1、2022项目管理师历年真题解析7卷2022项目管理师历年真题解析7卷 第1卷 Risk exposure refers to _ .A the amount at stake.B what might happen.C the likelihood of somethingD who is going to be held accountableE All of the above.正确答案:A 以下哪一个因素对团队沟通贡献最大?( )A外部反馈B绩效评价C项目经理解决团队的冲突D同地集结正确答案:D 66 A project manager believes that modifying t
2、he scope of the project may provide added value for the customer. The project manager should:A. Change the scope baselineB. Prepare a variance reportC. Call a meeting of the configuration control boardD. Change the projects objectivesE. Postpone the modification until a separate enhancement project
3、is funded after this project is completed according to the original baseline正确答案:E 139 The initial cost of a product and the products operation and maintenance costs _ .A. increases perceived value when balanced.B. are incidental to each other because initial costs are sunkC. decreases design costs
4、as operation periods increaseD. provides perceived function value and product social dysfunctionE. are integrally related with each other because initial costs are sunk正确答案:A 公司有一个生物项目,你是项目经理,现在研究部门已经分离了一种高级微生物。当与海藻结合的时候,这种微生物能够形成一种可生物降解的合成材料。销售部门相信该材料应该利用来制造能够只穿一次就可以抛弃并变成花园肥料的袜子。管理层问你是否应该启动一个项目来制造这
5、种产品。为此,你应准备:A、可行性研究B、投资回报报告C、生产和购买分析D、项目章程正确答案:A2022项目管理师历年真题解析7卷 第2卷 合同的收尾阶段涉及:A、客户满意度分析和最终付款B、管理收尾和档案保存C、向承包商最终付款和整理经验D、产品验收和管理收尾正确答案:D 186 Risk management methodology should be adhered to in:A. construction projectsB. system projectsC. complex projectsD. large projectsE. All of the above正确答案:E 96
6、 The scope management provides:A. A basis for future decisions about the project.B. A baseline to accomplish verification measures.C. A baseline to evaluate potential scope changes.D. All of the above.E. B and C only正确答案:D 169 Which of the following would most likely increase the accuracy of estimat
7、ing the project cost? A. Pricing out the work at lower levels in the work breakdown structure.B. Using historical data.C. Talking to people who have worked on similar projects.D. All of the above.E. A and C only正确答案:D 73 ADM is an activity-on-arrow method. In this method, a dummy activity:A. Denotes
8、 a critical path relationship.B. Denotes any dependency relationship.C. Shows slack.D. Identifies customer deliverables dates.E. Identifies customer team meeting dates正确答案:B2022项目管理师历年真题解析7卷 第3卷 Which of the following impacts the critical path?A.Changing the task duration.B.Reduce the free float of
9、an activity.C.Executing a backward passD.A or BE.None of the above.正确答案:AA 项目团队成员要经常学习新的技能,并在项目实施的过程中不断的提高使用这些技能的熟练程度。对于项目经理而言,一个工作重点是要更新员工资料库中有关雇员技能的信息。这一工作应该在下述哪个管理过程中完成?( )A资源计划编制B沟通计划编制C团队发展D行政收尾正确答案:D 在前瞻性的项目风险管理方法中,应急储备金额应该根据:A、 过去项目中的比例B、 最可能概率和各种风险事件影响的乘积C、 按比例分配到每一项的固定金额D、 项目生命周期每一阶段储备10%的金
10、额正确答案:B 精确而没有偏见的数据对定性风险分析是基本的。你应该使用以下哪一条来确定对项目风险理解的程度?( )A数据精度级别B项目假设的检测C敏感性分析D影响图正确答案:A 一个项目经理在一个队员没有同地集结的项目团队中促成最佳团队绩效的关键方法是( )A建立信任B建立奖励和认同系统C得到其他部门职能经理的支持D运用他或她的权力来控制项目的各个方面正确答案:A2022项目管理师历年真题解析7卷 第4卷 130 Situations calling for a matrix organization include outside pressure for dual focus, _ and
11、 pressure for high information processing capability.A. Pressure for clear accountabilityB. Pressure for reduced duplication of effortC. Pressure for shared resourcesD. Pressure for formalized communication正确答案:C 以下哪3个领域的冲突之和超过了项目总冲突的50%?( )A个性、成本目标和进度B成本目标、行政程序和进度C进度、项目优先权和人力资源D个性、项目优先权和成本目标正确答案:C