锚杆注浆施工记录表(共8页).doc
《锚杆注浆施工记录表(共8页).doc》由会员分享,可在线阅读,更多相关《锚杆注浆施工记录表(共8页).doc(11页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上锚杆注浆施工记录表工程名称施工单位注浆配合比强度施工部位设计孔径钻孔编号钻孔直径(mm)水灰比初灌开始时间终止时间初次灌浆压力(Mpa)二次灌浆开始时间二次灌浆终止时间灌浆量(m3)二次灌浆压力(Mpa)日期11800.58:008:030.614:2514:280.350.352012-7-1721800.58:038:060.614:2914:310.350.352012-7-1731800.58:068:090.614:3214:340.350.352012-7-1741800.58:098:120.614:3514:370.350.352012-7-17518
2、00.58:128:150.614:3814:400.350.352012-7-1761800.58:158:180.614:4214:450.350.352012-7-1771800.58:188:210.614:4714:500.350.352012-7-1781800.58:228:250.614:5214:560.350.352012-7-1791800.58:268:290.614:5815:000.350.352012-7-17101800.58:308:330.615:0115:040.350.352012-7-17111800.58:348:360.615:0515:080.3
3、50.352012-7-17121800.58:388:390.615:1015:130.350.352012-7-17131800.58:418:430.615:1515:180.350.352012-7-17141800.58:458:480.615:1915:210.350.352012-7-17151800.58:508:530.615:2215:250.350.352012-7-17161800.58:558:570.615:2715:290.350.352012-7-17171800.58:589:000.615:3015:330.350.352012-7-17181800.59:
4、039:060.615:3415:370.350.352012-7-17191800.59:089:110.615:3915:420.350.352012-7-17201800.59:139:150.615:4315:470.350.352012-7-17211800.59:179:190.615:4815:520.350.352012-7-17221800.59:219:230.615:5515:570.350.352012-7-17231800.59:259:270.615:5916:020.350.352012-7-17备注锚杆灌浆材料及水灰比为水:水泥,钢筋型号:328; 61500连
5、接筋 固定件324钢管1500质检人员: 技术负责:施工负责: 监理(建设)单位:编号:锚杆注浆施工记录表工程名称施工单位注浆配合比强度施工部位设计孔径钻孔编号钻孔直径(mm)水灰比初灌开始时间终止时间初次灌浆压力(Mpa)二次灌浆开始时间二次灌浆终止时间灌浆量(m3)二次灌浆压力(Mpa)日期241800.59:289:310.616:0316:050.350.352012-7-17251800.59: 328:350.616:0616:080.350.352012-7-17261800.59:369:390.616:0916:110.350.352012-7-17271800.59:409
6、:420.616:1216:140.350.352012-7-17281800.59:439:450.616:1516:170.350.352012-7-17291800.59:469:480.616:1816:200.350.352012-7-17301800.59:499:510.616:2116:230.350.352012-7-17311800.59:529:550.616:2416:260.350.352012-7-17321800.59:569:590.616:2716:290.350.352012-7-17331800.510:0010:030.616:3016:320.350.
7、352012-7-17341800.510:0410:060.616:3316:350.350.352012-7-17备注锚杆灌浆材料及水灰比为水:水泥,钢筋型号:328; 61500连接筋 固定件324钢管1500质检人员: 技术负责:施工负责: 监理(建设)单位:编号:锚杆注浆施工记录表工程名称施工单位注浆配合比强度施工部位设计孔径钻孔编号钻孔直径(mm)水灰比初灌开始时间终止时间初次灌浆压力(Mpa)二次灌浆开始时间二次灌浆终止时间灌浆量(m3)二次灌浆压力(Mpa)日期351800.57:407:430.5514:0014:030.40.352012-7-18361800.57:457
8、:480.5514:0514:070.40.352012-7-18371800.57:497:510.5514:1014:140.40.352012-7-18381800.57:527:540.5514:1514:170.40.352012-7-18391800.57:557:570.5514:1914:210.40.352012-7-18401800.57:588:000.5514:2214:240.40.352012-7-18411800.58:018:040.5514:2514:270.40.352012-7-18421800.58:058:070.5514:3014:330.40.35
9、2012-7-18431800.58:088:100.5514:3514:370.40.352012-7-18441800.58:118:130.5514:3814:400.40.352012-7-18451800.58:148:160.5514:4114:430.40.352012-7-18461800.58:188:200.5514:4514:470.40.352012-7-18471800.58:218:230.5514:4814:500.40.352012-7-18481800.58:258:280.5514:5114:530.40.352012-7-18491800.58:308:3
10、30.5514:5514:580.40.352012-7-18501800.58:358:370.5515:0115:040.40.352012-7-18511800.58:388:400.5515:0515:070.40.352012-7-18521800.58:438:450.5515:0815:100.40.352012-7-18531800.58:478:500.5515:1215:140.40.352012-7-18541800.58:538:550.5515:1515:170.40.352012-7-18551800.58:578:590.5515:1815:200.40.3520
11、12-7-18561800.59:219:230.5515:2215:250.40.352012-7-18571800.59:259:270.5515:2615:290.40.352012-7-18备注锚杆灌浆材料及水灰比为水:水泥,钢筋型号:328; 61500连接筋 固定件324钢管1500质检人员: 技术负责:施工负责: 监理(建设)单位:编号:锚杆注浆施工记录表工程名称施工单位注浆配合比强度施工部位设计孔径钻孔编号钻孔直径(mm)水灰比初灌开始时间终止时间初次灌浆压力(Mpa)二次灌浆开始时间二次灌浆终止时间灌浆量(m3)二次灌浆压力(Mpa)日期581800.59:309:330.5
12、515:3015:330.40.352012-7-18591800.59: 358:370.5515:3515:370.40.352012-7-18601800.59:389:400.5515:3815:400.40.352012-7-18611800.59:419:430.5515:4215:440.40.352012-7-18621800.59:459:480.5515:4515:470.40.352012-7-18631800.59:499:510.5515:4815:500.40.352012-7-18641800.59:529:550.5515:5115:530.40.352012-