22年项目管理师真题下载8节.docx
《22年项目管理师真题下载8节.docx》由会员分享,可在线阅读,更多相关《22年项目管理师真题下载8节.docx(20页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、22年项目管理师真题下载8节22年项目管理师真题下载8节 第1节 172 Excessive flexibility in specifying requirements will _ the likelihood of time overruns.A. Reduce.B. Eliminate.C. DoubleD. IncreaseE. Not affect正确答案:D 125 In Project Risk Management, Risk Response may include actions to:A. reduce the probability of risk eventsB.
2、change the scope, budget, schedule or quality specifications of the projectC. reduce the consequences or severity of impacts of a potential risk eventD. A and CE. All of the above正确答案:E Statistical cost estimating techniques (based upon history), are called _ estimates and are a _ approach.A . Defin
3、itive, bottom up.B . Analogy, top down.C . Parametric, bottom up.D . Parametric, top down.E . Analogy, bottom up.正确答案:D 85 The purpose of project Risk Management is to:A. Identify those factors that will adversely impact project objectives.B. Assess the impact of adverse project factors.C. Assess th
4、e probability of adverse project factors.D. A and CE. All of the above正确答案:E 经济补偿是下列哪一种管理理论的首要激励工具 ( )A零缺陷理论BX管理理论CY管理理论D质控周期EA及C正确答案:B22年项目管理师真题下载8节 第2节 60 The Utility Theory _ .A. considers risk propensity of the decision maker.B. attempts to formalize managements risk considerations.C. works well
5、 with decision tree analysis.D. is considered highly theoretical.E. All of the above正确答案:B 38 During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:A. Now becomes the new schedule, including the changes, and th
6、e original baseline is disregarded. B. Is still the original baseline but annotated to reflect that a change has taken place.C. Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.D. Is meaningless since every schedule update changes the base
7、line (i.e., a rubber baseline.)E. Is the same since baseline schedules cannot change once the development phase is completed正确答案:C 111 The review for the specification completeness is performed during which of the following cycles. A. Award cyclesB. requirements cycleC. requisition cycleD. solicitat
8、ion cycleE. contractual cycle正确答案:C Which of the following processes allow an unsuccessful bidder to seek remedy for contract award to another bidder.A bid protestB bid reviewC award ProtestD award reviewE any of the above processes can be used正确答案:A 当队员个体既需要对职能经理负责又需要对项目经理负责时,一个项目的团队建设经常是复杂的。这种双重汇报
9、关系的有效管理通常是 的责任?( )A有关的队员B项目经理C项目所有人或发起人D职能经理正确答案:B22年项目管理师真题下载8节 第3节 The most effective team motivator is:A the visibility of the teams contributionB the satisfaction of meeting a challengeC understanding the importance of the projectD the individuals professional challengeE All of the above.正确答案:A
10、最高风险影响通常发生在项目生命周期的哪些阶段? ( )A概念和计划编制B计划编制和执行C执行和收尾D概念和收尾正确答案:C 63 When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at theA. taskB. level of effortC. sub-taskD. projectE. work package正确答案:E 在定义项目范围和活动的过程中要使用到分解技术,但是该技术在定义范围和定义活动过程中起到的是不同的作用。从两者对比的角
11、度来看,下列哪项陈述最好地说明了该技术在定义活动的过程中的作用?A、 用工作分解结构WBS中的工作包来描述最终的产出B、 把最终的产出描述为可交付的或切实的条目C、 把最终的产出描述为行为或行动步骤D、 分解技术在范围定义和行为定义中的作用是一样的正确答案:C 以下哪一项工具或技术用于项目启动?A、 确认替代方案B、 配置管理C、 决策模式D、 分解正确答案:C22年项目管理师真题下载8节 第4节 43 Middle (functional) managers have the greatest influence in the direction of the project in whic
12、h type of organizational structure?A. Project.B. Strong matrix.C. Weak matrix.D. Project coordinator.E. Project expeditor.正确答案:C 质量功能部署过程的作用是:( )A更好地进行产品定义和产品开发B帮助产品在市场上取得成功C帮助确认其他组织正在实施的应该加以效仿的过程D支持生产计划编制和准时制方法正确答案:A 26 Risk mitigation is the process of _ .A. transferring risk to another party.B. r
13、educing uncertainty on the projectC. identifying all possible risk eventsD. monitoring status and making adjustmentsE. All of the above.正确答案:B 163 Cost Plus Percentage of Cost contracts are more desirable for the:A. ownerB. buyerC. sellerD. contractorE. C or D正确答案:E 97 The following reports are norm
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 22 项目 管理 师真题 下载
限制150内