1、Contract.No。EmployerSDM08KENGENNippon Koei Co。,Ltd。Sinohydro Corporation Ltd.MD06B205004(R1)516th Mar 2011Sondu/Miriu Hydropower ProjectSangoro Power PlantEngineerContractorDocument No。Page(s)DateOPERATION AND MAINTENANCE MANUALOF GENERATOR(Lot AP-2)R1REV。16th Mar 2011PREPAREDDATECHECKED1stSubmissio
2、nDescriptionENDORSEDAPPROVEDFormat:A41 1Operation of generator of generator1.1 Preparations before startup,including:a)Clean the workyard and the generator set from any debris。b)Check the tightening condition,lock the gasket tightly,tack weld ifnecessary;keep the rotatable parts clean。c)Check the in
3、let and outlet water pipelines,oil pipelines and valves,in orderto know if there are leakages and problems of water flow in the pipe.d)Check the level of lubricating oil,oil number,oil quality,water pressure,and record the water temperature and ambient temperature。e)Check each connecting cable,to ma
4、ke sure that the joints contact welland without rust,connection is right,and the marks are complete anddistinct.f)Check if the equipments of high pressure oil and the brake run normally,and if the brake pressure can meet the relevant requirements.g)Check the fire extinguishing system and other prote
5、cting facilities,toensure security。h)Check the gaps between rotating parts and stationary parts,especially whenthere are dimension requirements。i)Make preparation work of recording before start-up.1。2Initial noload start-up operationThe time of initial start-up of generator,operating sequence and th
6、e generalcommander shall be determined through consultation among the buyer,theseller and the installation entity.1.2.1 Under the organization of the general commander,the operators andmonitors shall get ready。1.2。2 Before startup,first open the cooling water of the upper and lower oilcooler and air
7、 cooler.The temperature of the oil in the oil tank shall not belower than 100C,and that in the plastic bush tank shall not be lower than50C。1。2。3 Push the rotor upward with high pressure oil,and make the thrust padlubricate to avoid dry friction。11。2。4 Manually start the generator and let the rotati
8、ng speed increase to 30%50 of the nominal speed,so that the oilbound film can be quicklyformed.Let it run for a period of time and check the bearing temperatureevery 1 min.,until the value keeps stable.There shall be no sharpincrease ofbearing temperature.At the same time,monitor the soundand observ
9、e every part to see if an abnormity occurs。1.2。5 When the generator running becomes stable and bearing temperature isnormal,increase the rotating speed to the nominal speed gradually。Make the detecting records timely:a)bearing temperatureb)temperature of inlet cooling water and outlet cooling waterc
10、)oil leveld)vibration of rack1。2.6 If the vibrationg of the generator meets the requirements(otherwisebalance test will be needed),and the temperature of the bearing bushkeeps stable,the machine can be stopped for check.1.2。7 Checking after the generator stopsa)looseness,etc.in the parts of the roto
11、r;b)resetting of the brake;c)Leakage of oil and water,and oil splashing of the upper and lower oilpipe.1。3 Initial onload run1.3。1Before the initial on-load run,the approval of relevant authority isneeded,and the checking work of the phase sequence of network andthe generator shall be well done.At t
12、he same time,open all the coolingwater,and check water pressure and flow,level of lubricating oil,winding of stator and rotor,bearing,etc.,and make good preparationbefore startup。1。3。2 Increase exciting current gradually at the nominal rotating speed.Onlywhen generators voltage,frequency andphase an
13、gle meet therequirement of network,synchronize them and switch on,and thenincrease loads in phases,and at the same time make good records,like increase of temperature,vibration,etc.21.3.3If there are no abnormalities,bring the load to rated power,maintainhour running,and check carefully the followin
14、g items:a)temperature of stator and rotor winding;b)temperature of thrust bearing and guide bearing;c)temperature of inlet and outlet wind;d)vibration of the rack;e)electric spark at the bus rings;f)Excitation data at the condition of noload and on-load;1.3。4Set the technical parameters according to
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 发电机安装使用维护说明书 英文 发电机 安装 使用 维护 说明书
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内