Hydromechanical analysis ofPlacing and protecting fill(坝体填料的填筑保护及基础流体力学行为分析).doc
《Hydromechanical analysis ofPlacing and protecting fill(坝体填料的填筑保护及基础流体力学行为分析).doc》由会员分享,可在线阅读,更多相关《Hydromechanical analysis ofPlacing and protecting fill(坝体填料的填筑保护及基础流体力学行为分析).doc(14页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、 Hydromechanical analysis of Placing and protecting fillflow behavior in dam Frist Placing and protecting fillFill shall be placed so that mo part of the final foundation surface remains exposed for more than 72 hours.Fill shall be placed in such methods as will prevent segregation of the material.W
2、here the Contract requires the placing of different types of fill in separate zones,the Contractor shall carry out the work so as to prebent mixing of different types of fill.Shoud there be ,in the opinion of the Engineer, any excessive mixing of different types of fill , such mixed materials shall
3、be removed to a spoil tip and replaced with fresh fill.Any undesirable material accumulated on the fill surface shall be removed before placeing the next layer of fill.No fill material shall be placed on a previous layer of that has dried out,become saturated or in any way deteriorated by exposure o
4、r by spilling of other material or disterbance by mechanical transport or by deposition of wind blown particles or by any other means. Before fresh fill material is placed aoo such deteriorated fill or foreign material shall be removed to a depth at which material of an acceptable standard is expose
5、d. The surface of each layer is to be approved by the Engineer before the next layer is placed. Any fill shall be placed in uniform layers not greater than the approved thickness as specified hereafter and in an orderly sequence approximately horizontal along the centreline of the embankments.Except
6、 where specified of directed otherwise, no portion of any embankment shall be stepped more than 3 feet higher than any immediately adjacent portion except where permitted by the Engineer and the slope formed by such steps shall not exceed 1V:3H and not less than 1V:4H from one level to another.Excep
7、t as shown on the Drawings or as otherwise directed, all fill placement surfaces shall be sloped at right angles to the centerline of the embankment in both the upstream and downstream direction from the downstream edge of the core so as to allow run-off and prevent the accumulation of water. The dr
8、ainage slope on the temporary surface of anny zone shall not exceed 1 on 30 and the highest point shall be de downstream edge of the core.Where,due to the specified geometry of the excavation into the top of the existing embankments, the surface slope is towards the downstream edge of the core, the
9、Contractor shall take such measures an necessary to prevent erosion of fine material being washed into the filter zones downstream of the core. Any surface layer of filter material contaminated by such drainage or other cause shall be removed and replaced with fresh filter material before placing th
10、e next layer above. Construction of any one embankment shall be carried out over the maximum possible length,mo less than 1500 feet,of that embankment in such a manner that mo temporary construction slope crosses the axis of the embankment except as approved by the Engineer. Where a temporary constr
11、ction slope crossing the axis of the embankment is permitted by the Engineer it shall be formed at a gradient of 1V:5H. When subsequently placeing material against this slope it shall be cut back in steps equal to the layer thickness to avoid feather edges. The Contractor shall complete each layer o
12、f fill fully up to the abutment contacts and structures and against sloping foundations and ensure that the fill is compacted an specified throughout. The Contractor shall not allow the fill in those areas to lag behind or to get ahead of the normal fill placing operations and form feather edges, ex
13、cept where fill has been placed in advance to cover grouted surface.Where the Contractor is allowed to use either grvel fill and /or sandstone no intermixing of the two materials in a layer shall be allowed. The Constractor may place either of the materials in adjacent layers or sections of the emba
14、nkment.The Constractor shall be responsible for protecting temporary fill surfaces against damage of erosion. At the end of each working day,or if it start to rain ,the surface of the fill shall be made smooth and compacted with a smooth drum roller with a drainage slope to induce runoff from the fi
15、lled areas and leave no areas that can retain water. Where necessary, grips,drainage ditches and the like shall be formed to assist drainage and to prevent runoff from damaging placed material.Runoff from heavy rain shall be controlled to prevent gully erosion of the placed fill. Any gully erosion s
16、hall be repaired with material compacted in accordance with the Specification, and eroded surfaces shall be restored and graded to ensure a proper bond with new fill placed on them.Any eroded material other than gravel and any contaminated material shall be removed from the embankment and placed in
17、designated spoil tips. In particular the Contractor shall ensure that no material is washed into filter or drain material.Where placing of the filter material of drain material is not continuous ,the Constractor shall protect such filter or drain materials by a 2 foot thick layer of course filter ma
18、terial or in such other manner approved by the Engineer,and the Contractor shall maintain the protective layer.The Contractor shall keep the work free from standing water to prevent damage to the fill material. When working below the surrounding level, the Contractor shall ensure that material from
19、adjacent areas does not contaminate the fill material,and that runoff does not flow onto the fill.The Contractor shall arrange the timing and rate of placing fill material in sucn way that no part of the workes is over stressed,weakened or endangered. Any part of the fill that be comes saturated or
20、attains excessive moisture content or that is rendered unsuitable due to poor surface drainage, uncontrolled traffic,or for any other reason, shall be excavated and removed to a spoil tip and replaced by fresh fill .If permitted by the Engineer, such fill may be scarified and re-compacted.Unless oth
21、erwise approved by the Engineer unrestrained edges of fill, whether for temporary or permanent slops, shall be overbuilt as necessary to allow full compaction to be achieved within defined limits of the fill. The excess material shall be trimmed and removed to leave a regular compacted surface.Slope
22、 exposed to view,including riprap and downstream protection slopes, shall be dressed to neatly appearing final surfaces matching the existing slopes.Temporary access ramps shall be removed when work in that area is completed. Any ramps or other areas within the limits of an embankment which, in the
23、opinion of the Engineer have been over-compacted or damaged by the concentrated use by construction equipment,shall be reworked and re-compacted or,if the Engineer requires,shall be excavated, removed to spoil tip and replaced by the fresh fill.When necessary the surface of the layer of fine grained
24、 fill material(rolled clay,rolled silt Type A and B ,Rolled Sandstone Type A and B) shall be sprayed with water to prevent drying out and to maintain the correct uniform moisture content prior to placing the next layer.The Contractor shall ensure that a good bond is achieved between layers of fillan
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Hydromechanical analysis of Placing and protecting fill坝体填料的填筑保护及基础流体力学行为分析 fill 填料 保护 基础 流体力学 行为 分析
链接地址:https://www.taowenge.com/p-56717074.html
限制150内