1、建筑建筑环境与能源境与能源应用工程用工程专业英英语1515Commissioning is often performed by an independent third-party engineering company.Operates as an owners representative to insure the installed systems meet the owners requirements and the plans and specificationsUsually hired by the owner,sometimes by the architect,or g
2、eneral contractor.Commissioning PersonAll participants in the construction project have a commissioning responsibility.Participants include the commissioning authority,owner,design professionals,construction manager,general contractor,subcontractors,operation and maintenance manager,suppliers,and eq
3、uipment manufacturers.Benefits of CommissioningReduced change ordersLess warranty and callbacks for contractorSmoother turnover to maintenanceImproved equipment reliabilityReduced IEQ problems Reduced occupant complaintsImproved productivityCorrect system operation and installationFacility meets Own
4、ers expectation and operational needsReduced utility consumption and operational costsCommissioning Objectives Ensure the facility meets the owners performance requirements Provide a safe and healthy environment Provide optimum energy performance Provide a facility that can be efficiently operated a
5、nd maintained Provide complete orientation and training to facility staff and occupants Provide improved documentation of system characteristicsCommissioning -What did we use to do and why do we need it?CX of mechanical and electrical systems was done by the installing contractors No standardization
6、,or clear approach Most of the real CX occurred during the warranty period as warranty calls Buildings operated less efficiently First year of occupancy was frustrating for the owner Contractors spent more money during the warranty periods Contractors can be rushed without enough time to double-chec
7、k their work Design Engineers do not have enough budget to oversee the construction in detail Owners have had bad experiences with prolonged project closeout,and see CX as a solution Hold contractors accountable for the specificationsCommissioning ScopeMechanical SystemsAll HVAC equipmentBuilding au
8、tomation system and hardwired controlsElectrical SystemsSwitchgear,major disconnects,backup generators and UPS(Uninterrupted Power Supply)Fire Safety SystemsSecurity SystemsKitchen equipmentIrrigation systemLaboratory Fume hoods,gas controlCommissioning and Construction PhasesPrepare,Design Intent,C
9、X Plan,and SpecificationsReviewSubmittals,Prepare Checklists and Testing PlansVerifyComponents,Witness Start-Upand ComponentTestingPerformFunctionalTesting,ResolveDeficiencies,ReviewO&MPrepareCX Report,Staff Training,DefineSeasonalTestingPlanningDesignConstructionOccupancyAcceptanceOther Types of Co
10、mmissioningRetro-commissioningPerformed to existing buildings that have not previously been commissioned,after they have been occupiedUsually instigated as a result of high energy bills or poor occupant comfortRecommissioningPerformed 5 to 10 years after a building was previously commissionedSometim
11、e used as a form of deferred maintenanceVariable Air Volume(VAV)use of varying airflow to control the condition of air,in contrast to the use of constant flow(often)with varying temperature.VAV system controls temperature in a space by varying the quantity of supply air rather than varying the suppl
12、y air temperature.A VAV terminal unit at the zone varies the quantity of supply air to the space.The supply air temperature is held relatively constant:while supply air temperature can be moderately reset depending on the season,it must always be low enough to meet the cooling load in the most deman
13、ding zone,and to maintain appropriate humidity.Why use VAV?Provides multiple zones of comfortLife cycle cost will be less than other HVAC Systems trying to accomplish similar comfort levelsLoad diversitySmaller equipment (lower AC unit first cost compared to Constant Volume)Less supply air(less ener
14、gy consumption)Able to adapt to changes in building useWhy Not?Higher first cost than comparable single zone Controls,equipment,commissioningIncreased maintenance costMore pieces to look afterConstant volume-variable temperature system have been dominating the HVAC applications in the past for obvio
15、us reasons.The implementation of variable volume control has been done with dampers or other mechanical control methods.The advantages of variable air volume system implemented with variable speed control are:l Fast control to keep the comfort zone limits l Low consumption of electrical energy l Low
16、er consumption of heating and cooling energy than in constant air volume systems l Simpler to keep noise level down 1.Introduction2.Commissioning method statement3.System components 4.Preliminary checks5.Commissioning sequence 6.Setting to work 7.Terminal units 8.Secondary air distribution9.Return a
17、ir spigots 10.System diversity 11.Fan design performance check 12.System performance checks Frequently used words and phrases:Variable air volume(VAV)system 变风量系统变风量系统commissioning 试运行试运行 调试调试 air volume flow rate 空气体积流量空气体积流量terminal unit 终端设备终端设备 flexible duct 柔性风管柔性风管Pitot tube 毕托管毕托管 thermal ane
18、mometer 热线风速仪热线风速仪supply fan 送风风机送风风机 extract fan 排风机排风机over-pressurization 压力过高压力过高 spigot 套管、栓、龙头套管、栓、龙头1.Variable air volume(VAV)systems are dynamic air distribution systems and,as their name implies,the air volume flow rate is varied according to various parameters to achieve the required design
19、 conditions.2.The fact that VAV systems are designed to vary system performance imposes a number of specific tasks on the commissioning specialist,which must be carried out in order to achieve satisfactory overall performance.3.Proprietary units may employ a variety of means of regulating air volume
20、 flow rate including motorized dampers,inflating bellows,restricting flexible duct sections or a combination of such devices.Variable air volume(VAV)systems:变风量系统变风量系统 dynamic:动态的动态的air volume flow rate:空气体积流率空气体积流率 design conditions:设计条件设计条件impose:施加施加 带来带来 commissioning specialist:调试人员调试人员propriet