1、Work Instructions for Cement Machinery andEquipment InstallationWork Instructions for Rotary Kiln InstallationCBMLQEMS.03.465. Supporting roller installationNo.ContentInspection itemTechnical requirementsMain points in operationTest device5.1Positioning of supporting rollersTransversal central devia
2、tion0.1min/mThe supporting rollers on the driving side will be positioned first, then other supporting rollers can be aligned with this as reference. The transversal positioning of supporting rollers on the driving side can be performed with reference to 2.2 and 4.6, and for longitudinal positioning
3、, see 5.2.Max. transversal central deviation0.5mm5.2Supporting roller installation and alignmentIA1-A3IIA2-A4I0.5mm1- Transversal CL Base / Base centerlineDial gauge caliperJ 1 1 J J _l1/rJ.人3-A2=?一 A4 一1A1 - Atheorl |A2-A(heorl0.5mmm. lIA1-A2IIB1-B2I 1.0mmr*11111, B1 -11 A- 1- 本Ai*1 aGrade I steel
4、tape, and 200N spring scale1A1 - Atheorl |B1-B(heorl1.0mmIC1-C2IID1-D2I 1.5mm十 11-No.J B2 11NO.2N0.3|H-Htheorl0.5mmH3 _ uPrecision levelj -H21 :-IlNo.ContentInspection itemTechnical requirementsMain points in operationTest device0.05mm/mMeasuring position:center of main line1 - square leveon upper e
5、dge of roller2 - slope gaug3 - rollerr 1IJ-4? 口| / 2Slope gauge and square levelij1A0.1 mmRoller6. Shell installationNo.ContentInspection itemTechnical requirementsMain points in operationTest device6.1Check shell length and circumferential lengthCircumferential length deviation of adjacent joints3
6、mmLJ-nent in tu ion, more s7y perpend all be measC0tdr plate 年-k ShellSteel tapeLi-L2lmmLaLa-Lb 1.5mm,o mutual 1.ections shicular sections. In case of ured.6.2Determine shell axial centerDiameter of center hole2mmMake measurei excessive devialMarking gauge6.3Fitting the live ringDetermine the fittin
7、g sequence for shell according to the lifting equipment capacity.6.4Prepare shell alignment tools-15()0152,1 J20Fixing support95J 15():WedgeJ25Shell6.5Shell assembling and installationXlmm,/sSteel rulert2mmt6.6Arrangement of connecting platesSpacing in circumferential length direction500mm at least
8、16 at equal spacing1.5001rmR8ILNo.ContentInspection itemTechnical requirementsMain points in operationTest device6.7Align the shell coaxialityLive ring and ring gear(p2mmLaser transitLaser transit/ r1 / 1 只E Head and tail(p3mmOther locations(p4mm,No. 3 gear rimNo. 2No. 16.8Shell weldingAfter qualifi
9、cation of the above items, the Owner and Supervisor will make a joint inspection, and shell welding will be performed when no defect is found. A joint inspection will be performed again after welding of outer joints. Signature and record must be made for each joint inspection. During welding, the sh
10、ell shall be rotated by means of the auxiliary driving system. “Welding of rotary kiln shelT, shall be implemented.Welding test and weld seam check7. Installation of gear rim and pinionsNo.ContentInspection itemTechnical requirementsMain points in operationTest device7.1Ring gear pre-assembling and
11、fittingClearance 80.04mm/ /1/1Feeler gaugeClearance depth 150mmry/ /-11Clearance rangecircumferential二一 !length/5Hi.37.2Gear rim alignmentRadial playAxial play1 mmGear rimDial gaugeDial gaugeDini QaiiQe 1llllllllllll*gauge 1No.ContentInspection itemTechnical requirementsMain points in operationTest
12、device7.3Ring gear welding or rivetingWhen connection is made by welding, 1/3 of the total work quantity can be done before completion of shell welding, and the remaining 2/3 can be done after shell welding.Pinion installationLateral gapTop clearance deviation on both sidesAs per design requirement0
13、.1 mmDischa飞施Gearrim CL+ ( - Gear rim7.4Side clearance deviation on both sides70%i i Pinion CLaThe centerline distance of sear rim and ninions can be determined withIn tooth height direction50%reference to the diagram in 8.1.7.5Installation ofRadial play deviation0.1 mmAs perInstallation and alignme
14、nt for couplings”Dial gaugemotor reducerEnd play deviation0.1 mm7.6Grouting anchoring holesAs per “Grouting anchoring holes”7.7Precision alignment forRadial play deviation0.1 mmAs perDial gaugemotor reducer installationEnd play deviation0.1 mm8. Installation of other parts of equipmentNo.ContentInsp
15、ection itemTechnical requirementsIllustration or descriptionTest device8.1Installation of kiln tail sealsTo be installed as per drawings8.2Installation of kiln head hoodTo be installed as per drawings8.3Installation of kiln head sealsTo be installed as per drawings9. Trial runNo.ContentInspection it
16、emTechnical requirementsMain points in operationTest device9.1Inspection and lubricationCheck the seals at the kiln head and tail, live ring and supporting rollers, driving devices and other rotating and moving parts for free of foreign matter or interference, and tight connection of bolts. Fill in
17、specified amount of lubricant and hydraulic oil according to lubrication sheet.9.2Trial runBearing temperature riseOil and water supplyTrial run:1. Confirm that the motor is rotating in correct direction and then drive the rotary kiln to run for 2h.2. The main motor will run under no load for 8h for
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 唐山安装工程公司46 回转窑安装作业指导书-en 唐山 安装 工程公司 46 回转 作业 指导书 en
限制150内