1、Industrial Standard of Peoples Republic of China建筑施工门式钢管脚手架平安技术标准Safety and Technical Code for Frame-Type Steel-Tube Scaffolds in ConstructionJGJ 1282000J432000Beijing 2000Industrial Standard of the Peoples Republic of China建筑施工门式钢管脚手架平安技术标准Safety and Technical Code for Frame-Type Steel-Tube Scaffol
2、ds in ConstructionJGJ 1282000Mainly prepared by: Harbin Industrial UniversityApproved by: The Ministry of Construction of the Peoples Republic of ChinaImplemented from: Dec. 1, 2000China Building Industry Publishing HouseBeijing 2000Notice for issuance of industrial standard “Safety and Technical Co
3、de for Frame-Type Steel-Tube Scaffolds in Construction”Jian Biao 2000 No. 223As required by “Notice for issuance of the plans for formulation and revision of standards and codes of project construction in 1989” released by the Ministry of Construction (89 Jian Biao Ji Zi No.8), “Safety and Technical
4、 Code for Frame-Type Steel-Tube Scaffolds in Construction” prepared by the former Harbin Architectural University has been reviewed and approved to be industrial standard, in which articles 3.0.4, 6.2.2, 6.2.4.1, 6.5.4, 6.8.1, 7.3.1.4, 7.3.1.5, 7.3.2.1, 7.3.3.1, 7.5.4.4, 7.5.4.5, 7.5.4.6, 8.0.1, 8.0
5、.2, 8.0.3, 8.0.5, 8.0.7, 8.0.10 and 9.4.3.6 are compulsory. This standard is numbered as JGJ 1282000, and will be put into practice from Dec.1, 2000.This standard will be under management of Beijing Zhong Jian Architecture Scientific Technology Research Institute (subsidiary to the Ministry of Build
6、ing and responsible for management of safety standard and technology in architecture engineering), and will be explained in detail by the current Harbin Industrial University. It is published by China Architectural Industry Publishing House under the organization of Standard Rating Research Institut
7、e, subsidiary to the Ministry of Building.The Ministry of Construction of the Peoples Republic of ChinaOct. 11, 2000PrefaceUpon requirement by 89 Jian Biao Ji Zi No. 8 document issued by the Ministry of Building, the group in charge of compilation of standards has formulated this code after an exten
8、sive investigation, serious summary of practical experiences, consultation of the relevant international standards and advanced foreign standards, and extensive collection of comments and proposals.This code is mainly consisted of: 1 General Rules; 2 Terminologies and Symbols; 3 Material Property of
9、 Elements and Fittings; 4 Load; 5 Design Calculations; 6 Configuration Requirements; 7 Erection and Removal; 8 Safety Management and Maintenance; 9 Template Support and Full Scaffold.This standard will be under management of Beijing Zhong Jian Architecture Scientific Technology Research Institute (s
10、ubsidiary to the Ministry of Building and responsible for management of safety standard and technology in architecture engineering). The unit mainly in charge of compilation is authorized for explanation in detail.Mainly prepared by: Harbin Industrial UniversityParticipants: Shanghai Architecture Co
11、nstruction Technology Research Institute Shan Tou International Scaffold Company Beijing Li Jian Template CompanyWuxi Fareast Architectural Equipment CompanyMainly drafted by: Xu Chongbao Pan Ding La Lu Zhang Tiezheng Zhang Liangji Gu Hongjong Zheng Qiuping Zhang AiruGao Weicheng Jin Yi Ning Renzhi
12、Yang WeidongTable of Contents1 General Rules62 Terminologies and Symbols62.1 Terminologies62.2 Symbols103Material Properties of Elements and Fittings124Load135Design Calculations155.1 Construction Design155.2 Stability and Erection Height of Scaffold155.3 Wall Connector176Configuration Requirements1
13、96.1 Porte Cochere196.2 Fittings196.3 Fasteners206.4 Connection of Porte Cochere at Corners206.5 Wall Connector216.6 Pathway Mouth226.7 Inclined Ladder236.8 Groundsill and Foundation237Erection and Removal247.1 Construction Preparations247.2 Foundation247.3 Erection257.4 Acceptance267.5 Removal278 S
14、afety Management and Maintenance289 Template Support and Full Scaffold299.1 General Rules299.2 Template Support309.3 Full Scaffold339.4 Erection and Removal34Appendix A Quality Classification of Porte Cochere and Fittings35A.1 Quality Classification and Treatment Regulations of Porte Cochere and Fit
15、tings35A.2 Judgment of Quality Grade35A.3 Marks39A.4 Spot Check39Appendix B Sheets Used for Calculations39Explanation of Wording in This code431 General Rules1.0.1 This code is prepared for implementation of national laws and regulations related to safe production during design and construction of f
16、rame-type steel-tube scaffolds so as to ensure them to be technologically advanced, economically reasonable, and safe in use.1.0.2 This code is applicable for design, construction and use of floor (bottom bracing) frame-type steel-tube scaffolds used in construction of industrial and civil architect
17、ures. Design, construction and use of frame-type steel-tube scaffolds for other purposes (normal building such as chimney and water tower etc.) may follow the principles in this code.1.0.3 Erection height of floor frame-type steel-tube scaffolds should not exceed the specified height in Table 1.0.3
18、of this code.Table 1.0.3 Erection Height of Floor Frame-Type Steel-Tube ScaffoldsStandard value of constructional load SQk (kN/m2)Erection height (m)3.05.0 45 3.0 60Note: Constructional load refers to the sum of constructional load distributed evenly on each operation layer within one span.1.0.4 In
19、addition to this code, design and construction of frame-type steel-tube scaffolds shall also be in compliance with the relevant current national compulsory standards.2 Terminologies and Symbols2.1 Terminologies2.1.1 Frame-type steel-tube scaffoldA kind of standard steel-tube scaffold. With basic str
20、ucture consisted of porte cochere, x brace, pitman, hanging buckled scaffold board or horizontal bracket and locking arm etc., it is provided also with horizontal reinforcing rod, bridging, ground pole, seal bar, bracket and base, and is connected to the buildings main structures by wall connector.2
21、.1.2 Porte cochereMain elements of frame steel-tube scaffold consist of standing pole, lateral pole and stiffener, which are welded reliably (figure 2.1.2)Figure 2.1.2 Porte Cochere1 standing pole; 2stiffener of standing pole; 3lateral pole;4stiffener of lateral pole; 5locking pin2.1.3 FittingsFrame
22、 steel-tube scaffold also contains other elements (figure 2.1.3), such as pitman, locking arm, x brace, horizontal bracket, hanging buckled scaffold board, pedestal and bracket. 2.1.4 PitmanAdapting piece used for vertical assembling of standing pole of porte cochere.2.1.5 Locking armAdapter at asse
23、mbled joint of standing pole of porte cochere.2.1.6 X braceCrossover tie bar for connection of each two porte cochere.2.1.7 Horizontal bracketHorizontal element hanging buckled on lateral pole of porte cochere.2.1.8 Hanging buckled scaffold boardScaffold board hanging buckled on lateral pole of port
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2022年JGJ 128-2000 建筑施工门式钢管脚手架安全技术规范 英文版 2022 JGJ 128 2000 建筑 施工 钢管 脚手架 安全技术 规范 英文
限制150内