100mm;地梁的梁顶标高-0.71m,根据地梁的断面尺寸对梁底进行开挖,垫层厚度100mm;排水沟的垫层底标高为-0.76
21、m,根据图纸的设计要求,底板厚度300-500mm,建筑面积为:661.20m。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为1.81m。(2) Bottom cushion caps secondary cooling water systems, vapor absorption system level -1.81m, caps thickness 1000mm, cushion thickness 100mm; Beams Beams top elevation -0
22、.71m, cross-sectional dimensions of the beam to beam Base excavation bottom, cushion thickness 100mm; cushion bottom elevation drains -0.76m, according to the design requirements of the drawings, floor thickness 300-500mm, construction area: 661.20m. The engineering design elevation 100.000m address
23、ed by an absolute elevation 0.000 Wusong elevation + 4.500m, natural floor space inside the absolute elevation of about + 4.500m, is the relative elevation 0.000m, the excavation depth is 1.81m.1.3.4 MDA初期雨水池Early rain poolMDA初期雨水池的垫层底标高-2.95m,板厚为500mm,垫层厚100mm,建筑面积为32.34。本工程设计标高100.000m为0.000所应对的绝对
24、标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为2.95m。其积水坑的垫层底标高-3.45m,板厚为500mm,垫层厚100mm,建筑面积为6.50。本工程设计标高100.000m为0.000所应对的绝对标高为吴淞标高+4.500m,场地内部自然地面绝对标高约为+4.500m,即为相对标高0.000m,则开挖深度为3.45m。MDA rain early cushion pond bottom elevation -2.95m, a thickness of 500mm, cushion thick 100mm, construc