1、22年项目管理师考试真题及详解5章22年项目管理师考试真题及详解5章 第1章 Clearly defined group goals are important because they _.A motivate team behaviorB cause inner tension within team members until they are metC encourage member interactionD All of the above.E A and C正确答案:D 142 Project managers must know:A. What kind of message
2、to sendB. to whom to send the messageC. how to translate the message into a language that everyone can understandD. All of the aboveE. A and B only正确答案:D 由于以下哪个原因,项目特别容易受到风险的影响 ( )A墨菲定律表明:“如果可能会出问题,问题将会出现”B每个项目在某些方面是独特的C项目管理工具对于项目小组是不可得的D完成工作的资源永远是不足的正确答案:B 190 In which type of organization is team
3、building likely to be most difficult?A. FunctionalB. ProjectizedC. MatrixedD. Project expediterE. Project coordinator正确答案:C 124 Warranty cost is an example of an _ .A. internal failure costB. appraisal costC. external failure costD. customer satisfaction costE. All of the above正确答案:C 你在港口城市美兰柯利亚管理一个
4、国际合资建筑项目。美兰柯利亚的市政委员会通过了一个法律要求派一个代表参加该项目的前沿计划和决策。你很清楚该城市希望你用“非官方”的形式对其工作进行补偿。你以前没有在该国家工作过,因此你不知道与这些政府官员打交道最好的办法。他们的参与是重要的,因为你需要他们为你提供进口设备、补给品和材料的执照和许可证。你最好是( )A直接按照当地的习惯行事,即便这意味着你要付钱给当地的官员B直接按照你自己国家的法律、规定和要求办事C避免故意犯职业错误D认识到政府参与项目的需要,不管做什么都要让项目成功正确答案:C The time necessary to complete a project is calle
5、d the _ of a project.A.Implementation TimeB.Life CycleC.Operation TimeD.Critical PathE.Completion Phase正确答案:B22年项目管理师考试真题及详解5章 第2章 177 The sending or conveying of information from one place to another is the process ofA. NetworkingB. TransmittingC. InteractingD. PromotingE. Interfacing正确答案:B 以下各项除了-
6、均为团队建设技术?A、 工作场地外搞活动改善小组成员间人际关系B、 奖励和认可制度C、 开工准备会议D、 项目经理平息小组冲突正确答案:D 在项目工作网络中有几种类型的浮动期。那些在特定活动中使用并且不影响后来活动的浮动期被称作( )A多余的浮动期B自由的浮动期C总的浮动期D预期的浮动期正确答案:B 通过使用保险可以转移风险。如果估计的伤害发生的可能性是资产的 2%,保费是$5,000,全部资产价值$300,000,此保险是否值得?a. 没有优势因为保险费同可能发生的资产损失的成本一样b. 保费低于期望的损失值,因此最好执行c. 没有意义因为保费比期望的损失值高d. 从提供的数据中无法判断正确
7、答案:Bb Kimmons 和 Loweree, 286 页. 可能的损失= 资产价值 成以 可能性 = 预期价值 $300,0000.02 = $6,000 是潜在损失 同 $5,000 保险比较。 因为保险比可能的损失小,应该买保险。 下列哪一成本估算技术用了统计模式?a. 非参数成本估算b. 参数成本估算c. 生活周期成本估算d. 由下而上的成本估算正确答案:B 编制项目范围说明书时不需要包含以下哪项?( )A成本/利益分析B项目历史C项目可交付成果D可测量的目标正确答案:B 175 Which of the following scheduling methods uses more
8、of the risk management concepts:A. ADMB. PDMC. CPMD. PERTE. Gantt正确答案:D22年项目管理师考试真题及详解5章 第3章 Quality control is normally performed by the _ .A . QA personnelB . project teamC . operating personnelD . project managementE . None of the above.正确答案:C 已批准预算为100000美元,如果估算为90000-125000美元,这是哪一类估算?( )A数量级B预算
9、C近似法D限定法正确答案:B 161 Project alternatives are examined during the _ phase of the projectA. conceptualB. finishC. developmentD. implementationE. A and C正确答案:E 39 Sensitivity analysis can be used in risk analysis to:A. Substitute for uncertainty analysis in risk quantificationB. estimate the level of ri
10、sk aversion adopted by managementC. estimate the effect of change of one project variable on the overall projectD. A and BE. All of the above正确答案:C 25 Obtaining team commitment depends on:A. clear and interesting job assignmentsB. consensus on project goalsC. involvement in developing task objective
11、sD. All of the above.E. B and C正确答案:E The core function of the project manager isA . Systems designB . Client interfacingC . Quality assuranceD . integration正确答案:D 项目经理和项目团队之间极少或没有信息交流的管理方式被称为:A、 自我中心型B、 民主型C、 参与型D、 放任型正确答案:D22年项目管理师考试真题及详解5章 第4章 43 Clearly defined group goals are important because
12、they _.A. motivate team behavior.B. cause inner tension within team members until they are metC. encourage member interactionD. All of the above.E. A and C正确答案:D 167 Scheduling is the process by which decisions are made concerning:A. Tasks to be accomplished.B. Personnel/organization that will be as
13、signed to accomplish the task.C. Time when the tasks are to be completed.D. All of the above.E. A and C only正确答案:E 执行合同能带来债务,它同规定的和隐含的保证和担保相比可能会牵扯到风险,但看不见。两种这样的债务_和_被侵害.a. 商业秘密,技术b. 过程的秘密,先进技术c. 专利权,版权d. 商品名称,商业秘密e. 设计,制作正确答案:Cc Kimmons 和 Loweree, 281页 加上典型的保证和/或担保的考虑, 某些债务通常由于承包商工作质量产生,但不包括诸如专利和版权侵
14、犯之类。 充满竞争的、复杂的项目管理环境加大了对项目工作完成时间的压力。进度的控制是避免时间延期的一个重要方法。时间管理的矫正行为经常是加速某些行为以确保这些行为能够及时完成,或者在尽可能短的延期内完成。为了重新编制和执行进度表,矫正行为通常要求( )A做大家都不喜欢的决策B及时调整基准线C核心原因分析D资源平衡正确答案:C 在行为排序方面有几种工具和技术可以使用,可以通过几个因素来决定选用哪种工具或者技术。如果项目经理决定将子网络作为它的计划进度的技术,运用这个技术在规划项目进度时会有什么样的特点?A、 项目的不同阶段要求有不同的工作网络图B、 可以从现有的电子网络管理资源的软件中获得该技术
15、C、 在整个项目过程中有几个活动的网络图是完全相同的或者几乎完全相同D、 在这个项目中存在多个关键路径正确答案:C 158 Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated): A. should be deflected to the contracting officerB. should be handled via contingency allowancesC. should be ignored, since they cannot be identifi
16、edD. should be ignored, since they are not covered in the Project Risk AssessmentE. C and D正确答案:B 在哪类组织结构中出现项目促进员( )A矩阵型组织B项目型组织C职能型组织D任何组织正确答案:C22年项目管理师考试真题及详解5章 第5章 171 CIP embodies which of the following principals?A. constancy of purposeB. customer focus and involvementC. total involvementD. tea
17、mworkE. All of the above正确答案:E 为实现成功的管理, 项目经理必须充当经理和领导的角色。 在经理的角色中, 项目经理不做以下哪个?A. 制定程序B. 组织人员C. 为股东负责D. 注重组织和结构E. b 和d都对正确答案:Ee 运用对抗以解决问题,然而,为达到里程碑,她最终会凭借强制。 强制即最终凭借权力并可能导致以后感情上的伤害 181 Scope management is:A. a project control function.B. employs change control.C. a work authorization process.D. cons
18、iders Cost, Quality and Schedule.E. All of the above正确答案:E 在风险审核过程中使用工作分解结构(WBS)是因为 ( )A确认必须要完成的所有工作,因此这才有助于确认潜在的风险来源B确认必须要完成的所有工作,因此这包括了全部的项目风险C有助于将所有的一项目相关的饿工作组织起来D确认工作包没,这样才可以将具体的饿责任分配到个人回小组正确答案:A 145 Risks that cannot be identified or evaluated _ .A. should be deflected to the contracting office
19、r.B. should be handled via contingency allowances.C. should be ignored, since they cannot be identified.D. should be ignored, since they are not covered in the Risk Assessment.E. C and D正确答案:B 78 The process of choosing/documenting the best approach to achieve the project objectives is part of: A. The scope baseline.B. Scope authorizationC. Scope definitionD. Scope planning.E. All of the above.正确答案:D 在提供给业主及投资方的报表中有收益率及技术数据等研究以便于被其认可这种常用于融资的报告形式被称之为_( )A项目可行性研究报告B经济评估分析C风险管理手册D说明书正确答案:D