1、会计学1沉管隧道沉管隧道(sudo)介绍英文介绍英文第一页,共45页。第1页/共44页第二页,共45页。Immersed tunnels are,n nmore advantegous as a subaquous solution in soft soilsn nincreasingly used alternative to traditionally used shield tunnelling,without having the risks associated with pressure chambers and inrush of water.n nalso suitable i
2、n water deeper than also suitable in water deeper than it it is possible with the shield method,which essentially is restricted to less than 30 m of water(concerning the maximum air pressure at which workers can safely work).n nAdvantegous as there is less loss in height than with tunnelling deeply
3、under the riverbed,and the tunnel may therefore be shorter overall.第2页/共44页第三页,共45页。n nThe worlds longest and deepest application to date is the twin-tube subway crossing of San Francisco Bay,constructed between 1966 and 1971 with a length of 3.6 miles(5,8 km)in a maximum water depth of 41 m.The 100
4、 m long,15 m wide sections were constructed of steel plate and launched by shipbuilding procedures.n nThe first tunnel of the concrete type was constructed in 1940 in Rotterdam under the Maas estuary.第3页/共44页第四页,共45页。n nThe most profound effect of an immersed tuThe most profound effect of an immerse
5、d tun nnel on the environment nel on the environment concerns the element it is meant to bypasswater.concerns the element it is meant to bypasswater.n nThe influence of the tunnel on the groundwater and the surface water The influence of the tunnel on the groundwater and the surface water in the are
6、a plays a predominant role in the tunnel design and in the area plays a predominant role in the tunnel design and construction methods.construction methods.n nAn aspect of more recent concern affecting construction is the An aspect of more recent concern affecting construction is the possible presen
7、ce of contaminated soils that must be removed for possible presence of contaminated soils that must be removed for the tunnel trench.Ways of removing these soils and transporting the tunnel trench.Ways of removing these soils and transporting them to depositories that are especially equipped to rece
8、ive them them to depositories that are especially equipped to receive them are environmental problems requiring novel techniques and quality are environmental problems requiring novel techniques and quality control procedures.control procedures.n nThe more traditional environmental aspects are those
9、 encountered on any The more traditional environmental aspects are those encountered on any construction job:noise,dirt,and traffic hindrance.construction job:noise,dirt,and traffic hindrance.第4页/共44页第五页,共45页。n nThe top of the tunnel should be protected by adequate protective backfill,The top of the
10、 tunnel should be protected by adequate protective backfill,extending about 30 m on each side of the structure and confined within dykes or extending about 30 m on each side of the structure and confined within dykes or bunds.The fill must be protected against erosion by currents with a rock blanket
11、,bunds.The fill must be protected against erosion by currents with a rock blanket,protective rock dykes or other means.protective rock dykes or other means.n nTides and current effects of the waterway must be evaluated to determine conditions Tides and current effects of the waterway must be evaluat
12、ed to determine conditions during dredging and tube sinking operations.during dredging and tube sinking operations.n nImportantly,dredging and backfilling operations should be executed in such a Importantly,dredging and backfilling operations should be executed in such a manner as to limit disturban
13、ce in the manner as to limit disturbance in the natural ecological balancenatural ecological balance at the at the construction site.construction site.n nGovernmental agencies having jurisdiction over environmental protection,natural Governmental agencies having jurisdiction over environmental prote
14、ction,natural resources or local conditions must be consulted and approval of authorities should be resources or local conditions must be consulted and approval of authorities should be obtained in the preliminary design stage.obtained in the preliminary design stage.第5页/共44页第六页,共45页。FoundationFound
15、ationn nThe foundation method to be used must be chosen with due consideration,The foundation method to be used must be chosen with due consideration,first of all,for the subsoil conditions and the degree to which the tunnel will first of all,for the subsoil conditions and the degree to which the tu
16、nnel will be subject to be subject to dynamic loadingsdynamic loadings,and,and earthquake loadingsearthquake loadings in particular.Pile in particular.Pile foundations are an option but this solution has been used for a few tunnels only.foundations are an option but this solution has been used for a
17、 few tunnels only.For both steel and concrete types of tunnels,the main tasks are:For both steel and concrete types of tunnels,the main tasks are:n nExcavation of a tunnel trench to specifications and to keep it free of siltation Excavation of a tunnel trench to specifications and to keep it free of
18、 siltation that may be detrimental to the permanent foundation until this foundation has that may be detrimental to the permanent foundation until this foundation has been constructed and the tunnel has been brought to rest on it.been constructed and the tunnel has been brought to rest on it.n nCons
19、truction of watertight and durable tunnel elements.Construction of watertight and durable tunnel elements.n nInstallation of the tunnel elements in the tunnel trench.Installation of the tunnel elements in the tunnel trench.n nConstruction of watertight and durable joints between the tunnel elements.
20、Construction of watertight and durable joints between the tunnel elements.n nConstruction of a durable foundation for the tunnel.Construction of a durable foundation for the tunnel.第6页/共44页第七页,共45页。n nOnce completed,an immersed tunnel is no different operationally from any other tunnel.Once complete
21、d,an immersed tunnel is no different operationally from any other tunnel.However,it is built in a completely different way.However,it is built in a completely different way.The Construction technique:The Construction technique:n nA trench is dredged in the bed of the water channel.A trench is dredge
22、d in the bed of the water channel.第7页/共44页第八页,共45页。Tunnel Trench DredgingTunnel Trench DredgingThe dredging works required for the construction of an immersed The dredging works required for the construction of an immersed tunnel will normally comprise some,or all,of the following items:tunnel will
23、normally comprise some,or all,of the following items:n nDredging of a casting or launching basin.Dredging of a casting or launching basin.n nDredging of test pits in the waterway for evaluation of siltation of tunnel Dredging of test pits in the waterway for evaluation of siltation of tunnel trench.
24、trench.n nWidening of the existing navigation channel in order to provide temporary navigation Widening of the existing navigation channel in order to provide temporary navigation channels outside the marine working area.channels outside the marine working area.n nCompensation grouting to make up fo
25、r the reduction of the waterway cross Compensation grouting to make up for the reduction of the waterway cross section caused by the permanent tunnel works,and thereby avoiding section caused by the permanent tunnel works,and thereby avoiding changes in hydrographical and biological conditions in th
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 隧道 介绍 英文 学习 教案
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内