关于土工合成材料在水利工程中的应用及其施工方法研究中英文对照.doc
《关于土工合成材料在水利工程中的应用及其施工方法研究中英文对照.doc》由会员分享,可在线阅读,更多相关《关于土工合成材料在水利工程中的应用及其施工方法研究中英文对照.doc(5页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、 关于土工合成材料在水利工程中的应用及其施工方法研究中英文对照About geosynthetic materials application in water conservancy project and its construction method to study Chinese and English language compared 工程中为了起到保护或加强土体的作用一般将土工合成材料置于土体表层或各层土体之间。土工合成材料具有防渗、排水、反滤、防护、加筋和隔离等功能,如今在水利工程中,其规模与作用是其他工程领域无法比较的。就目前来说,土工合成材料是继木材、钢材与水泥之后的第四
2、种建筑材料。本文主要分析了土工合成材料的施工技术和土工合成材料在工程施工中的应用。Projects in order to protect or enhance the role of the geosynthetic materials are placed in the soil of soil surface layer or between the layers of soil. Geosynthetic materials has the seepage control and drainage, filter, the function such as protection, re
3、inforcement and isolation, now in water conservancy project, its size and function is unmatched by other engineering field. For now, geosynthetic materials is the fourth after wood, steel and cement building materials. This article mainly analyzes the construction technology of geosynthetic material
4、s and geosynthetic materials in the application of the engineering construction. 1 土工合成材料的分类1 the classification of the geosynthetic materials 土工合成材料的主要原料有聚乙烯、聚丙烯以及聚氯乙烯等高分子聚合物,主要分为土工织物、土工膜、土工符合材料以及土工特种材料。在近几年的水利工程中土工织物、土工膜以及土工复合材料的使用相对较多。土工织物分为有纺土工织物和无纺土工织物两种类型,在大坝工程中通常使用针刺无纺土工织物作为配水反滤设施,主要是它具有空隙率高、
5、渗透性大以及排水性好的优点。土工膜具有很好的防渗性能,并且价格廉价。但是由于其CBR的顶破强度较弱,因此不适用于防渗要求较高的工程部位。由于土工复合材料将两种或两种以上的土工合成材料组合成了一种产品,不但品种繁多、功能各异,并且还具有防渗和排水两个作用,因此,在大坝工程中土工复合材料应用相对较多。The main raw material of geosynthetic materials has the polymers such as polyethylene, polypropylene and PVC, mainly divided into geotextiles, geomembr
6、ane, geotextile composite material and geotechnical specialty materials. In water conservancy engineering in recent years to geotextiles, use of geomembrane and geotechnical composite material is relatively more. Geotextiles, divided into two types of woven geotextiles and non-woven geotextiles, usu
7、ally used in dam acupuncture non-woven geotextiles, used as water filter facilities, major is that it has high porosity, permeability and the advantages of good drainage. Geomembrane has the very good anti-seepage performance, and cheaper prices. But because of the CBR bursting strength is weak, so
8、not meeting the requirements of anti-seepage engineering parts. Due to geotechnical composite material will two or more than two kinds of combination of geosynthetic materials has become a kind of product, not only many varieties, different function, and also have anti-seepage and drainage two effec
9、t, therefore, geotechnical composite material application in dam project more. 2 土工合成材科在水利工程方面的具体应用及其施工2 geotechnical or timber section in water conservancy engineering aspects of the specific application and construction 2.1 混凝土坝防渗方面的应用 垂直铺膜防渗和坡面铺膜防渗是防渗土工合成材料应用的两大方面,其施工工艺和铺设工艺由于其铺设结构形式的不同也不一样。土工材料经
10、常受到尖棱物的穿刺而被破坏;土工薄膜在承受水压力和土压力的情况下由于没有约束支持而被鼓破;薄膜在下层气体或液体的顶托作用下产生应力集中而被破坏;铺设在支撑土与混凝土面板之间的土工薄膜由于受到温度、重力、土体位移、浪击和水位变化等因素的影响而导致土工薄膜产生过度拉伸,撕裂或擦伤;在斜面上用土或混凝土面板保护土工薄膜,当水位骤降时,土体中的孔隙水压力和库水位失去平衡而造成失稳滑动。在施工过程中为了有效的防止或减少类似问题的发生一定要按照施工标准和施工组织设计进行施工以保证施工质量。2.1 concrete dam seepage control applications of vertically
11、 laying out leakage-proof slope seepage control and spread of membrane is impervious, the two aspects of the application of geosynthetic materials its construction process and the laying process because of its different laying structure is different also. Geotechnical material is often sharp objects
12、 have been destroyed by the piercing; Earthwork film in the case of under water pressure and earth pressure due to no constraint support be broken drum; Thin film in the lower gas or liquid under the action of jacking have been destroyed by the stress concentration; Laid between the supporting soil
13、and concrete face of earthwork film due to temperature, gravity wave, displacement of soil, and water level change caused by the influence of such factors as earthwork film have excessive tensile, tear or scratch; Earth or concrete on the slope geotechnical membrane panel protection, when water leve
14、ls drop, the pore water pressure in soil and water losing balance and cause instability sliding. In construction process in order to effectively avoid or reduce the occurrence of similar problems must be carried out in accordance with the construction standard and construction organization design co
15、nstruction to ensure construction quality. 在防渗结构中设置上下垫层以保护土工膜不受破坏,并且下垫层还具有排水和排气的作用。铺设土工膜以后,由于土中排出的气体或产生的沼气过多就会顶托土工膜而造成土工膜的破坏,而膜下也会因为缺陷引发渗漏而产生积水,因此,为了有效的减少土工膜的破坏程度,尤其铺筑膜的面积加大时一定要考虑排水以及排气等措施。Set up and down in the anti-seepage structure cushion to protect the geomembrane are not destroyed, and the cus
16、hion layer has drainage and exhaust. After laying geomembrane, biogas generated from the vent gas due to soil or too much will jacking geomembrane and cause the destruction of the geomembrane, the film will be produced because of the defects caused by leakage under water, therefore, in order to effe
17、ctively reduce the damage degree of geomembrane, especially the area of the paving membrane increase must be considered when drainage and exhaust and other measures. 防渗设计与施工(design and construction of seepage control) 有毒物质进入水体不但会污染环境,更会危机人畜的生命,根据多年的经验,渠道的防渗土工膜厚度不应小于0.25mm。如果土工膜太薄不仅容易发生气孔,在施工中也容易受到损害
18、,从而降低防渗效果。由于隧道、洞室的围岩土都有渗水,因此为了确保防渗衬砌工作平安进行,必须将渗水通过排水沟排走,这时主要使用复合土工膜或适宜的防排水材料。Toxic substances into the water will not only pollute the environment, will the crisis of human and animal life, according to many years of experience, channel anti-seepage geomembrane thickness should not less than 0.25 mm
19、. If the geomembrane is too thin is not only easy to porosity, are also susceptible to damage in the construction, thus reducing seepage control effect. Due to the tunnel, the cavern surrounding rock (soil) has ooze water, thus to ensure the safety of the anti-seepage lining work, must be discharged
20、 water penetration through drainage and then mainly use the waterproof and drainage of compound geomembrane or suitable materials. 2.2 堆石坝防渗中的应用 白云水库大坝为粉土斜墙堆石坝,而坝体是经过两次填筑而成的。由于当时筑坝技术较低并且碾压质量差,因此,斜墙的密实度较差,局部地段出现了较大程度的透水。在内坝坡右侧距坝轴约512m间段中产生了渗透破坏变形,坝体出现了塌陷长10m,宽8m,虽然后来对此段进行了相应的处理,但是斜墙部位和反滤料质量较差的局部由于没有处