1、 作成:Change History 变更记录Revision 版本Effective Date生效日期Originator 编写人Reasons for Change 修改原因2.02012-11-30Tracy Zhou增加对售服件的管理1.0 PURPOSE 目的1.1 For long/mid term : identify needed resource and resource utilization for internal and external 长/中期:识别内外部所需要的资源以及资源的利用率。1.2 For short term: perform committed de
2、livery time to customers while meet inventory control target. 短期:履行承诺给客户的交货时间,同时满足库存控制的目标。2QSCOPE 范围This procedure includes production planning, capacity evaluation, material planning and inventory control.此计划流程包括生产计划,产能评估,物料计划和库存控制。2.1 This procedure includes long/mid-term planning and short term p
3、lanning process.此计划流程包括中长期计划流程和短期计划流程。3.0 DEFINITIONS 定义3.1 Long/mid term planning: planning time fence covers 3 months 6 months中长期计划:计划时间段为3个月到6个月。3.2 Short term planning: planning time fence covers one week one month 短期计划:计划时间段为一周到1个月。4.0 REFERENCE DOCUMENTS 参考文件4.1 PD-C1-01 Contract Review Proced
4、ure 合同评审程序4.2 PD-S2-02 Purchasing management Procedure 采购管理程序4.3 PD-C4-02 Material And Goods Management Procedure 物料管理程序5.0 RECORDS 记录5.1 FN-LG-07 Make Order Form 生产工单5.2 FNLG01 Finished goods Shipment Form,肖货单5.3 FNLG04 Outplant Make Order 委夕卜工单6.0 RESPONSIBILITY 职责6.1 Customer is responsible for p
5、roviding forecast to logistics, logistics transfer customer purchasing order to company sales order, contract review.客户负责提供销售预测给物流,物流转换客户采购订单为公司的销售订单,合同评审。6.2 logistics is responsible for capacity evaluation based on forecast, make production schedule and material requirement planning, make sure sal
6、es order on time delivery.物流部计划负责根据销售预测进行产能评估,根据销售订单结合预测制定生产计划及物料需求计 戈ij,以保障客户订单准时交货。6.3 Purchasing is responsible for capacity evaluation in supplier side, coordinate related functions to solve abnormal issue.采购负责评估供应商产能,协调相关部门解决供应商产能异常Production is responsible for perform production plan on time,
7、complete and close production order in time.生产负责依照计划按时完成生产,及时关闭生产工单。7.0 PROCESS 流程7.1 planning process 计划流程customer provide forecast to logistics ,by every week and with weekly update.客户每周提供销售预测给物流,并且每周更新一次。7.1.1 Logistics check and analyze forecast based on sales history and new project information
8、, communicate and confirm with customers物流跟据实际销售数据和新工程信息检查分析预测,并与客户沟通确认预测信息。7.1.2 Before ERP system go life, logistics manage forecast manually via Excel file, After ERP system go life, planning team load confirmed forecast into ERP system.在ERP系统投入使用之前,物流通过EXCEL表数据库手工处理预测信息;在ERP系统投 入使用之后,物流将确认的预测需录入
9、ERP系统。7.1.3 After EXCEL run, get long /mid term production plan:EXCEL运算后,得到中长期的生产计划:A) Logistics check long/mid term production plan and do capacity evaluation.物流检查中长期的生产计划并做产能评估。B) logistics check whether all resources are enough or not, including machine, labor, mould, fixture, and etc.物流检查是否所有资源满
10、足需求,包括机器设备,人员,模具,工装夹具等。C) If all resources are enough, no action needed; if any resource is not enough, planning team as leader cooperate with related functions to get solution proposal.如果所有资源满足需求,不需要采取任何行动;如有任何资源不能满足需求,计划协调 相关部门制定建议的解决方案。D) Make solution proposal approved by management.管理层批准建议的解决方案
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Planning Management Procedure计划管理程序中英版 Procedure 计划 管理程序 中英版
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内