土的工程绪论土的工程 (135).pdf
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《土的工程绪论土的工程 (135).pdf》由会员分享,可在线阅读,更多相关《土的工程绪论土的工程 (135).pdf(7页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、4.6 The relationship between foundation settlement and timeIn engineering practice,it is often necessary toestimate the settlement of buildings,roads and otherprojects after completion or a period of time,as well asthe time required to achieve a certain settlement,whichrequires to solve the relation
2、ship between settlement andtime.Consolidation of saturated soil土力学土力学Soil MechanicsSoil MechanicsProf.Prof.H.J.LiaoH.J.LiaoUsually during the construction period,differentgrounds lead to different settlements.For example,theground settlement of gravel soil and sand has beenbasically completed during
3、 the construction periodbecause of low compressibility and high permeability.For the thick saturated clay ground,the settlementoften takes several years or even decades to reachstabilitybecauseofthesmallvoidsandhighcompressibility.土力学土力学Soil MechanicsSoil MechanicsProf.Prof.H.J.LiaoH.J.LiaoFor satur
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 土的工程绪论土的工程 135 工程 绪论 135
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内