1、Safety management in tunnel construction:Case study of Wuhan metro construction in ChinaAuthor:MiroslawJ.Skibniewski Lieyun Ding,et alReporter:Wu Tong-gangCentral South UniversityNew wordsShaft:通风井Grouting:灌浆,给灌浆High-pressure jet grouting piles(HJGP):高压喷射灌浆柱Silty clay:粉质黏土Tunnel boring machine(TBM):
2、隧道掘进机Gush:涌出Double-spool:双轴OutlinePART 1 Introduction PART 2 MethodPART 3 ResultsPART 4 ConclusionIntroduction 11.1 Background Shield tunneling technologyAdvantages Disadvantages 1.High level of mechanization1.Large scale 2.Fast progression of tunneling works2.Long duration3.Lesser environmental imp
3、act3.Complex technical issues1.2 Objective The primary aims of this study were to investigate:Overall Process Safety Management(OPSM)in tunnel construction.iiiiA real-time update of both environmental parameters and control measures.iiA more reasonable solution for the waterproofing and reinforcing
4、works.1.3 Project profileWuhan Yangtze Metro Tunnel(WYMT)Characteristics:1.Double-spool tunnel connecting two large cities2.Two sets of ventilation shafts3.A curve radius of 350m and an extremely close distance away from Yangtze River4.Fine sandstone and silty clayMethod 2Waterproofing Ground freezi
5、ngLowering of water level methodReinforcing 1.The cement paste tends to be washed away by the flowing water,resulting in poor reinforcement.A high-pressure jet grouting2.1 Safety system design2.No significant waterproofing results would be achieved due to the close proximity to the Yangtze River.2.1
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国际会议 汇报 ppt 英文 课件
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内