1、Planimeter A planimeter is a mechanical device that is used to move a tracing point around the perimeter of the plotted area.It provides a value that is then multiplied by the square scale of the figure to calculate the figures area.A planimeter can be used on any figure no matter how irregular the
2、figures shape might be.测面器,求积仪测面器是一个机械设备,用来移动围绕一个跟踪点绘制周边地区。它提供了一个值,这个值就是由该图的平方乘以比例值来计算出图形的面积。求积仪可以用于计算任何图形的面积,无论这个图形的面积有多么的不规则。 Trapezoidal Computations The mathematics of the area computations is often based on dividing the cross section drawing into parts.The computer can easily subdivide a cross
3、section drawing into a large number of strips,calculate the area of each strip,and then sum the individual area to arrive at the area of a section.If the calculations must be made by hand,the area formula for a triangle and a trapezoid are used to compute the volume.梯形计算 数学上对于一个面积的计算通常是基于把整体分成若干份的剖面
4、,计算机可以很容易地划分成若干条大跨剖面图,计算出每个条带区域,然后总结出每个地区到达的截面面积。如果计算必须由手工进行,那么可以使用三角形和梯形的面积计算公式。 Area of a triangle = 1/2 hw 4.1where h = height of the triangle w = base of the triangle 三角形面积=1/2 h * w h =三角形的高 W=三角形的底长 Area of a trapezoid = ( h1 + h2 )/2 * w 4.2where (see Fig.4.6) w = distance between the two par
5、allel sides h1 and h2 = the lengths of the two parallel sides梯形的面积 = ( h1 + h2 )/2 * w W=两条平行边之间的距离h1和h2=两条平行边的长度The general trapezoidal formula for calculating area is Area = ( h0/2 + h1 + h2 + + h n-1 + h n/2 ) * w 4.3where (see Fig.4.6) w = distance between the two parallel sides h0hn = the lengt
6、hs of the indivedual adjacent parallel sides 梯形面积的一般计算公式是 面积 = ( h0/2 + h1 + h2 + + h n-1 + h n/2 ) * w The precision achieved using this formula depends on the number of subdivisions,but is about 0.5%.In the case of hillside construction,there can be both a cut area and a fill area in the same cros
7、s section (Fig.4.7).When making area computations,it is always necessary to calculate cut and fill areas separately.根据大量的实验证明,该公式的精度的误差大约是0.5%.至于山坡施工,既可以是一个最大面积的梯形也可以是一个横截面积相同的梯形。当进行面积计算时,始终是挖填区分开计算。Average End Area The average-end-area method is most commonly used to determine the volume bounded by
8、 two cross sections or end areas.The principle is that the volume of the solid bounded by two parallel,or nearly parallel,cross sections is equal to the average of the two end areas times the distance between the cross sections along their centerline (see Fig.4.8).平均端面积法平均端面积法是最常用来确定两个截面或截面范围内的地区面积。
9、其原理是固体量由两个平行,或近于平行,截面界等于高端领域的两个时间的平均值之间的横截面沿其中心线的距离来确定的。The average-end-area formula is Volume net cubic yards(cy) = (A1 + A2)/2 * L/27 4.4 where (see Fig.4.8).A1 and A2 = area in square feet(sf) of the respective end areas L = the length in feet between the end areas平均端面积公式 体积网立方码 = (A1 + A2)/2 * L
10、/27 A1和A2 =高端领域的平方英尺的面积L为长度在高端领域之间的脚 The principle is not altogether true because the average of the two end areas is not the arithmetic mean of many intermediate areas.The method gives volumes generally slightly in excess of the actual volumes.The precision is about 1.0%.其原理是不完全正确的,因为这两个高端领域的平均不一定是
11、算术平均数的中间领域。该方法给出了一般略有过剩的实际数量的计算方法,精度为 1.0。 Although cross sections can be taken at any conservative interval along the centerline,judgment should be exercised,depending particularly on the irregularity of the ground and the tighness of curves.In the case of tight curves,a spacing of 25 ft is often a
12、ppropriate.StrippingThe upper layer of material encountered in an excavation is often topsoil(organic material),resulting from decomposition of vegetative matter.Such organic material is commonly referred to as stripping.This material is unsuitable for use in an embankment,and usually it must be han
13、dled in a separate excavation operation.It can be collected and disposed of off the project,or stockpiled for later use on the project to plate slopes.If the embankments are of limited height,the organic material below the footprint of the fill sections must be stripped before embankment placement c
14、an commence(see Fig.4.9).In the case of embankments over 5 ft in height,most specifications allow the organic material to remain if its thickness is only a few inches.When calculating the volume of cut sections,this stripping quantity must be subtracted from the net volume,as it cannot be used for e
15、mbankment construction(Fig.4.10).In the case of fill sections,the quantity must be added to the calculated fill volume(Fig.4.10).剥离上层的材料中往往遇到表层(有机材料)的挖掘,从营养的有机物质分解产生材料.这通常被称为剥离。这种材料是不适用的,而且通常必须在一个单独的挖掘作业中进行处理。它收集和处理过的项目,以后或许可以在项目中使用斜坡板储存。如果堤防高度有限,下面的部分足迹的填充有机材料必须在破除之前开始填筑。在堤防高度超过5英尺的情况下,规范允许的有机物质其厚度
16、必须保证有几英寸。在计算量减少的部分,溶出量必须减去净体积,因为它不能应用于路基施工中。在部分填充的情况下,必须增加填充的体积计算。Net VolumeThe computed volumes from the cross sections represent two different material states.The volumes from the fill cross sections represent compacted volume.If the volume is expressed in cubic yards,the notation is compacted cub