计算机系统验证方案.pdf
《计算机系统验证方案.pdf》由会员分享,可在线阅读,更多相关《计算机系统验证方案.pdf(19页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Computerised System Validation计算机系统验证Dept.部门:Effective Date生效日期:Year/Confidential Level机密等级:Top-secret 绝密 Confidential 机密 Cryptical 秘密Distribution List:分发清单:QA 部、QC 部、OSP 固体制剂部、Lo.物控部、EN 工程部、TD 技术部、EQ 设备部Month/月Date/日QA质量保证部1 1ObjectiveObjective 目的目的Test and assessment should be taken for URS,design
2、,purchase,installation,function,as well as process adaptability of computerized andPLC control system related to GMP in compliance with this SOP so as toensure that computerized and PLC are fit for design requirement and statedtechnical criteria and are able to work stably for a long time.测试、评估采取的 U
3、RS、设计、采购、安装、功能以及计算机控制和 PLC 控制系统符合 GMP,以确保计算机和 PLC 符合设计要求和工艺要求并且能够稳定工作很长时间。2 2ScopeScope 范围范围This SOP is fit for the validation management of computerized and PLCcontrol system related to GMP,which apply to material control andmanagement,laboratory equipment control and communication management,manuf
4、acturing process control,and utilities control.本 SOP 适用于电脑,PLC 控制系统的管理是否符合 GMP,物料控制和管理,实验设备控制和通信管理、生产过程控制、公用设施的控制的验证。3 3ResponsibilitiesResponsibilities 职责职责RoleDraftReview责任人Dept.QA部门Name姓名Signature签名Date日期QC起草人审核人Review审核人OSPReviewReviewReview审核人Lo.审核人EN审核人TDReviewApprove审核人EQ批准人QDQA is responsibl
5、e for drafting,revising,reviewing,training,implementingand supervising this SOP.QA 负责起草、修订、审核、培训、实施和监督本 SOP。The quality director is responsible for approving this SOP.质量副总负责批准本 SOP。Relevant departments are responsible for reviewing and implementing thisSOP。相关部门负责审核和实施本 SOP。4 4DefinitionsDefinitions
6、定义定义Computerized or PLC control system:It composed of hardware,systemsoftware,applications,and relevant peripheral devices is a system thatcan implement a function and a set of functions.无论是计算机化还是 PLC 控制系统:都是由硬件、系统软件、应用、及相关的周边设备组成的一个系统,可以实现某一功能和一套功能。Source code:It is source program of computer whose
7、 format(programlanguage)can be read by operator,before computer execution,it should betranslate to machine language whose format can be executed by computer.源代码:它是计算机的源程序(程序语言),可以在电脑执行前被计算机识别,它应该被翻译成可以被计算机识别的机器语言。5 5ProceduresProcedures 程序程序 of Validation team and responsibility验证机构及责任Validation tea
8、m is composed of supplier,QA,Equipment Department,usedepartment.验证团队由供应商,QA、工程设备部和使用部门组成。Implementation department responsibility of system validation系统验证实施部门的职责Usedepartment:ResponsibleforprovidingwrittenURS,preparingvalidationprotocolandreport,implementingapprovedIQandOQprotocol,completingfinalrep
9、ortandparticipatingvalidationdeviation investigation and alteration review.使用部门:负责提供书面的 URS,准备验证方案和报告、实施批准 IQ,OQ 协议,完成最终报告偏差并参与调查及变更验证审核。Equipment Department:Responsible for cooperating with use departmentto prepare URS and validation protocol,receivingsystem,installingsystem and implementing IQ,gui
10、ding use department on IQ and OQ processandparticipatingvalidationdeviationinvestigationandalterationreview.设备部门:负责准备使用部门的合作协议,并确认你接收系统,安装系统,实施 IQ,指导使用部门关于 IQ 和 OQ 的验证过程和参与验证偏差调查和变更回顾。QA:Responsibleforreviewingvalidationdraftandfinalreport,implementingvalidationprotocol,participatingvalidationdeviat
11、ioninvestigation and alteration approval and archiving validation protocoland report.QA:负责审查验证,也是最后一项报告草案、实施验证方案,参与调查及变更验证偏差的批准验证方案和归档,并做好报告。System classification系统分级 validation,evaluation and classification should be carried out for systemso as to insure that different grade validation should be pr
12、ovided fordifferenttypecomputerizedandPLCcontrolsystem.Classificationasfollows:在验证之前,评估和分级应当进行系统分类,以确保不同等级验证需提供不同类型的计算机化的,PLC 控制系统,分类如下:Classification分类Description描述Validationmethod验证方法ValidateOperatingsystem,networkEstablishednetworkandoperatingsystemfor commerce.DOSWindows 95/98NT.已 做 好 网 络 和 操 作
13、系 统 例 如:DOS Windowsname andeditionnumber确认名称及版本号Thesesystemisdesignedbynon-consumerfordrivingfirmwarewhichcanbeStandarddevice,microcontroller,sensitiveequipment标准配置,微控制器,灵敏的电气设备installed in special integrate circuit(IC)forapplication,readonlymemory(ROM),suchasbarcodemodem,single-cycletemperature con
14、troller etc.(IC)的驱动固件,只读存储器(ROM)、随机存取存储器(RAM)、PLC,例如条形码调制解调器,single-cycle 控制器、灌装设备,重量控制、温度控制器等来设计的。Ready-madepackageforcommerce,suchasStandardpackage标准程序包multiplansoftware,standardchemicalanalysis software etc.现成的软件包,例如多计划软件,标准化学分析软件等。Configurablepackage可配置的程序包Users develop their own application thr
15、oughpre-definite software modules anddeveloping application modules can becarried out in this system,such as man-Validateapplicationprocess验证应用过程Auditsupplier andvalidateapplicationValidateandn置random access memory(RAM),PLC sometimes,constructioncontroller,fillingdevice,Checkweigher,configuratio这些系统
16、是根据用户可以安装在特殊的集成电路确认构造及配网络操作系统,95/98NT.machine dialogue port,management control,data acquisition system,adaptive controlsystem for laboratory,informationmanagement system for laboratory,materialrequirement planning system,dataprocessing system for system/applicationand product,part PLC etc.用户自己开发应用可通
17、过 pre-definite 软件模块和发展应用模块都可以在这个系统中运行,采用人机对话端口,管理控制,数据采集系统,自适应控制系统,信息管理系统,原材料需求计划系统、数据处理系统和产品、系统应用部分可编程序控制器(PLC)等。process andsome pre-establishedcodeImplementallvalidationSystemdevelopedwithin firm公司内部系统开发Modifying or developing system incompliance with requirement of himself修改或开发符合自己要求的系统processes
18、ofcomputerizedand PLCcontrolsystem实施计算机及PLC 控制系统验证的全过程 computerized and PLC control system with complex construction should beclassified in accordance with developing degree of each module.一些计算机化的和 PLC 控制系统复杂程度应当跟各分类模块的开发程度相一致。of computerized and PLC control system should be carried out not only for
19、use process of system,.validation of new system should be carried out notonly for initial definition and designing phase but also whole life cycleof system development.计算机验证,PLC 控制系统不仅体现在系统使用过程,如新系统的验证不仅在初始定义和设计阶段进行,而且贯穿于全部生命周期体系的发展。Validation implementation验证实施5.3.1URSURS should be prepared by syst
20、em user and project expert detailed withfundamental requirement,expectation and performance index of new/changedcomputerized and PLC control system,which will be use to determine systemdesigning criteria.Content as follow:URS 应该为系统用户和项目专家准备基本要求详细的,预期和新的性能指标、改计算机化和 PLC 控制系统,可以用来决定系统设计标准。内容如下:descript
21、ion:whattodoaboutsystem,howconnectionandinteractionbetween different module,control methods.logic control,separationcontrol,interlock control,alarm control,location control,temperaturecontrol,pressurecontrol,timecontrol,countingandothermultipolarcontrol),implementing process,ports and safety require
22、ment for operator.系统描述:系统做到什么程度,如何关联不同模块、控制方法(例如:逻辑控制、分离控制,连锁控制、报警控制、位置控制,温度控制,压力控制、时间控制、计数和其他多级控制)、实施流程、操作员的端口和安全标准。5.3.1.2Physicalrequirement:includesufficientspace,location,peripheralenvironment,etc.物理要求:包括有足够的空间,位置,周边环境等。5.3.1.3Document criteria for hardware:include chart paper,schematic chart,h
23、andbook,spare parts list etc.硬件的文件标准:包括:图纸,原理图,操作指南,备件清单等。5.3.1.Document criteria for software:include program number and revising number,4output program and detailed explanation,reproduction of software provisionand retention condition,system block drawing and configuration list.软件的文件标准:包括程序编号和修改编号
24、,输出接口程序和详细说明、软件的追加和保留条件、系统分程序图纸和配置清单。5.3.1.5Test requirement:test items and record required to be carried out onsystem developing process,including module separated test and integratedtest.测试要求:测试项目和记录必须在系统的发展过程中进行,包括模块测试和集成分离测试。5.3.1.6 Other requirement to supplier:such as finished system validatio
25、n,qualitycontrol and change control on developing process,etc.对供应商的其他要求:如在发展进程中完成系统验证、质量控制和变更控制等。5.3.2System design系统设计5.3.2.1System design should compose of system configurable chart design,hardwaredesign,and software design.After document of system design reviewed andapprovedbyconsumerwhichshouldb
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机系统 验证 方案
限制150内