1、后压浆施工技术规范Technical Specification of Post Pressure Grouting一、设计 design1、对桩径800mm桩长40m采用复式注浆法即桩端与桩侧注浆法。桩端与桩侧各对称安装二根注浆管。Double pressure grouting to be adopted for 800mm dia./40m long pile,i。e.side and bottom grouting.Two grouting pipes shall be arranged for bottom andside respectively.2、注浆位置grouting po
2、sition:1)桩端注浆:注浆花管应埋入终孔孔底下100-300mm,Bottom grouting:grouting pipe should penetrate 100-300mm below thebottom of borehole。2)桩侧注浆:桩长30m/40m的桩注浆花管应设置在地面下20m/25m处的砂层中,或者15-20m/2025m处的砂层与粘性土层界面上500mm处,具体位置由各区段工勘探孔及桩钻进时的反渣情况综合判断确定,同一建(构)筑物注浆位置宜相同(详见附图二).Side grouting:grouting pipes for 30m/40m piles shoul
3、d be embedded insand strata 20m/25m underground,or 500mm above the intersection of15-20m/2025m silty sand and clay sand。Exact positions shall be reasonablydecided as per outcoming soil condition in test boring and actual piling.Grouting position for the same structure(building)is preferably identica
4、l。(seediagram 2)13、注浆管的长度:由实际施工的孔深确定,其长度为实际孔深+0。6m。Length of grouting pipe:shall be as per actual borehole depth and shouldbe 0。6m longer than borehole depth.4、注浆管采用DN20、=2.75的焊管,相邻注浆管采用丝扣连接,并用14铁丝绑扎固定在钢筋笼的外侧。注浆管底端用丝堵封闭,距底端400mm长度范围内对称均匀钻12个6的注浆孔,用胶带及图钉封孔.注浆管顶部应高出砼面0。5以上,且高出地面0。20。3m。管顶要用丝堵封闭且用不同颜色的
5、胶带缠绕,将桩底注浆管与桩侧注浆管区分开来.Grouting pipe type:DN20、=2。75 welded pipe to be adopted,and adjacentpipes to be connected with threads and tightly fixed to the outer side of rebar cagewith 14 galvanized wire。Bottom end of grouting pipe to be sealed with plugand 12 nos of6 grouting holes to be evenly drilled w
6、ithin the bottom 400mm ofgrouting pipe,and the same should be sealed with tapes and thumbnails。Top ofgrouting pipe should be 0.5m above concrete level and 0.2-0.5m above groundlevel.Pipe tops to be sealed with plugs and wrapped with tapes of different colorsto differentiate bottom and side grouting
7、pipes.5、注浆压力:桩侧:桩长30m为1.5 MPa,桩长40m为2。0 MPa;桩端:桩长30m为2.0 MPa,桩长40m为2。5MPa。Grouting pressure:pile side:1。5MPa for 30m piles and 2。0Mpa for 40mpiles;pile bottom:2。0MPa for 30m piles and 2.5 for 40m piles。6、注浆材料及注浆量:采用普通42。5级水泥,每根桩水泥用量暂定为3。0t.初始压浆时水灰比为1:1,体积为200L,余下水灰比为08:1。2Grouting material and quant
8、ity:normal OPC 42。5 grade cement to beadopted and 30t of cement for each pile.Initial grouting watercement ratioshould be 1:1,volume should be 200L and trailing watercement ratio shouldbe 8:1。7、成桩2天后开始注水打开通道。28天内进行注浆.Water to be injected into grouting pipes after 2 days of pile concretingcompletion
9、so as to clean grouting pipes and pressure grouting to be carried outwithin 28 days of pile completion8、注浆顺序:先桩侧后桩底,二者时间间隔不小于2小时.先外围后中间.注浆点距未施工或者正在施工的桩的最小距离为15m。Grouting sequence:first pile sides and then pile bottom and minimum 2 hoursinterval to be maintained between the two;first outer and then i
10、nner and minimumclearance between pressure grouting pile and installation on-going piles shouldbe at least 15m.9、终止注浆条件:采用注浆压力与注浆量双控,以注浆量控制为主,注浆压力控制为辅。Condition for pressure grouting suspension:two references to beconsidered,i.e。grouting pressure and grouting quantity whereas the lattershould be tak
11、en as primary and the former secondary。二、范围scope:1、烟囱基础(内 4 圈除外);446 根Chimney foundation(excluding inner 4 circles),total 446nos2、全部三个水塔的环基基础;每个水塔约 552 根,共 1656 根3Ring beam foundation of three NDCT。Each CT 552nos,total 1656nos3、其他需要后压浆的基础,现场与业主协商确定。Other foundations that requires pressure groutingto
12、 be discussed with theOwner at site.三、施工方案 methodology1、工艺流程technique steps:后压浆工艺流程为:制作压浆管 安装压浆管 检查压浆管质量 灌注混凝土打开压浆管,并做注水试验配制水泥浆,桩侧压浆 配制水泥浆,桩底压浆养护。Steps of post pressure grouting:grouting pile fabricationgrouting pipeinstallation-grouting pipe quality inspectionconcreting-open pressuregrouting pipe a
13、nd water injection test-cement slurry mixing and sidegrouting-cement slurry mixing and bottom grouting-curing2、注浆管制作grouting pipe fabrication:1)注浆管材料grouting pipe material:采用DN20壁厚2.75mm的焊管。Welded pipe of DN20 and 2.75mm thick2)注浆管的制作fabriaction:采用车丝机在焊管的二端车丝,每个车丝段的长度为50mm,车出来的丝应平正圆滑,不得出现偏丝滑丝,若出现应用切
14、割机将该段切除后重新车丝。车丝后应用生胶带缠绕35圈,然后在下节管的上端安装直通并拧紧。安装时应用管钳拧紧,4防止在整个注浆管管道安装过程中出现脱离或者是不封闭,导致漏浆现象的发生。同时根据实际孔深制作相应的短节,短节的二端按上述要求车丝。Thread to be made at two ends of grouting pipe with threading machines andlength of each thread should be 50mm。Threads made should be smooth andeven,and distorting or sliding threa
15、ds are not allowed.In case distorted or slidethreads are made,the same should be chopped and remade。Finished threadsshould be wrapped with 35 rounds of thread tape,and then straight couplingshall be tightly fixed to one end of the pile with pipe wrench so as to avoid leakageor disconnection during p
16、ressure grouting.Grouting pipes shall be prepared inview of pile depth and threads of connections shall be made as required.3)注浆花制作perforated grouting pipe距底端400mm内对称均布钻12个6的孔,在每对孔的断面用胶带缠绕3圈,然后将图钉安放在孔的位置,再在图钉的外侧用高压绝缘胶带缭绕3-5圈(详见附图3)。桩底注浆花管底口采用焊接方式将圆钢车成的圆锥状丝堵焊牢密封(详见附图3)。桩侧注浆花管的底口采用相配套的外丝堵密封。12 nos of
17、holes to be symmetrically and evenly drilled within bottom 400mmof grouting pipe and wrap 3-5 rounds of tapes around each pair of holes and thenpin thumbnails at the holes,then again wrap 3-5 round of highvoltageinsulation tape outside the nails(see diagram 3)。The bottom of the groutingpipe shall be
18、 sealed with suitable external plug.3、注浆管的安装installation of grouting pipe:1)注浆管位置及长度的确定grouting position and pipe length:(1)桩底注浆管的底端应设置在实际孔深以下100mm处,注浆花管应埋设在5沉渣及孔底原状土中。长度为实际孔深+0。1m。烟囱为41m(5-46 m),水塔为43。8m(1-44.8 m).Bottom grouting pipe should penetrate 100mm under the bottom of boreholeand perforate
19、d section should be embedded in bottom sediment.Pipe should be0.1m longer than actual borehole depth。(2)桩侧注浆管应设置在距设计桩底标高约15m处的粉砂层中。长度为25m+桩位处自然地面至设计桩顶的距离。烟囱(-529 m)与水塔(-1-25m)均为24m。Side grouting pipe should be embedded in silty sand 15m above design pilebottom.The length of grouting pipe should be 2
20、5m plus the distance betweenground elevation and design pipe top elevation.(3)同一断面上桩底注浆管与桩侧注浆管应对称均布。Bottom grouting pipe and sides grouting pipe on the same section should bearranged symmetrically。2)注浆管安装grouting pipe installation:(1)二次清孔期间,应将注浆管运到桩孔附近,并根据实际孔深按上述要求核算注浆管的长度,无误后方可安装。During second time
21、 flushing,grouting pipes should be gathered aroundborehole.Grouting pipe length should be calculated exactly according to actualborehole depth and be lowered after sound confirmation.(2)注浆的安装与钢筋笼的安放同时进行。桩底注浆管底部500mm处应内折15防止在注浆管下放过程中挂碰孔壁。Grouting pipe should be lowered together with rebar cage.Grouti
22、ng pipeshould be bended inward with 1525 angle at 500mm above pipe end to avoidclashing with borehole sides while lowering.6(3)注浆管与钢筋笼的主筋采用14#铁丝绑扎固定.注浆管绑扎在钢筋笼的外侧。桩底注浆管的底部15m范围内每2m设一绑扎点,其余部位及桩侧注浆管每4m设一绑扎点。Grouting pipe should be fixed with main reinforcement bar using 14galvanized wire.Grouting pipe
23、should be fixed outside of cage.Bottom groutingpipe should be fixed every two meters with cage within the bottom 15m,andremaining part and side grouting pipes to be fixed with cage every 4 meters。(4)相邻上下节注浆管采用带丝扣的直通连接,安装时应用管钳拧紧,防止在整个注浆管管道安装过程中出现脱离或者是不密实导致漏浆现象的发生.Adjacent two grouting pipes shall be
24、tightly connected with straight couplingusing pipe wrench so as to avoid disconnection or leakage during grouting.(5)在钢筋笼孔口搭接前,应对压浆管进行注水,检查其密封性,当压浆导管内注满清水后,水面能够保持稳定且不升降,证明密封完好。否则,提起钢筋笼检查漏水原因,满足要求后方可下另一节笼,下笼时要徐徐放入,严禁用力墩下或者扭动.When lapping rebar cages at borehole,water should be injected to groutingpip
25、e to check its imperviousness.The same can be confirmed if level of cleanwater in grouting pipe remains steady.Otherwise,cage should be lifted to find outleaking points,after which the next section of cage can be lowered.Cage shouldbe lowered with care and jerking or sudden free fall is not allowed。