《汽轮机安装计划.pdf》由会员分享,可在线阅读,更多相关《汽轮机安装计划.pdf(2页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、时间时间汽轮机安装进度计划汽轮机安装进度计划低压缸安装进度计划低压缸安装进度计划低压#1缸安装低压#1缸安装低压#1轴承座台板安装低压#1轴承座安装低压外缸装配1低压外缸接配2低压外缸就位找正轴承安装(#3、#4轴承)低压内缸下半及内部套下半组装低内缸半就位2013-8-12013-9-12013-10-12013-11-12013-4-12013-5-12013-6-12013-7-1汽轮发电机本体安装进度计划2012-10-12012-11-12012-12-12013-3-12012-7-12012-8-12013-1-12012-9-12013-2-12013-8-12013-9-12
2、013-10-12013-11-12013-4-12013-5-12013-6-12013-7-1汽轮发电机本体安装进度计划2012-10-12012-11-12012-12-12013-3-12012-7-12012-8-12013-1-12012-9-12013-2-18.28.77.158.107.278.28.108.158.158.219.69.14等待高压转子与低压#1转子找中心1低压内缸下半就位2落转子(含转子找中心)3内部套下半就位4径向通流间隙测量(下半)5轴向通流间隙测量低压内缸上半及内部套上半组装1径向通流间隙测量(上半)2内部套上半就位3内缸上半试扣扣缸前所有部件清理检
3、查低压#1缸扣缸低压#3缸安装低压#3缸安装低压#4轴承座台板安装低压#4轴承座安装低压外缸装配1低压外缸接配2低压外缸就位找正轴承安装(#7、#8轴承)低压内缸下半及内部套下半组装7.288.37.237.288.28.77.158.107.158.107.278.28.108.158.108.158.158.218 158 218.309.69.149.2610.410.2411.611.269.69.149.3010.61.131.2310.2411.611.2612.312.31.13等待低压#1内缸及内部套到等待高压转子与低压#1转子找中心1.231.30低压内缸下半及内部套下半组装
4、1低压内缸下半就位2落转子(包含短轴连接、转子找中心)3内部套下半就位4径向通流间隙测量(下半)5轴向通流间隙测量低压内缸上半及内部套上半组装1径向通流间隙测量(上半)2内部套上半就位3内缸上半试扣扣缸前所有部件清理检查低压#3缸扣缸低压#2缸安装低压#2缸安装低压#2、#3轴承座台板安装低压#2、#3轴承座安装低压外缸装配1低压外缸接配2低压外缸就位找正轴承安装(#5、#6轴承)7.87.187.288.37.237.288.28.77.158.107.158.107.218.167.187.287.278.28.108.158.108.158.158.218.158.218.218.278
5、.309.69.149.2610.410.2411.611.269.69.149.3010.610.610.2010.2011.211.211.2211.2212.41.131.2310.2411.611.2612.312.31.131.171.2712.412.2412.241.11.71.178.168.218.279.1等待低压#1内缸及内部套到等待高压转子与低压#1转子找中心等待低压#3内缸及内部套到货等待发电机转子与低压#3转子找中心1.231.301.302.7等待低压#1缸轴承安装轴承推力轴承安装低压内缸下半及内部套下半组装1低压内缸下半就位2落转子(包含短轴连接)3内部套下半就
6、位4径向通流间隙测量(下半)5轴向通流间隙测量低压内缸上半及内部套上半组装1径向通流间隙测量(上半)2内部套上半就位3内缸上半试扣扣缸前所有部件清理检查低压#2缸扣缸高压缸安装进度计划高压缸安装进度计划前轴承箱台板安装前轴承箱安装高压缸下半安装轴承安装(#1#2轴承)7.87.187.288.37.237.288.28.77.158.107.158.107.218.167.187.288.309.208.208.257.278.28.258.3012.291.910 410 168.108.158.108.158.158.218.158.218.218.279 209 268.158.219.
7、149.268.218.2910.2011.1011.1011.2211.2212.128.309.69.149.2610.410.2411.611.269.69.149.3010.610.610.2010.2011.211.211.2211.2212.412.1212.1912.1912.291.131.2310.2411.611.2612.312.31.131.171.2712.412.2412.241.11.71.178.168.218.279.1等待低压#1内缸及内部套到等待高压转子与低压#1转子找中心等待低压#3内缸及内部套到货等待低压#1转子与低压#2转子找中心等待低压#3转子与低
8、压#2转子找中心,低等待发电机转子与低压#3转子找中心1.121.9等待高压1.231.301.302.7等待低压#1缸轴承安装(#1、#2轴承)高压缸内部套下半组装1落转子(包含转子找中心)2内部套下半就位3径向通流间隙测量(下半)4轴向通流间隙测量7.87.187.288.37.237.288.28.710.1611.67.158.107.158.107.218.167.187.288.309.208.208.257.278.28.258.3012.291.910.410.168.108.158.108.158.158.218.158.218.218.279.209.268.158.219
9、.149.268.218.2910.2011.1011.1011.2211.2212.128.309.69.149.2610.410.2411.611.269.69.149.3010.610.610.2010.2011.211.211.2211.2212.412.1212.1912.1912.299.2610.41.131.2310.2411.611.2612.312.31.131.171.2712.412.2412.241.11.71.1711.1812.88.168.218.279.1等待低压#1内缸及内部套到等待高压转子与低压#1转子找中心等待低压#3内缸及内部套到货等待低压#1转子与低
10、压#2转子找中心等待低压#3转子与低压#2转子找中心,低等待发电机转子与低压#3转子找中心1.121.9等待高压1.231.301.302.7等待低压#1缸时间2013-8-12013-9-12013-10-12013-11-12013-4-12013-5-12013-6-12013-7-1汽轮发电机本体安装进度计划2012-10-12012-11-12012-12-12013-3-12012-7-12012-8-12013-1-12012-9-12013-2-1时间2013-8-12013-9-12013-10-12013-11-12013-4-12013-5-12013-6-12013-7
11、-1汽轮发电机本体安装进度计划2012-10-12012-11-12012-12-12013-3-12012-7-12012-8-12013-1-12012-9-12013-2-1高压缸内部套上半组装1径向通流间隙测量(上半)2内部套上半就位高压缸上半试扣扣缸前所有部件清理检查11.611.1812.812.1512.1512.2512 251 5扣缸前所有部件清理检查高压缸扣缸扣缸后安装进度计划扣缸后安装进度计划轴系找中心(调整转子中心及联轴器垫片厚度确认)低压缸与凝汽器连接高压缸导汽管安装基础二次灌浆及养护汽轮机转子终找中心汽轮机转子靠背轮连接中心梁拧紧及地脚螺栓锁紧盘车设备组装主油泵组装
12、猫爪负荷确认汽轮机罩壳安装发电机安装进度计划发电机安装进度计划定子出线盒安装11.611.1812.812.1512.1512.258.58.159.1510.309.69.24端盖安装时间12.251.51.51.122.73.83.85.295.297.197.198.128.128.30等待发电机转子与汽轮机转子终找9.249.309.3010.510.510.1010.1010.10.1711.1第一次油冲洗开始的时间第二次油冲洗开始的时间定子出线盒安装氢气冷却器及其罩壳安装端盖预装配定子初找中心及定位下半轴承试装配转子严密性试验及穿转子下半轴承安装磁力中心及空气间隙调整密封瓦及密封瓦
13、座安装空气间隙挡板、气体冷却器挡板、鼓风机叶片及保护罩安装汽轮机-发电机第一找中心励磁机预安装及其台板安装发电机基础二次灌浆及养护汽轮机-发电机最终找中心汽轮机、发电机联轴器连接励磁机安装11.611.1812.812.1512.1512.258.58.158.159.159.1510.3010.3011.511.511.1111.1111.2111.2712.512.512.1112.111.11.71.141.11.77.238.1210.151.308.309.611 6119.3010.159.69.24端盖安装时间穿转子时间12.251.511.2111.271.51.122.73.
14、8等待汽轮机转子终找中心3.85.295.297.197.198.128.128.30等待发电机转子与汽轮机转子终找9.249.30等待汽轮机转子靠背轮连接9.249.309.3010.510.510.1010.1010.10.1711.1等待汽轮机安装第一次油冲洗开始的时间第二次油冲洗开始的时间第三次油冲洗开始的时间励磁机安装发电机整套气密性试验上半轴承安装发电机罩壳安装7 联轴器垫片加工时间未考虑。1 以上进度计划是根据设备最新到货信息,未考虑因设备缺陷而产生的等待、消缺时间,设备到货滞后,计划将往后推迟。2 设备到货之后的开箱验收时间未考虑在内。3 现场见证、验收周期未考虑。4 施工过程
15、需要厂家澄清的技术问题的等待时间,未考虑在内。6 油冲洗时,需要进轴承座冲洗,油冲洗时间未考虑。备注:5 上述计划仅供参考。11.611.1812.812.1512.1512.258.58.158.159.159.1510.3010.3011.511.511.1111.1111.2111.2712.512.512.1112.111.11.71.141.11.77.238.1210.151.308.309.611.611.309.3010.1510.3011.69.69.24端盖安装时间穿转子时间12.251.511.2111.271.51.122.73.8等待汽轮机转子终找中心3.85.295.297.197.198.128.128.30等待发电机转子与汽轮机转子终找9.249.30等待汽轮机转子靠背轮连接9.249.309.3010.510.510.1010.1010.10.1711.1等待汽轮机安装第一次油冲洗开始的时间第二次油冲洗开始的时间第三次油冲洗开始的时间
限制150内