钢结构工程施工技术方案(纯方案8页).docx
《钢结构工程施工技术方案(纯方案8页).docx》由会员分享,可在线阅读,更多相关《钢结构工程施工技术方案(纯方案8页).docx(8页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、G8. STRUCTURAL STEEL WORKSG8.L Reference StandardsParticular standards relevant for this chapter are listed below. If no standards exist, the work shall be performed according to recognized practice approved by the Engineer.American Society for Testing and Materials (ASTM) table8-lItemNameContent1AS
2、TM A 6/A 6MStandard Specification for General Requirements for Rolled Steel Plates, Shapes, Sheet Piling and Bars for Structural Use2ASTM A 36 /A 36 MStandard Specification for Structural Steel3ASTM A 108Standard Specification for Steel Bars, Carbon, Cold Finished, Standard Quality4ASTM A 153Standar
3、d Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware5ASTM A 325 /A325 MStandard Specification for High Strength Bolts for Structural St eel Joints6ASTM A 370Standard Test Methods and Definitions for Mechanical Testing of Steel Pro ducts7ASTM F 436 MSpecification for Hardened Steel W
4、as hers8ASTM A 563MStandard Specification for Carbon and Alloy Steel Nuts9ASTM A 607Standard Specification for Steel, Sheet and Strip, High-Strength, Low-Alloy, Columbium or Vanadium, or Bo th, Hot-Rolled and Cold-RolledDeutsche Norm (DIN)table8-2ItemNameContent1DIN 5 0049Materials Testing Certifica
5、tesAmerican Society of Mechanical Engineers (ASME) table8-3ItemNameContent1ASME Boiler and Pressure Vessel Code, Section IXQualification Standard for Welding and Brazing Procedures, Welders , Brazers and Welding and Brazing OperationsAmerican Institute of Steel Construction (AISC)table8-4ItemContent
6、1Specification for The Design of Cold-Formed Steel Structural MembersItemNameContent1AWS Dl.lStructural Welding Code - Steel2AWS Z49.1Safety in Welding and Cuttingtable8-5American Welding Society (AWS)G8.2. THE DESIGN OF STEELWORKWe shall design the steelwork to comply with the information given on
7、the Drawings. Loading and factors of safety shall comply with relevant codes and regulations. Shop drawings shall be prepared using welding symbols to AWS Dl.l where appropriate. Design calculations and shop drawings shall be submitted to the Engineer for his approval prior to fabrication of any mem
8、ber. We start the steel work after the Engineer approve it.Full information and specifications of all principal weld seams shall be a part of the design drawings. The Drawings shall indicate the type of weld, choice of electrodes, wires and welding powders to be employed. The number of welding passe
9、s shall be made in relation to the thickness of the plate, each pass shall be thoroughly de-scaled before the next pass is applied. For complicated parts, the sequence of welding shall be indicated clearly on the respective drawings.G8.3 MaterialsAll the materials should be qualified. And with the d
10、etail specification and the material characteristics. The materials should not crash severely so as to avoid that the materials are out of shape. After transporting to the site, the materials shall be placed properly to ensure the materials can be used without being damped.G8.4 Machining, Welding, B
11、olted and JointingG8.4.1 MachiningMachining of all parts shall be accurate and to specific dimensions so that replacements made as per design drawings may be readily installed. Like parts and spare parts shall be interchangeable.All machining shall be performed to secure proper matching of adjoining
12、 surfaces. If there are discrepancies between adjoining surfaces, these will be ground smooth, or machined, to proper alignment. Unfinished surfaces shall be true to the lines and dimensions shown on the drawings, and shall be ground to be free from projections and rough spots.The surface finish of
13、all parts and components shall conform with the respective strength and service requirements and as per approved drawings. Surface to be finished by machining shall be indicated on the shop drawings by corresponding standard symbols. G8.4.2 WeldingG8.4.2.1 Preparation for WeldingAll welds shall be p
14、erformed in such a manner that residual stresses will be reduced to a minimum. The weld seams shall, as far as possible, be positioned outside zones of stress concentration.Members and sections to be joined by welding shall be cut accurately to size, with their edges ground or machined to suit the r
15、equired type of welding and to allow full penetration and fusion of the weld with the base material.The surface of members or sections to be welded shall be free from rust, grease, mill scale, and other foreign matter for a distance of at least 30 mm back from the edge of weld. All painting material
16、s shall be removed well back of the heat-affected zones. Welding over zinc primers shall be avoided.G8.4.2.2 Welding ProcedureGeneralThe standard of welding works shall be in accordance with AWSAll welding shall be performed by the electric-arc (SMAW) method, and according to relevant standards unle
17、ss approved otherwise by the Engineer. The welding procedure shall be selected in consistence with the composition and properties of the base material, type of weld and working stresses of the welded joint. Whenever required, pre-heating and heat treatment of the welding seam shall be applied.The me
18、chanical properties of the weld shall conform to the base material as specified in the respective standards.All joining of plates in the principal stress direction shall be carried out using either single-welded or double-welded butt joints. Adjacent plates, carrying high stresses, shall in general
19、not differ more than 3 mm in thickness. If the difference is greater, the thicker plate shall be chamfered maxi mum 1: 4.Principal welds shall be ground as specified in the approved welding procedure. Cracked or defective tacks shall be removed before welding.For double welded butt joints, the root
20、must be completely removed by grinding or back-gauging before proceeding with the welding on the other side in order to prevent the presence of residues.Where auxiliary structural members are welded to components for the purpose of assembly and installation, the connecting welds shall be given parti
21、cular care. Once an installation has been completed, these auxiliary structural members shall be removed by burning them off, followed by grinding the affected areas flush with the plate, without introducing additional local thermal stresses. Knocking off of such members shall not be permitted.The e
22、lectrodes for arc-welding shall be classified on the basis of mechanical properties of the as-welded deposited weld metal, type of covering, hydrogen absorption, welding position of the electrodes and type of current.Electrodes shall be used only in the positions and under the conditions of intended
23、 use in accordance with instructions with each container. Electrodes for manual welding shall be suitable for welding in any position.During the welding operations the electrodes shall be stored and dried in electric heaters prior to welding, according to the instructions fro m the manufacturer.The
24、ignition of welding-electrodes shall not be initiated at the steel surface adjacent to the weld, but at the groove flanks to prevent detrimental increments of local hardness. Where ignition points of electrodes are discovered, they shall be ground appropriately.(1) Welding of Stainless SteelAll weld