1、2022项目管理师经典例题7辑2022项目管理师经典例题7辑 第1辑 63 The comprehensive review of a contractors technical performance, cost performance, and delivery schedule, is referred to as:A. post project evaluationB. post contract evaluationC. post mortemD. procurement performance evaluationE. contractors performance evaluat
2、ion正确答案:E 3 Using the WBS in the Special window, an instance of a work package is:A. Build houseB. ExcavateC. Prepare FoundationD. B and CE. None of the above正确答案:E 76 An advertiser who uses a movie or sports star to endorse a product is trying to use power.A. ExpertB. LegitimateC. RewardD. Influent
3、ialE. Referent正确答案:E 88 Management reserves are normally defined as a % of the total budget. As a project progresses, the project manager wants the $ value of management reserve to _, whereas the customer wants the management reserve to _.A. Increase, increase.B. Increase, decrease.C. Decrease, decr
4、ease.D. Decrease, increase.E. Remain the same, return to customer正确答案:E 83 Contingency planning should include all but which of the following?A. The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.B. the developmen
5、t of schedule alternatives and work-aroundC. the management of a contingency budgetD. an assessment of project shut-down liabilities.E. A and C正确答案:A 98 Which of the following tools and techniques can be used to collect information for the project closure reports?A. Customer SurveysB. BrainstormingC
6、. Document and Performance AnalysisD. Lessons LearnedE. All of the above正确答案:E ABC公司通常使用年数和计折旧法计算资产折旧。他们购买了一台价值$15,000 的计算机,在第三年末该机可以$3,000的价格出售,则第三年所提的折旧为:a. $4,000b. $2,000c. $7,500d. $2,500正确答案:B Normal 0 7.8 磅 0 2 false false false EN-US ZH-CN X-NONE/w:LidThemeComplexScript. style. /* Style. Def
7、initions */ table.MsoNormalTablemso-style-name:普通表格;mso-tstyle-rowband-size:0;mso-tstyle-colband-size:0;mso-style-noshow:yes;mso-style-priority:99;mso-style-qformat:yes;mso-style-parent:;mso-padding-alt:0cm 5.4pt 0cm 5.4pt;mso-para-margin:0cm;mso-para-margin-bottom:.0001pt;mso-pagination:widow-orpha
8、n;font-size:10.5pt;mso-bidi-font-size:11.0pt;font-family:Calibri,sans-serif;mso-ascii-font-family:Calibri;mso-ascii-theme-font:minor-latin;mso-fareast-font-family:宋体;mso-fareast-theme-font:minor-fareast;mso-hansi-font-family:Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:Times New Rom
9、an;mso-bidi-theme-font:minor-bidi;mso-font-kerning:1.0pt;/style.年限 成本-残值 折旧率 年折旧 累计折旧 资产 ($15.000)- 折旧 1 $12.000 3/6 or 50% $6,000.00 $6,000.00 $9,000.00 2 $12.000 2/6 or 33.3% $3,999.96 $10,000.00 $5,000.00 3 $12.000 1/6 or 16.66% $2,000.00 $12,000.00 $3,000.00 Using the figure in the Special windo
10、w, The slacktime in Activity G is _ weeks.A . 2B . 3C . 4D . 5E . 7正确答案:C 以下哪个工具被用于范围变更控制?( )A绩效评估B变更请求C纠错行动D范围管理计划正确答案:A2022项目管理师经典例题7辑 第2辑 Which of the following types of cost are relevant to making financial decisions:A . sunk costB . opportunity costC . material costD . A and C onlyE . B and C o
11、nly正确答案:E 101 The lowest dollar amount at stake is associated with the following phase of the project: A. conceptualB. executionC. cut-overD. post project evaluationE. A and D only正确答案:A 41 The project scope/charter baseline includes:A. Summary of background conditions defining the project.B. Organi
12、zation, authority and responsibility relationships.C. Functions to be performed.D. Resource requirement schedule including time estimates.E. All of the above正确答案:E 80 Project leadership requires that the project manager pay attention simultaneously to the:A. Tasks to be performed and needs of the te
13、amB. Quantity and quality of the work to be performedC. Efficiency and effectiveness of the teamD. Time, cost and performance deliverablesE. All of the above正确答案:E Five people are involved on a project that requires significant communication between all project participants. How many lines of commun
14、ication exist on this project?A 5B 6C 8D 10E 9正确答案:D 127 Most project (and non-project) managers prefer _ communications.A. OralB. WrittenC. UpwardD. DownwardE. Lateral正确答案:A 项目沟通系统的关键元素是:( )A进展报告B项目指令C项目经理D客户正确答案:C 在计划编制时你发现完成项目的所需的时间比可以利用的时间长,这时你将如何处理?A、 和客户取得联系,告诉他们项目不能在要求的时间完成。B、 向管理层汇报项目不能在要求的时
15、间完成C、 采赶工或快速跟进法D、 采用赶工或快速跟进法,然后将备选方案汇报管理层。正确答案:D The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are indentified in the _ phase of the project but first documented in the project _.A.Conceptual, charter/baseline
16、.B.Conceptual, master schedule.C.Development, charter/baseline.D.Development, master schedule.E.Development, masterplan.正确答案:AA2022项目管理师经典例题7辑 第3辑 Project trade-offs vary betweenA . risk, cost and schedule.B . direct cost, indirect cost, and resource availabilityC . quality, schedule and timeD . cos
17、t, quality and scheduleE . contract terms, scope and budget正确答案:D 157 Management By Objectives assumes that the team:A. is receptive to an unstructured environment.B. does not require close supervision.C. possesses a self directed philosophyD. identifies with project objectives.E. All of the above正确
18、答案:E 管理收尾包括所有下列事项,除了:a. 项目验收b. 合同清算c. 项目文件档案d. 经验教训学习正确答案:B 项目章程应该由谁发布?A、 项目经理B、 执行组织的领导C、 项目外的一名经理D、 项目发起人正确答案:C 要知道项目真实状态,必须结合考虑下列哪一项:a. 项目进度和成本分析b. 项目进度和员工责任c. 范围基准和管理计划d. 成本分析和工作成果正确答案:A 11 Job continuity would be an example of _ in Maslows hierarchy of needs.A. Self-actualizationB. EsteemC. Phy
19、siologicalD. BelongingE. Safety正确答案:E W.爱德华戴明的14点理论的早期版本鼓励公司应该“在产品生产时就严把质量关,并以此减少大批量产品检验的工作。”戴明说,产品的质量检验一般是在其刚下生产线或生产的主要阶段进行的。有缺陷的产品缺陷要么被扔掉,要么就需要返工。这两种选择的代价都是很昂贵的。这种方法好象是公司雇佣了工人来生产有缺陷的产品,然后再改正这些缺陷。戴明认为人们应该正确的理解检验的目的。他说:“对产品的检验一定要以专业的方式进行,而不能采用以前这种”自食其果“的方法。”这一观点在PMBOK中也有反映,即检验能用来判断结果是否与要求相一致。检验还可以被称
20、作是:A控制测试B项目过程中的即时检验C统计抽样D检核单正确答案:B 27 The primary consideration of product management is to know the _.A. probability of products performance with specified parametersB ability the product has to perform. its intended functionC. ability of a product to be produced within existing parametersD. functi