电气工程及其自动化专业英语ddkk.docx
《电气工程及其自动化专业英语ddkk.docx》由会员分享,可在线阅读,更多相关《电气工程及其自动化专业英语ddkk.docx(24页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、南京工程学院期末考查报告书成绩电气工程专业外语B 院(系、部、中心) 电力工程学院 专 业 电气工程及其自动化 班 级 电气071 学 生 姓 名 褚楚 学 号 206070819 任 课 教 师 朱建忠 2010年 7月 南 京 考查要求:1、 对已学的课程内容进行总结, 节选4篇课题作为报告的主题。2、 通过文献的搜索(可借鉴Google、Yahoo和电子图书馆的外文期刊),查找数篇与课程相关的资料(一定是经过选择后的文献,要最好的)。3、 通过已经掌握的专业词汇和课题背景对已查找的文献进行精心分析,分析角度可从词汇、语法和课题背景等。4、 对文献进行通篇翻译,翻译最好可直译,遇拗口的语句
2、可选择意译。5、 翻译后从文中选出关键字。6、 总结翻译成果,写下中心思想。7、 考查报告总结(语句需简洁)。Page1. The Production of Electrical Energy(电能生产)1.English testFrom reference 1In large steam power plants, the thermal energy stored in steam is converted into work by means of turbines. A turbine consists essentially of a shaft or rotor fixed i
3、n bearings and enclosed in a cylindrical casing. The rotor is made to turn smoothly by means of jets of steam from nozzles around the periphery of the turbine cylinder. These steam jets strike blades attached to the shaft. Central power stations employ condensing turbines in which the steam passes i
4、nto a condenser after leaving the turbine. Condensation is effected by the circulation of large quantities of cold water through the tubes of the condenser, thus increasing the expansion ratio of the steam and the consequent efficiency and work output of the turbine. the turbines are connected direc
5、tly to large electricity generators.In turbines the action of the steam is kinetic. There is progressive expansion of the steam from the high pressure and relatively small volume at which it enters the turbine to the low pressure and relatively very great volume at which it leaves.Steam is made by h
6、eating water in a boiler. The usual boiler has a furnace in which fuel is burned and the heat given off during combustion is conducted through the metal walls of the boiler to generate steam at a pressure within the boiler vessel .In nuclear plants, steam is generated with the aid of a reator in whi
7、ch the controlled fission of uranium or plutonium supplies the necessary heat for the vaporization of water. Thus the reator replaces the steam generator of conventional plants.Keywords:turbine, steamFrom reference 2Up until now we have been mainly concerned with minimizing the cost of operating a p
8、ower system. An overriding factor in the operation of a power system is the desire to maintain system security. System security involves practices designed to keep the system operating when components fail. For example, a generating until may have to be taken off-line because of auxiliary equipment
9、failure. By maintaining proper amounts of spinning reserve, the remaining units on the system can make up the deficit without too low a frequency drop or need to shed any load. Similarly, a transmission line may be damaged by a storm and taken out by automatic relaying. If in committing and dispatch
10、ing generation proper regard for transmission flows is maintained, the remaining transmission lines can take the increased loading and still remain within limit. Because the specific times at which initiating events that cause components to fail are unpredictable the system must be operated at all t
11、imes in such a way that the system will not be left in dangerous condition should any credible initiating event occur. Since power system equipment is designed to be operated within certain limits, most pieces of equipment are protected by automatic devices that can cause equipment to be switched ou
12、t of the system if these limits are violated. If any event occurs on a system that leaves it operating with limits violated, the event may be followed by a series of further actions that switch other equipment out of service. This is usually referred to as a system blackout.Keywords:power system, se
13、curityFrom reference 3System monitoring provides the operators of the power system with pertinent up-to-date information on the conditions on the power system .Generally speaking it is the most important function of the three. From the time that utilities went beyond systems of one unit supplying a
14、group of loads, effective operation of the system required that critical quantities be measured and the values of the measurements be transmitted to a central location. Such systems of measurement and data transmission, called telemetry systems, have evolved to schemes that can monitor voltages, cur
15、rents, power flows, and the status of circuit breakers switches in every substation in a power system transmission network. In addition, other critical information such as frequency, generator unit outputs and transformer tap positions can also be telemetered. With so much information telemetered si
16、multaneously, no human operator could hope to check all of it in a reasonable time frame. For this reason, digital computers are usually installed in operations control centers to gather the telemetered data, process them, and place them in a data base from which operators can display information on
17、 large display monitors. More importantly, the computer can check incoming information against prestored limits and alarm the operators in the event of an overload or out-of-limit voltage. State estimation is often used in such systems to combine telemetered system data with system models to produce
18、 the best estimate (in a statistical)of the current power system conditions or “state”.Keywords:telemeter, estimateFrom reference 4The main objective of production control in power system is to minimize the cost of generated power while maintaining its quality and satisfying the system security cons
19、traints. This implies directly that losses in both the generation and the transmission of electrical energy must be as small as possible. All participating generators are run at high efficiencies, the mix of production resources is exploited economically and the energy is transmitted optimally. Prod
20、uction control includes general both active and reactive power. However, the main interest in this type of application has so far been focused mainly on the active part. This is the case in this section also. However, interest for the reactive part is rapidly growing and will soon get a great deal o
21、f action. The activities in the production control field have traditionally been based on planning. This is still the case. The aim is then to break down the overall objective into detailed plans, normally on an hourly basis, that can be carried out by the operator in the control center. Thus, sever
22、al steps are taken in a hierarchical scheme to support the operators ambition always to have production resources available to meet the load demand and guide him to operate the generating units so that the most economic alternatives are chosen. The security aspects must also be consisted ,e.g. the s
23、election of production units must not result in line overloads, too high bus voltage etc. If the system suffers the sudden loss of generation, it must be prevented from getting into the alert state for example by activating production reserves. Keywords:production control, security2中文翻译及分析出自文献1: 在大型
24、火电厂中,蒸汽中储存的热能通过汽轮机做功。汽轮机基本上是由轴或者固定在轴承之间封闭在圆柱形汽缸内的转自组成。转子由汽轮机汽缸周围的喷嘴喷出的气流推动而平稳转动。这些喷射蒸汽流冲击安装在轴上的叶轮。中心发电厂应用凝汽式汽轮机,使蒸汽离开汽轮机进入凝汽器,由凝汽器管束内的大量循环冷却水进行凝汽,这样就增加了蒸汽的膨胀率和效益,也增加了汽轮机的输出。汽轮机直接连接大型的发电机组。 在汽轮机内,蒸汽是运动的,它有一个逐渐膨胀的过程:进入汽轮机时,蒸汽在高压下有相对较小的体积,而离开汽轮机时,在低压下有相对较大的体积。 蒸汽由锅炉内的热水生成。一般锅炉有燃烧室,燃料在燃烧室燃烧,燃烧过程中散发的热通过锅
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电气工程 及其 自动化 专业 英语 ddkk
限制150内