1、ADB PRCM Jiang H.(hjiangadb.org)1ADB Resident Mission in the PRC亚行驻中国代表处Procurement Preparation and Bid Packaging 采购准备和分包计划编制采购准备和分包计划编制ADB PRCM Jiang H.(hjiangadb.org)22.Procurement Preparation采购准备工作EA Capacity Assessment 执行机构的能力评估Procurement Plan 采购计划Advanced Procurement Action 提前采购活动Use of Agenci
2、es 代理的使用Bid Packaging 划分合同包ADB PRCM Jiang H.(hjiangadb.org)32.Procurement Preparation 采购准备工作EA Capacity Assessment 执行机构的能力评估Purpose:目的:identify the capacity,procedural and organizational constraints that will hinder effective Project implementation and agree an action plan to address these constrain
3、ts;确定在能力、程序和机构方面对有效的项目实施带来障碍的制约因素,并同意采取相应措施的行动计划determine the overall procurement risk and put in place appropriate review and supervision processes and thresholds to mitigate those risks,决定总的采购的风险,并采取相应的检查和监督程序,来减低这些风险To the maximum extent possible and sensible,ensure that procurement is undertaken
4、 by the regular line units within the EA,agreeing in the action plan measures to strengthen and support these units when necessary thereby ensuring that EA capacity is built beyond the projects lifecycle.达到最大程度,以确保采购活动是由执行机构的常规部门来完成,行动计划中的措施要加强并支持这些部门的能力建设,如果需要,在项目周期之外继续执行机构的能力建设ADB PRCM Jiang H.(hj
5、iangadb.org)4The Capacity Assessment will become a requirement of the detailed procurement plan guide and be used to justify review procedures,inc.the introduction of post review能力评估将成为采购计划指南的所要求完成的一个部分,并将用来评估亚行的审查程序(包括使用后审查的方式)Until the detailed guide is issued,inc.instructions on doing capacity as
6、sessment,capacity assessments are not required and post review procedures should not be proposed.在采购计划指南(包括能力评估的方法)颁布之前,能力评估暂不作要求,同时后审查程序也不可以使用2.Procurement Preparation 采购准备工作EA Capacity Assessment 执行机构的能力评估ADB PRCM Jiang H.(hjiangadb.org)52.Procurement Preparation 采购准备工作Procurement Plan 采购计划Over$10
7、0,000 in value,list all packages by procurement method and the date by which procurement activity to commence.十万美元以上:列出所有合同,包括采购方式,和开始执行的日期Below$100,000,the method of procurement is to be indicated 十万美元以下,只列出采购方式prepared by the borrower,be annexed to the RRP由借款人准备,是RRP的一个附件not a substitute for a pro
8、ject implementation schedule which details the major activities 不可替代项目实施计划,be updated annually on a rolling 18-month basis.涵盖项目之初的18个月,每年更新,以18个月为滚动周期Not required to publish Procurement Plan locally,but encouraged to do so.鼓励但不要求必须在当地公开发布。ADB PRCM Jiang H.(hjiangadb.org)62.Procurement Preparation 采购
9、准备工作Procurement Plan 采购计划Contents 内容:The particular contracts for goods,works,and consultants services 货物,工程和咨询服务合同The proposed method of procurement of such contracts 每个合同的采购方式The related ADB procedures 相关的亚行程序Threshold values for procurement methods to be applied 各个采购方式的基础限额The procurement that wi
10、ll be subject to ADBs post review 需要亚行后审查的采购合同A list of significant procurement packages with milestone dates 主要合同包清单,包括关键日期ADB PRCM Jiang H.(hjiangadb.org)72.Procurement Preparation 采购准备工作Procurement Plan 采购计划 流程图ADB PRCM Jiang H.(hjiangadb.org)82.Procurement Preparation 采购准备工作Procurement Plan 采购计划
11、Project InformationCountryP.R.ChinaName of BorrowerProject NameLoan or TA referenceDate of EffectivenessAmount US$Of which committed,US$Executing AgencyApproval Date of Original Procurement Plan Approval of most recent Procurement PlanPublication for Local AdvertisementsPeriod covered by this procur
12、ement planADB PRCM Jiang H.(hjiangadb.org)92.Procurement Preparation 采购准备工作Procurement Plan 采购计划Procurement Thresholds Goods&Related Services,Works and Supply and Install(Illustration only)Procurement MethodTo be used above(Value$)ICB Works$10,000,000ICB Goods$1,000,000NCB Works$10,000,000NCB Goods$
13、1,000,000Shopping Works$100,000Shopping Goods$100,000Exceptional Methods:LIB$200,000Consultants Qualification Selection(CQS)$200,000Least Cost Selection(LCS)$100,000Alternative Methods:Quality based selection(QBS)Single source selection(SSS)ADB PRCM Jiang H.(hjiangadb.org)112.Procurement Preparation
14、 采购准备工作Procurement Plan 采购计划List of contract packages in excess of$100,000 Illustration onlyADB PRCM Jiang H.(hjiangadb.org)122.Procurement Preparation 采购准备工作Bid Packaging 划分采购包Principles 原则Types of Contracts 合同类型Methods of Procurement 采购方式ADB PRCM Jiang H.(hjiangadb.org)13Type and Size of Contracts
15、 合同的类型和大小Contract size to attract international competition 吸引国际竞争Supply Contracts involve delivery of goods to location indicated in the contract.May include related services such local handling and transportation,installation,testing and commissioning,training,etc.供货合同供货合同Works Contracts involve e