1、2023年内蒙古PMP资格认证考试考试真题卷本卷共分为1大题50小题,作答时间为180分钟,总分100分,60分及格。一、单项选择题(共50题,每题2分。每题的备选项中,只有一个最符合题意) 1.The process giving confidence that the project will meet appropriate quality standards is called _ A) scope verification B) perform quality control C) perform quality assurance D) quality planning 2.The
2、 statistical method that looks at the influence of different factors on specific variables is called _ A) design of experiments B) benchmarking C) variability of factors D) ISO 3.Which of the following has the greatest effect on a product's reliability and maintenance characteristic? A) Conceptu
3、alization. B) Product design. C) Fabrication. D) A and B. 4.On a project the project manager should strive for a Quality Level that _ A) is the highest level possible B) is as close to the project objectives as possible C) represents the least cost to the project D) exceeds the specified requirement
4、 of the project 5.Perform quality control in the final analysis is _ A) using the technical procedures of monitoring project results to decide if the outputs meet the requirements B) a production system C) a inspection system D) fitness for purpose 6.Costs of quality include _ A) the total of all co
5、sts incurred to assure the production and delivery of acceptable products and services B) only costs classified as prevention, detection and corrective action C) only the costs of scrap, rework due to defects, customer returns and warranty costs D) the expense of upper management 7.Who benefits from
6、 a strong, comprehensive and consistent quality control program? A) The contracting organizations. B) The manufacturing group. C) The customer. D) A, Band C. 8.To ensure the project team provides the functionality the customer expects in a new piece of software, the PM asks the customer for sign-off
7、 on the design criteria. These documents are _ A) technical specifications B) performance specifications C) product descriptions D) quality assurance perform quality assurance 9.The characteristics of a well-rounded and consistent quality program are _ A) top management support, quality is designed
8、into the product or service, recognition of quality performance at all organizational levels, using statistics as a basis for control, regular audits, and team participation in the quality control process B) middle management support only, quality is designed into the product or service, recognition
9、 of quality performance at all organizational levels, a strong and active punishment system, using statistics as a basis for control, and team participation in the quality control process C) top management support, a quality policy force, a strong punishment system, quality is designed into the prod
10、uct or service, recognition of quality performance at all organizational levels, using statistics as basis for control and regular audits D) top management support, quality is designed into the product or service, recognition of quality performance at all organizational levels, using statistics as a
11、 basis for control, regular audits, and a global information system 10.Jake has been assigned the position of PM of multi-organizational project. His organization, which is the primary performing organization, has a weak quality policy. The other organizations have no quality policy. Jake should _ A
12、) use the policy for his organization, since his organization is the primary performing organization B) forget about the quality aspects of the project since two-thirds of the team have no quality policy C) work with the team members from the various organizations and develop a quality policy for th
13、e project without telling anyone, to eliminate negative feedback D) seek buy-in from all organizations to fund a quality program 11.The widget production project is well underway. The requirements are clear that each widget must weigh between 0.320 and 0.325 ounces. The first day of test production
14、resulted in 1247 widgets. Of the widgets inspected 47% fell within the acceptable weight range. This is an example of _ A) variable sampling B) attribute sampling C) control charting D) flow charting 12.A project team is in the design stage of a new mountain bike prototype. The team is in the proces
15、s of identifying which type of frame and material will provide high performance at a low cost. Which of the following is the most likely technique used to determine these variables? A) cost/Benefit analysis. B) Ishikawa diagram. C) Design of experiments. D) System flowchart. 13.Your project has had
16、a major defect and you have gotten the project team and the quality engineers involved in problem analysis. There are three different opinions of what the cause of the problem might be. In order to get the root of the problem you decide to use a cause-and-effect diagram. Which of the following would
17、 best describe what the group is involved in? A) Quality analysis. B) Quality planning. C) Quality control Perform quality control. D) Quality assurance Perform quality assurance. 14.The project team has created a plan for how they will implement the quality policy. If this changes during the projec
18、t, it will also be a change to _ A) the project plan B) the quality control plan C) the quality assurance plan D) the quality management plan 15.Which of the following is true of inspections? A) They may not be conducted by the project team. B) They test future desires of prospective customers. C) T
19、hey can only be conducted on the final product. D) They prevent errors from reaching the customer before delivery. 16.Based on quality control measurements on your manufacturing project, management releases that immediate corrective action is required to the material requirements planning (MRP) syst
20、em to prevent future problems on other projects and to minimize rework. To implement the necessary changes you should follow _ A) the organization's quality policy B) the quality management plan C) established operational definitions and procedures D) procedures for integrated change control 17.
21、Which of the following is not able to create positive effect? A) Continuous improvement. B) Do more inspection. C) Statistical quality control. D) Customer trace process. 18.The project team should have knowledge of statistical process control to help conduct quality control activities. Of all the t
22、opics involved, which of the following is the most important for the team to understand? A) Sampling and probability. B) Attribute sampling and variable sampling. C) Tolerances and control limits. D) Special causes and random causes. 19.Ranking ordering of defects should be used to guide corrective