Unit-14-Product-Test-and-Quality-Control-机电专业英语-图文课件.ppt
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《Unit-14-Product-Test-and-Quality-Control-机电专业英语-图文课件.ppt》由会员分享,可在线阅读,更多相关《Unit-14-Product-Test-and-Quality-Control-机电专业英语-图文课件.ppt(40页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Unit 14 Product Test and Quality ControlContentslNew Words&Expressions lText&TranslationlComplex Sentence AnalysislKey to ExercisesNew Words&Expressions lculmination klminein n.顶点lcontractual kntrktul adj.契约的ldeficiency difinsi n.缺乏,不足lquasi-static kweisaisttikadj.准静态的lhysteresis histri:sis n.滞后作用,(
2、物)磁滞现象lclearance fit 间隙配合linterference fit 过盈配合ltransition fit 过渡配合lliaison lieizn n.联络Text&Translationl1.Product Test lProduct test can be thought of as the culmination of all process control work.It can also be thought of as a quality check of the inspection process itself.If the quality plan is a
3、dequate and carried out properly,then the products performance should have been verified and a total test is redundant.For this reason,a test of the completed product is often nothing more than a contractual requirement that must be performed before the customer accepts the product.But product test
4、is also more than proving.And testing to whole is equal to the sum of the parts.Text&Translationl 1It allows for gathering data that support the design theory of the product,for interpretations to be made for further improvements in design so that future products will be better than present ones,and
5、 for evaluation of design evolution toward better performance costs.In addition,it is a means of verifying design,since not all design parameters can be fully calculated or predicted.Text&TranslationlProduct test engineers work closely with design engineers to provide useful data for testing.They mu
6、st also work in close harmony with engineers all other phases of manufacturing.Not infrequently,product testing will turn up deficiencies in design that requires major revisions in manufacturing processes.This is particularly true if the company produces many prototypes and has short production runs
7、.Therefore,manufacturing engineers are as interested in product tests results as design engineers.Text&TranslationlFor complex products,product test becomes a very important part of the total process control function.It gives the company a high degree of confidence that the product will perform as t
8、he customer expects it to,and this is a valuable marketing tool as it helps to establish the proper reputation with the customers.Text&Translationl2.Geometric Errors lGeometric errors are defined here as errors in form of individual machine components(e.g.,straightness of motion of a linear bearing)
9、.Geometric errors are concerned with the quasi-static accuracy of surface,which bear upon the moving relative of the surfaces.Geometric errors can be smooth and continuous(systematic)or they can exhibit hysteresis(e.g.,backlash)or random behavior.2Many factors affect geometric errors including:surfa
10、ce straightness(see Fig.14-1),surface roughness,bearing preload,kinematics versus elastic design principles and structural design philosophies.Text&TranslationFig.14-1 Straightness Errors Caused by Surface Form and Finish Errors Text&Translationl3.Fit and Tolerance lFit is defined as the relation re
11、sulting from the difference between the sizes of two mating parts.And tolerance is defined as the difference between the maximum limit and the minimum limit.The tolerance is also equal to the algebraic difference between the upper and lower deviations(see Fig.14-2).Text&TranslationFig.14-2 Diagram I
12、llustrating Basic Size,Deviations and Tolerances Text&TranslationlDepending upon the actual limits of the hole or shaft,a fit may be classified as follows:l(1)Clearance fit is a fit that always provides a clearance between the mating parts.In this case,the tolerance zone of the hole is entirely abov
13、e that of the shaft.l(2)Interference fit is a fit that always provides interference between the mating parts.Here,the tolerance zone of the hole is entirely below that of the shaft.l(3)Transition fit is a fit that may provides either a clearance or interference between the mating parts depending on
14、the actual dimensions of the finished products.Text&TranslationlA tolerance is designated by a letter(in some cases,two letters),a symbol,and a numerical symbol.Capital letters are used for holes and small letters for shafts.The letter symbol indicates the position of the zone of tolerance in relati
15、on to the zero line representing the basic size.The numerical symbol represents the value of this zone of tolerance and is called the grade or quality of tolerance.Both the position and the grade of tolerance are functions of the basic size.A size with tolerance is thus defined by its basic value fo
16、llowed by a letter and a number,e.g.,20H7 or 20g6.Text&TranslationlIn engineering drawing practice,the tolerance for hole and shaft is written a little above and little below the basic size,respectively.3Similarly,a fit is indicated by the basic size common to both the mating components,followed by
17、the appropriate symbols corresponding to each component.Text&Translationl4.Quality Planning lThis is the planning and strategy activity of process control,and is sometimes referred to as process planning or inspection planning.The engineers involved develop the plans for checking the adequacy of per
18、formance of shop operations to ensure that the final product performs as designed.Using plans and methods produced by measurement of productivity and work measurement(MP&WM)as a guide,quality-planning engineers determine where inspections and nondestructive tests will be specified during the manufac
19、turing process.They also specify the type of inspection or test to be conducted and,based on design engineering requirements,determine what will constitute acceptance or rejection.Text&TranslationlNormal manufacturing activities produce a certain percentage of deviations from drawing.Some are import
20、ant,some of little consequence.It is the quality planning engineers responsibility to evaluate these deviations and determine what the proper corrective action will be.They then ensure through MP&WM that the corrective actions are factored into manufacturing planning for rework.As the arbiter of qua
21、lity via the deviation from drawing procedure,quality planning has the database to evaluate performance of the various shop and support functions.A score-keeping function is possible and desirable;in this way quality planning can report to management whether quality levels are improving or declining
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Unit 14 Product Test and Quality Control 机电 专业 英语 图文 课件
![提示](https://www.taowenge.com/images/bang_tan.gif)
链接地址:https://www.taowenge.com/p-77576891.html
限制150内