1、安全员 C 证考试试题(Safety officer C test question)Jiangsu construction safety officer C certificate testSingle topic selection:1. If the wetland area is excavated, it can be excavated for artificial precipitation when it is lowered to the bottom of the pit (0. 5 to 1. 0 meters).When digging in the expansiv
2、e soil area, do a good job (drainage) before excavation.3. When the reinforced concrete filling pile is used, the excavation standard is the pile body concrete (after the design strength).4. When the earthwork is excavated manually, the operation spacing of the two should be kept (1 m).5. The shield
3、 structure should test the concentration of combustible gas every day, to predict the prevention and control work, and to do well (to record the account).6. The drainage ditch and the collecting well should be set in (beyond the base range).7. The rectifying jack in the tool tube should be insulated
4、 well, and the operation of electric high pressure oil pump should be (wear insulating gloves).8. The excavated vehicles should be guided, strictlyprohibited.9. The top of the top tube shall exceed (50 m) to prevent hypoxia and suffocation.10. Construction of the top tube. The oxygen and the acetyle
5、ne cylinder (must not enter the pit).11. The 1ighting telecommunication system in the pipeline is generally used (low voltage).The supporting installation must be carried out in the order of the (slotting support).13. The removal of support shall be constructed in the order of (after being replaced)
6、.The base point should not be less than (2).The template and its stents must be set in the installation process (the temporary fixtures that can effectively prevent capsizing).16. The minimum height of the operating platform for the template installation must be (2. 0 m).17. Set horizontal scissor s
7、upport when the bracket is higher than (4. 0 meters).18. During the operation of the suspended part, the operator should (fasten the seat belt).The minimum distance of a template in the foundation pit is outside (2. 0 m).20. The inclined support and side form Angle should not be less than 45 )(21. T
8、he number of rope clamps shall not be less than (3) at the end of the wire rope.22. It is easy to check and prevent accidents before the wire rope has the foreboding, such as broken wire and broken stock, before breaking.23. Bending fatigue is one of the main reasons for the failure of wire rope.24.
9、 The diameter of lifting chain of hand-pulled calabash is more than (10%).The lifting mast is a pillar, and the rope is taut to the ground. Tighten one end to the top of the lifting mast and the other end to the ground anchor. The lasso is generally not less than (4) roots.26. When lifting equipment
10、, the coiled coil should be no less than (3) ring on the winding drum of electric hoist.In the lifting operation, the anchor shall be fixed in addition to the pulley.28. Anchor dragging rope and horizontal Angle is below (3029. The diameter of the pulley is usually not less than the diameter of the
11、wire rope (16).More than 70 percent of car crane accidents are caused by overloading or falling of a leg, so special attention should be given to the use of a crane.31. The legs of the car crane must be solid. Before lifting heavy weights, the legs should be strengthened to see if there is any subsi
12、dence, and sometimes to ensure safe use, the timber will be added.Its purpose (increase the pressure area).In the lifting operation, the incline is buried or set on the ground.33. In signing construction contracts, the construction unit and construction unit of the demolition project shall sign the
13、agreement (safety production management) to define the responsibilities of the two parties.34. The scaffold and safety net for the removal of the construction shall be set up by the (professional) and shall be used only after the acceptance of the relevant personnel.35. Construction is strictly proh
14、ibited in the construction of three-dimensional (cross) operation. When horizontal operation, there is a certain safe distance between each workspecies.36. After the excavator operation is over, it shall be parked in (firm, flat ground).37. The excavator is in a dragline or backhoe operation. The di
15、stance from the working face should be greater than (1 m).38. When two or more excavators work in the same area, the distance should be greater than 8 meters and the left and right distance should be greater than (1. 5 m).39. No bulldozer (lime) is allowed.40. When parallel operation of two shovels,
16、 the spacing shall not be less than (2m).41. The driver of the installation site should smooth and solid, when the compressive stress of foundation bearing capacity can not meet the prescribed, shall be under the track laying foundations box or 30 mm thick steel plate the spacing shall not be greate
17、r than nim (100).42. When the pile driver is working, the non-staff should leave the machine (10 meters) away from the crane.43. During the test of the hammer, the operator must be monitored outside the hammer center (5m).44. The plug-in vibrator should (cut off the power) during handling.45. When m
18、oving the welder, it should be cut off (power supply).The following statement about the main function of the lifting torque limiter is correct, (prevent the tower from being overloaded.)47. The dismantling of the tower crane must be carried out during the day.48. (torque limiter) can prevent the tow
19、er from overloading, avoid the collapse of the tower or the broken arm and other malignant accidents due to severe overload.49. When the tower crane works, the wind speed should be lower than (6).50. Which of the following safety devices is a safety device designed to prevent the operation of a car
20、from exceeding the maximum or minimum range? (amplitude 1imiter)51. The anemometer should be installed at the top of the crane to the hoisting device (the highest position is not in the wind)52. (steel wire rope anti-stripping device) can prevent the wire rope from being removed from the pulley groo
21、ve during the transmission, causing the wire rope card to die or damage.53. (hook insurance) is a safety device to prevent the hoisting of wire rope from lifting wire rope due to excessive Angle or hook.54. When the wind force is above (level 4), it is not allowed to carry out the top lift of the to
22、wer.55. The top lift operation of the tower must be in balance with the balance arm.56. The fixed spacing of the inner climbing tower should not be less than (3) floors.57. The net height of the hoisting cage shall not be less than (2 meters).58. Connection of the construction lift (chassis) with th
23、e foundation.The material lifting machine is attached to the frame and the construction connection.60. The following statement on the use of the material elevator is correct (only for the delivery of materials, not manned).61. The foundation of material lifting machine is concreting c20 concrete.Thi
24、ckness should not be less than (300 mm).62. After the maximum working length of the hoisting rope is released, the wire rope on the drum is retained at least (3 laps).63. During the multi-tower operation, the vertical distance of the high tower (lifting hook to the highest point) and the low tower c
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 安全员 考试 试题 SafetyofficerCtestquestion
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内