1、 Listening Dialogues about Inspections Task 1 Michael is answering a call from David. Listen to the conversation and match the people with the correct information.a. the Production Managerb. a designing engineerc. notified of having a meetingd. will discuss product design with Michaele. works in Qua
2、lity Inspection DepartmentAnswer: Michaele; Davida,c; Mariahb,dDavid: Hello! Is that Michael speaking?Michael: Yes, it is.David: Michael, this is David, the Production Manager. Im calling to inform you of the meeting at 9 this morning in the SecondConference Room.Michael: What is it for?David: For t
3、he preparation of 1236SD lathe production.Michael: The newly-designed lathe?David: Exactly. We will discuss its design specifications on behalf of the Quality Inspection Department with Mariah.Michael: Mariah?David: Yes, an engineer from the Designing Department.Michael: All right. Ill be there on t
4、ime.David: Thanks. See you then.v ScriptTask 2 Michael is talking about 1236SD Lathe with Mariah at the meeting. Listen to the conversation and fill in the blanks with what you hear.Michael: Mariah, could you tell me the most striking 1_ of 1236SD Lathe? To carry out inspection, we need to have a br
5、oad knowledge of the product to be manufactured and its 2_ use.Mariah: Well, different from other products, the 1236SD Lathe is designed to enable the user to take a 3_ position when they operate it.Michael: So SD 4_ for Sit Down.feature end sitting stands Mariah: Right. And it will be built with th
6、e same strong 5_ as our full-size lathes.Michael: Yes.Mariah: A high-quality, precision 6_ , precision machined bedways (床身导轨), as well as our 7_ locking mechanism are all standard features of this machine.Michael: Spindle, bedways and locking mechanismMariah: Here is the detailed designing 8_ .cons
7、truction spindle patented specifications. Michael: I will take it back to the Inspection Department to study it together with my 9_ before we can set up a sequence of 10_ .Mariah: Contact me anytime you have a problem.colleagues inspections Task 3 Michael is discussing an inspection scheme with Moni
8、ca, the Quality Inspection Manager. Listen to the conversation and choose the best answer to each question.1. Which inspection will be conducted first? A. First Piece Inspection. B. Receiving Inspection. C. Batch Inspection. D. Sampling Inspection.2. According to Monica, which inspection is of great
9、 importance? A. First Piece Inspection. B. Receiving Inspection. C. Final Inspection. D. Sampling Inspection. 3. How often will they carry out the sampling inspections?A. Twice a week. B. At set intervals.C. At random. D. Every day.4. When is the Final Inspection usually carried out?A. Before the la
10、thes are ready for packaging.B. After the lathes are transported to the customers.C. Before the lathes are installed for a testing.D. When the material and the parts from the suppliers arrive.5. What does Monica remind Michael to do at last?A. To send her the inspection scheme.B. To check missing pa
11、rts of the lathes.C. To study the designing specifications.D. To keep records of the inspections. Michael: Monica, have you got a moment?Monica: Sure.Michael: Im working on the inspection scheme of the 1236SD Lathe.Monica: Good. How is it going?Michael: Actually, we have already worked out a scheme
12、for the whole inspection process based on the studying of its designingspecifications.Monica: With the time to carry out each specific inspection and the equipment to use?Michael: Yes.Monica: Thats good. What inspections are you going to make?Michael: The first one is the Receiving Inspection.v Scri
13、ptMonica: To examine the raw material and the parts from the suppliers?Michael: Yes, to ensure that they are of good quality. Then, there will be a First Piece Inspection.Monica: To check the first piece against all the specifications. Thats very important.Michael: Yes. After that, we are going to c
14、onduct several Sampling Inspections.Monica: Will you do that at random or at set intervals?Michael: At random.Monica: Dont forget to specify the sample size.Michael: We wont. And the last one is the Final Inspection.Monica: That is usually done before the products are ready for packaging.Michael: Ye
15、s. To check defects and missing or damaged parts.Monica: Quite good. Remember to keep records of the inspections.Michael: All right. Thanks.Task 4 Diana, a new assistant in Quality Inspection Department is asking Michael about First Piece Inspection. Listen to the conversation and answer the followi
16、ng questions. 1. What did Diana do during the weekend?2. What problem did she have in reading the inspection scheme? She read the inspection scheme of the 1236SD Lathe. She couldnt understand some terms in it. 3. What does “first piece” in “First Piece Inspection” refer to? 4. Whats the responsibili
17、ty of an inspector who conducts First Piece Inspection? 5. Why is First Piece Inspection important? It refers to the very first product or part of an order produced by a factory.An inspector should check every dimension and attribute of this part or product according to design specifications. In add
18、ition, he/she has to record all measurements and observations on the Inspection Report. Then he/she should sign and date the report.Because First Piece Inspection helps avoid wrong understanding by the operator before the actual production begins.Diana: Good morning, Michael.Michael: Good morning, D
19、iana. Did you have a nice weekend?Diana: Well, not very, actually. I spent a whole day reading the inspection scheme of the 1236SD Lathe youve given me. But it seemed that some terms were beyond my understanding.Michael: For example?Diana: First Piece Inspection.Michael: Ah, its also called “First A
20、rticle Inspection”. The inspection is carried out when the first piece of an order is produced.v ScriptDiana: What is “first piece” or “first article”?Michael: Technically, it is the very first product or part we produce before actual production is authorized. And every dimension and attribute of th
21、is part or product will be checked according to design specifications.Diana: What else should we do when we conduct such an inspection?Michael: We should record all measurements and observations on the First Piece Inspection Report. Then we should sign and date the report.Diana: Is it very important
22、 in the whole inspection process?Michael: Of course. When the very first piece of the production is approved, although we cannot predict all the pieces will be correct, at least wrong understanding by the operator can be avoided.Diana: I see. Thanks a lot.Michael: You are welcome. Task 5 Monica is c
23、alling Michael. Listen to the conversation and take notes with the information you hear.Notes about the MeetingTimeParticipantsProblem to solveThe tool to be used in analysisExpected outcome 2 oclock in the afternoonDavid, the Production Manager.Mariah, a designing engineer.Two operators from the Production Department.Michael,a quality inspection engineer.Monica, the Quality Control Manager.The tailstock clamp of the 1236SD Lathe is not rigid as it is designed to be.The Cause-and-effect Diagram.Work out corrective measures. THANK YOU