1、精选优质文档-倾情为你奉上锂离子电池技术英文词句2.3 assembly line process(5/15)流水线工艺film loading-vacuum on-film folding-sliding jig backward-top cutting-sliding jig forward-vacuum off-film unloading 放上包装膜抽真空包装膜折叠-分切夹心的后端-剪掉顶部-分切夹心的前段-释放真空-拿下包装膜station 岗位 two station 两个岗位folding 折叠 guide type 指导方式top cutting 顶部剪切 knife 刀片2.
2、3 assembly line process(6/15)流水线工艺j/r loading-vacuum on-j/r jig backward-bottom former up-upper former down-放极组-抽真空-极组夹具放在后端-模板末端在上面-顶端在下面-heating forming-former up,down-j/r jig forward-vacuum off-j/r unloading加热模板-模板上下翻转-极组夹具朝前-释放真空-取下极组station two station岗位 两个岗位heating forming pressing time,preset
3、 timer加热模板 施压时间 施压次数temperature thermocouple温度热电耦time:mmin,2max.3sec时间:press force :4050kg压力temperature:150温度2.3 assembly line process(7/15)流水线工艺film loading-fim clamp-sliding jig backward-edge pushing-tab clamp-tab unclamp-放上包装膜-包装夹具-分切极组末端-整边-放极耳夹具-卸下极耳夹具sliding jig forward-cell unloading分切极耳前端sta
4、tion two stationheat sealing top热封sealing thickness control(micrometer)热封厚度控制(毫米)sealing control pressing time,preset timer热封控制 施压时间 施压次数precision regulator精度校准temperature, thermocouple温度热电耦time :min.2max.3sec时间press force:250kg压力temperature:180250温度2.3 assembly line process(9/15)流水线工艺cell loading-v
5、acuum on-sliding jig backward-side cutting-feeding-tab cutting-放上电芯-抽真空-滑动夹心后端-裁边-流入下工序-剪极耳sliding jig forward-cacuum off-cell unloaing滑动夹心前端-释放真空-取下电芯station two stationside cutting knifeside cutting force 100kgtab cutting knifetab cutting force 100kg 2.3 assembly line process(10/15)流水线工艺cell loadi
6、ng-sliding jig backward-vacuum pad down-open-needle down-e/l filling(e/l-needle up-needle up-vacuum pad up-sliding jig forward-cell unloadingstation two statione/l supply 3kuter sub-tank on equipmentmetering pump hi -bar pump,hbd-2bc-17 accuracy; under 3.0;0.1g ocer 3.0; 3.5g2.3 assembly line proces
7、s(11/15)流水线工艺cell loading-sliding jig backward-jig backward-jig up-vacuum(vacuum chamber)-放上电芯-滑动夹心后端-夹心向后-再向上-抽真空-sealing block forward-sealing热封前端- 密封-sealing block backward-jig down-silding jig forward-cell loading-formation热封后端- 夹心翻转向下-滑动夹心前端-取下电芯-成型station two stationvacuum source 740mmhg max.v
8、acuum pumpsealing control pressing time preset tiomerpressing force, precision regulatortemperature, thermocouple热电偶time:min.3max4secpress force:250kgtemperatrure:1802502.3 assembly line process(12/15)流水线工艺cell loading-conveyor drive-numbering-numbering-head down-vacuum on-放上电芯- 启动传送带- 编号码-编号码-电芯朝下-
9、抽真空head up-head forwward-head down-vacuum purge-head up-cell unloading电芯朝上- 电芯朝前- 电芯朝下-真空净化- 电芯朝上-取下电芯speed controller motor 25Wnumbering ink jet printercell unloading magacine2.3 assembly line process(13/15)流水线工艺piercing-cell loading-sliding jig backward-jig up-vacuum°assing-穿透?- 放电芯-滑动夹心后端-夹心向上
10、- 抽真空&脱气sealing block forward-sealing-sealing block backward-jig down-sliding jig forward-cell loading热封前端- 热封 热封后端-滑动夹心前端 取电芯station two stationpiercing 6holevacuum source 750mmhg max.vacuum pumpsealing comtrol pressing time ,preset timerpressing force,preision regulator调整压力temperature,thermocouple
11、(温度热电偶)time: min.3max.4sec时间press force:250kg(压力)temperature:180250(温度)2.3 assembly line process(14/15)流水线工艺cell loading-vacuum on-sliding jig backward-cutter down-cutting-cutter up-放电芯-抽真空-滑动夹心后端-切割刀具向下-切割-切割刀具向上sliding jig forward-vacuum off-cell loading滑动夹心前端- 释放真空-取下电芯电池封口-cutting(切断) knife(刀)2.
12、3 assembly line process(15/15)流水线工艺cell loading-ist folding-2nd folding-heat pressing-3nd folding-4th folding(sicing)放电芯- 第一次折叠-第二次折叠-热压-第三次折叠-第四次折叠cell unloading取下电芯manual-loading-2st foliding-heat pressing-3nd folding-4th folding手工 放上- 第二次折叠- 热压- 第三次折叠- 第四次折叠cell transfer linear transferfolding ac
13、tuator pneumatic actuatorheat pressing pressing time,preset timerpressing forceprecision regulatortemperature, thermocoupletime:min.2max.3 secpress force:40kgtemperatrure:801002.3 assembly line process(1/6)流水线工艺jelly roll supply-jelly roll loading-cell alignment-tab straightening-提供极组-放上极组-电芯排列好-将极耳
14、伸直sealant sealing(sealant film supply)-sealant sealing(sealant film supply)-final sealing-密封胶密封(密封膜供给)-密封胶密封(密封膜供给)-最终的密封sealant film check-tab forming-jelly roll unloading(ng unloading)检验密封膜-极耳成型-取下极组2.3 assembly line process(2/6)流水线工艺al-foil supply-pre heating(contact)-pouch forming-pouch punch ou
15、t-?供应箔(铝塑膜?)-预热(连接)-成型成袋状- 袋状膜冲压打孔pouch loading(pouch pin hole check)-pouch loading-ist folding-lst folding-2nd folding-放上袋状膜(检验针孔)-放上袋状膜- 第一次折叠-第二次折叠top cutting(ng unloading)-jelly roll insertion(jelly roll alignment-jelly roll loading)剪掉顶部插入极组(调整极组-放上极组)3nd folding-pre heat sealing-package unloadi
16、ng第三次折叠-预热密封取下包好的电芯2.3 assembly line process(3/6)流水线工艺cell loading-lst top sealing-2nd top sealing-top cooling-side sealing-side cooling-放上电芯-第一次顶部密封-第二次顶部密封-顶部冷却封边两边冷却side cutting-short check-cell unloading-ng unloading裁边- 测短路取下电芯ng是什么啊?package loading-pre weighing-package opening-e/l filling(e/l d
17、ispensing e/l supply tank)放上包装好的电芯预称重打开电芯- 注液(分配电解液 电解液供给罐)-lst vacuum-2nd vacuum -lst sealing-2nd sealing-plst-weighing-package unloading-第一次抽真空-第二次真空-第一次密封-第二次密封-?-称重-取下电芯package loading-package aging-formation 放上电芯-电芯老化-化成cell loader-cell-loading-piercing-vacuum°assing heat sealing-2nd sealing
18、-装电芯设备-电芯-装上电芯穿透(?)-抽真空& 脱气 热封第二次密封side trimming-cell unloading 修边- 取下电芯cell loading-lst folding-2nd folding-3rd folding-4th folding-5th folding(sizing)-放电芯-第一次折叠-第二次折叠-第三次折叠-第四次折叠-第五次折叠(量尺寸)5th folding(sizing)-tab cutting-height&vision check-final weighging-final weighting-第五次折叠(量尺寸)-剪极耳-检验高度&视觉-最后
19、称重ng rejection-cell unloading-cell unloading-cell palleticing 挑选,排除-取下电芯- (用托盘)搬运电芯?1.1assembly line specification products流水线特殊产品can type(壳体类型) aluminum can(A3003) 铝壳(材质A3003) conventional prismatic type ,not oval type 传统的方型,不是椭圆型model of cell电池型号 basic design model:xx-yyzz基本设计型号:XX-YY-ZZrange 范围 w
20、:3034mm t:4.010mm h:4067mm宽: 厚: 高:cathode tab正极耳 AL,t0.080.12mm,w3/4mm铝带,厚度0.080.12mm宽度3/4mmwelding to top cap with ultrasonic welder 用超声波焊接机超焊在极片头部anode tab负极耳 ni,t0.080.12mm,w3/4mm镍带,厚度0.080.12mm宽度3/4mmwelding to top cap with resistance spot welder用阻抗点焊机 焊在极片头部can seam welding壳盖的缝隙焊接 side welding侧
21、面焊接top insulator 顶部绝缘片 injection molded注液模具bottom tape wrapping底部贴胶纸 pp-tape,same as j/r wrapping tape, roll,w:2832mmt:0.050.10mm o.d:200mm core id:3inchesfor xx30zz width 28mm,for xx34zz width 32mmfill port welding 补焊砂眼 AL Ball (Al050,1.370.03mm),laser seam welding 激光焊接e/l filling accuracy 精确注液量 un