1、22年项目管理师历年真题解析9卷22年项目管理师历年真题解析9卷 第1卷 Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?A . Element PB . Element QC . Element RD . Element SE . None of the above.正确答案:C A budget estimate should give the manager cost data accurate to within:A . -
2、5 to +10 percent of actual costB . -25 to +75 percent of actual costC . -30 to +75 percent of actual costD . -10 to +25 percent of actual costE . None of the above正确答案:D Management reserve is generally intended to be used to:A implement additional unbudgeted scopeB compensate for inaccurate estimate
3、sC cover major unforeseen catastrophesD cover unforeseen problems in the projectE All of the above.正确答案:D 确定项目的技术要求是重要的一个步骤,因为这些要求:( )A用平实的语言说明了可交付成果的特征B帮助项目人员确定工作目标C对项目人员和客户都有用。D可以用来确保客户知道他们可以从项目中得到什么正确答案:B 采用逆推进法的目的在于决定( )A关键路径B最早完成日期C最迟开始日期D赶工日期正确答案:C 你项目的十个干系人员都有项目计划的拷贝。在他们当中许多人出席项目审查会议上, 项目计划被作
4、为绩效衡量基线得到采用。计划描述了项目目标,成果,限制条件,假定有关各方的要求和期望。许多人在会议表达了他们的要求,强调他们的利益。象这样的外部反馈意见是:A、项目团队章程要求的B、团队建设的输入内容之一C、项目干系人管理计划的一项内容D、组织规划流程的产物正确答案:C22年项目管理师历年真题解析9卷 第2卷 为了确保明确了解客户要求并且制定令人满意的项目计划在开始项目执行之前ABC项目经理 ( )A邀请客户会见项目班子审查其专业背景和技术优势B通过由技术组定期审查来确认项目控制计划C将重点放在以获得正式批准文件的方式接受最后成果验收上D通过由客户及其他利害关系者审查项目计划和确认项目基准来获
5、得计划的批准正确答案:D 作为一名项目经理,你意识到团队的发展是项目成功的基本条件。因此,你想了解一下团队动作的技术背景,这个信息能在下面哪一项中找到:( )A团队章程B项目计划C员工管理计划D组织政策和方针正确答案:B 使用进度变更控制系统的好处包括:a对于上呈进度绩效报告有明确的要求B、对于评估进度绩效报告有明确的要求C、明确提出评估进度差异幅度的方法D、明确提出批准进度变更所必须的批准级别正确答案:D In a fishbone diagram, the effect you are concerned about is placed:A . at the right-hand end
6、of the spine.B . at the end of the diagonal line (i.e. fin).C . on a branch of a fin.D . at the left-hand end of the spine.E . None of the above.正确答案:A 189 The most expensive phase of life cycle costing is:A. R D.B. Applied research.C. ProductionD. Operations and support.E. Termination正确答案:D 项目执行期间重
7、新委任了一名项目经理,项目已经按照计划执行,但是项目经理发现客户对报告方法相当不满,项目经理应该首先做什么?( )A检查沟通系统B询问客户的不满和要求,找出解决方案C向客户建议修改报告D让项目团队制定替代方案正确答案:B22年项目管理师历年真题解析9卷 第3卷 192 Which of the following is associated with a buyers request for material to meet a particular need:A. material warrantyB. material guaranteesC. implied warranty of sa
8、labilityD. implied warranty of fitness for a particular purposeE. A and C only正确答案:D 项目协调者类型和项目促进者类型的组织形式之间主要区别在于:( )A在项目促进者类型的组织形式中,员工们通常对项目没有比较稳固的承诺B项目协调者通常不能以个人名义做出或执行项目决策C项目促进者只是作为管理层和项目团队之间的媒介存在D项目协调者负责向组织中更高层的经理人员进行报告正确答案:D 5 Using the problem stated in the Special window, Calculate the deviat
9、ion of duration for the task, using the PERT concept of standard deviation of task duration.A. 0.5B. 1.0C. 1.8D. 2.2E. 2.8正确答案:C 162 Project leadership requires that the project manager pay attention simultaneously to the:A. Tasks to be performed and needs of the teamB. Quantity and quality of the w
10、ork to be performedC. Efficiency and effectiveness of the teamD. Time, cost and performance deliverablesE. All of the above正确答案:E The financial closeout of a project dictates that:A.All project funds have been spent.B.No charge numbers have been overrun.C.No follow-on work from this client is possib
11、le.D.No further charges can be made against the project.E.All of the above.正确答案:DD 在绩效报告的多种技术和工具中,哪一种结合了范围,成本(资源)和进度信息?A 绩效评估B 差异分析C 趋势分析D 挣值分析正确答案:D22年项目管理师历年真题解析9卷 第4卷 在阶段性收尾回顾会议上对于即是投资方又是实施者的项目组来说最难决定的是 ( )A下一阶段的预算分配B批准下一阶段的范围变更C批准下一阶段预算的增加D取消项目正确答案:D Project life cycles provide a better means of
12、 measurement of progress and control. The four phases of a project are conceptual development, _, _, and _.APreliminary planning, detail planning, closeoutBImplementation, reporting, terminationCDevelopment, implementation, terminationDExecution, reporting, finishingEImplementation, termination, pos
13、t-audit review正确答案:CC 你是一个负责你们公司5个项目的项目经理。其中的一个项目正在收尾。很多队员已离开了。今天,该项目的项目经理问你她是否可以在该项目正式结束前离开,因为她要在3天内写一份报告以接受一个新的任务,否则这份工作就会给别人。你知道该项目还有很多细节工作需要完成。你最好的办法是 ( )A指派另一人作为收尾工作的经理,让项目经理去接受她的新工作,问她是否有时间来参加客户会议B不要让项目经理离开,因为由她完成这些收尾工作是最合适的C暂不考虑其他的职责,自己去完成这一项目D让项目经理为新的工作写报告,但是要她在晚上和周末等业余时间进行项目的收尾工作正确答案:A 84 R
14、isk management allows the project manager and the project team to:A. eliminate most risks during the planning phase of the projectB. identify project risksC. identify impacts of various risksD. plan suitable responsesE. B, C and D only正确答案:E 在每个项目的结尾,项目团队应该准备一个教训总结报告,它聚焦于以下各点,除了 ( )A与机构中的其他团队交流最好的经验
15、B向其他人警告潜在的问题C推荐减轻风险的方法以保证成功D只将项目正面的事情与机构中其他人分享正确答案:D 129 The major difference between PERT and CPM networks is:A. PERT requires three time estimates whereas CPM requires one time estimate.B. PERT is used for construction projects whereas CPM is used for R D.C. PERT addresses only time whereas CPM al
16、so includes cost and resource availability.D. PERT requires computer solutions whereas CPM is a manual technique.E. PERT is measured in days whereas CPM uses weeks or months正确答案:A22年项目管理师历年真题解析9卷 第5卷 65 Two sources of variation in the length of hex bolts exist. Production variation and measurement e
17、rror. The QC manager knows that the standard deviation from these sources is 0.24 and 0.43 , respectively. What is the total standard deviation.A. .10 inch.B. .19 inch.C. .34 inch.D. .49 inch.E. .67 inch.正确答案:D 127 A clear definition of the users needs serves as the direct basis for the:A. Work brea