1、 2009 年上半年系统集成项目管理工程师考试试题 2009 年上半年上午题 Which of the following statement related to PMO is not correct?(71)(71)A.The specific form,function,and structure of a PMO is dependent upon the needs of the organization that it supports.B.One of the key features of a PMO is managing shared resources across al
2、l projects administered by the PMO.C.The PMO focuses on the specified project objectives.D.The PMO optimizes the use of shared organizational resources across all projects.答案 C 2009 年上半年上午题 The inputs of developing project management plan do not include(72).(72)A.project charter B.stakeholder manage
3、ment strategy C.project scope statement D.outputs from planning processes 答案 B 2009 年上半年上午题 A project life cycle is a collection of generally sequential project(73)whose name and number are determined by the control needs of the organization or organizations involved in the project.The life cycle pr
4、ovides the basic(74)for managing the project,regardless of the specific work involved.(73)A.phases B.processes C.segments D.pieces (74)A.plan B.fraction C.main D.framework 答案 A、D 2009 年上半年上午题 (75)is one of the quality planning outputs.(75)A.Scope base line B.Cost of quality C.Product specification D
5、.Quality checklist 答案 D 2009 年下半年系统集成项目管理工程师考试试题 69.71Ris kmanagement allows the project menaget and the project team not to (71)。(1.03 分)A.eliminate most risks durin gthe planning phase of the project B.identify project risks C.identify impacts of various risks D.plan suitable responses.标准答案:A 70.7
6、2The project life-cycle can be described as (72)。(1.03 分)A.project planning,work authorization,and project reporting B.projectplanning,workauthorization,andp 响 ectreporting C.project planning,project control,project definition,WBS development,and Project termination D.project concept,project executi
7、on.And project reporting.标准答案:A 71.73(73)iS a method used in Critical Path Methodology for constructing aproject schedule network diagram that USeS boxes Or rectangles,referred tO aS nodes,tO represent activities and connects them with arrows that show the logical relationships that exist between th
8、em.(1.03 分)A.PERT B.AOA C.WBS D.PDM .标准答案:D 72.74Schedule development can require the review and revision Ofduration estimates and resource estimates to create an approved (74)that can serve aS a baseline to track progress(1.03 分)A.scope statement B.Activity list C.project charter D.project schedule
9、 .标准答案:D 73.75 The Develop Project Management Plan Process includes the actions necessary to define,prepare,integrate,and coordinate all consfiment plans into a(75)(1.03分)A.project Scope Statement B.project Management Plan C.Forecasts D.project Charter.标准答案:B 2010 年上半年系统集成项目管理工程师考试试题 试题(71)Project(7
10、1)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality (71)Arisk Bproblem Cresult Ddata 试题(71)分析 风险是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A是风险,选项B是问题,选项C是结果,选项D是数据。根据项目风
11、险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择A。参考答案 (71)A 试题(72)Categories of risk response are(72)(72)AIdentification,quantification,response development,and response control BMarketing,technical,financial,and human CAvoidance,retention,control,and deflection DAvoidance,mitigation,acceptance,and transferring
12、试题(72)分析 应对风险就是采取什么样的措施和办法,跟踪和控制风险。具体应对风险的基本措施一般为规避、减轻、接受、转移。选项A是识别、量化、措施制定、措施控制,选项B是市场、技术、资金、人员,选项C是规避、保留、控制、偏离,选项D是规避、减轻、接受、转移。因此应选择D。参考答案 (72)D 试题(73)(73)is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements (7
13、3)AQuality assurance(QA)BQuality planning CQuality control(QC)DQuality costs 试题(73)分析 质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。质量成本是指为满足质量要求所付出的主要成本。质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项A是质量保证(QA),选项B是质量计划,选项C是质量控制(QC),
14、选项D是质量成本。因此应选择A。参考答案 (73)A 试题(74)(74)is primarily concerned with defining and controlling what is and is not included in the project (74)AProject Time Management BProject Cost Management CProject Scope management DProject Communications Management 试题(74)分析 项目范围管理是项目管理(包括时间、成本、沟通)的基础。项目范围管理是最先定义和决定项目
15、中包含哪些内容和确定边界的。选项A是项目时间管理,选项B是项目成本管理,选项C是项目范围管理,选项D 是项目沟通管理,因此应选择C。参考答案 (74)C 试题(75)A project manager believes that modifying the scope of the project may provide added value service for the customerThe project manager should(75)(75)Aassign change tasks to project members Bcall a meeting of the confi
16、guration control board Cchange the scope baseline D postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline 试题(75)分析 项目经理认为调整项目范围可以给客户提供增值的服务,项目经理应该怎么做。选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进
17、项目会得到客户的相应资金前,暂缓修改。由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金,因此应选择D。参考答案 (75)D 2010 年下半年系统集成项目管理工程师考试试题 OSI is a theoretical model that shows how any two different systems can communicate with each otherRouter,as a networking device,operate at the(71)layer of the OSI model(71)Atransport Bapplication
18、Cnetwork Dphysical 该题的选项是 C。Most of the host operating system provides a way for a system administrator to manually configure the IP information needed by a host Automated configuration methods,such as(72),are required to solve the problem(72)AIPsec BDHCP CPPTP DSOAP 该题的选项是 B。Business intelligence(B
19、I)is the integrated application of data warehouse,data mining and(73)(73)AOLAP BOLTP CMRPII DCMS 该题的选项是 A 。Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes(74)are the techniques a
20、nd tools in performing quality control Statistical sampling Run chart Control charts Critical Path Method Pareto chart Cause and effect diagrams(74)A B C D 该题的选项是 C。是没有问题的,Run chart 是在 PMBOK 2008 英文版里才见到,汗。Plan Quality is the process of identifying quality requirements and standards for the project
21、and product,and documenting how the project will demonstrate compliance(75)is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements,appraising the product or service for conformance to requirement,and failing to meet requ
22、irements (75)ACost-Benefit analysis BControl charts CQuality function deployment DCost of quality analysis 该题的选项是 D 。2011 年上半年系统集成项目管理工程师考试试题 TCP/IP communication protocol contains four layers.From bottom to top,the four layers are _(71)_.(71)A network interface layer,internet layer,transport layer
23、and application layer B internet layer,network interface layer,transport layer and application layer C network interface layer,transport layer,network interface layer and application layer D application layer,transport layer,internet layer and network interface layer【正确答案】:A Ethernet is the commonly
24、 used local area network communication protocol.The standard of Ethernet is _(72)_.(72)A IEEE 802.1 B IEEE 802.2 C IEEE 802.3 D IEEE 802.11【正确答案】:C _(73)_ are the four major activities of software configuration management.configuration identification statement report change control preparation of re
25、quirement document configuration auditing(73)A B C D 【正确答案】:C The earned value technique is a commonly used method of performance measurement.It integrates project scope,cost,and schedule measures to help the project management team assess project performance.If a project s Schedule Performance Inde
26、x(SPI=EV/PV)value less than 1.0,it means that _(74)_.(74)A the project is ahead of its planned schedule B less work was completed than was planned C the cost overrun for work completed D the cost under-run of performance to date【正确答案】:B SWOT analysis is a kind of risk identification method.If the pr
27、oject team chose the SO strategy,they should _(75)_.(75)A make full use of the advantage and catch the opportunity B overcome the weakness and catch the opportunity C make full use of the advantage and reduce the threat D overcome the weakness and reduce the threat【正确答案】:A_ 2011 年下半年系统集成项目管理工程师考试试题
28、第71题 The project manager must maintain an effective communication link with the customers satisfaction with the progress of the project.The project manager maintains this link through(71).(71)A.periodic project reports,periodic visits to the customer,and telephonic exchanges B.subordinates,project t
29、eam members,and the project sponsor C.one-time reports,weekly reports,and monthly reports D.the telephone,facsimile,and data transmission 【正确答案】:A 第72题 A project manager is called to an informal meeting with the customer and a problem is raised.This problem has major implications for the project man
30、agers company,but the customer wants to pursue a solution at the meeting.The project manager should(72).(72)A.tell the customer that he will not address any problems becausethis is only an information exchange meeting B.tell the customer that the problem is not sufficiently defined to determine the
31、appropriate action C.collect as much information on the problem without committing his company to a solution D.give the customer a range of solutions that might be acceptable to his Company 【正确答案】:C 第73题 The project schedule is more than a document that lays out the activities over time to represent
32、 the time dimension of the project,it is a management tool to be used for decision making.As such,the schedule is used by the project management team to(73).(73)A.measure,delay,record,distribute,analyze,and direct B.plan,schedule,monitor,control,report,and forecast C.promote,highlight,monitor,contro
33、l,forecast,and report D.emphasize,visualize,analyze,conceptualize,report,and record 【正确答案】:B 第74题 Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller,more manageable components?(74)(74)A.Scope Planning B.Scope Verification C.Scope Change Control D.Scope Definition 【正确答案】:D 第75题 The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the (75)A.planning element B.work package C.subtask D.working interface 【正 确 答 案:B