1、Unit 1 The Importance of Management in Civil Engineering Lesson 1 Emerging Role of Management in Civil Engineering1.Why are managerial skills highly demanded in civil engineering?Because civil engineering firms have grown substantially in staff size,disciplines,and geographic areas served,so these c
2、onditions have created a demand for civil engineers with special skills in project management.2.What are the main subjects one should learn in order to get MPM(Masters in Project Management)?It includes subjects as:1.Financial issues for engineers2.Bargaining and negotiations3.Human resources manage
3、ment4.Project scheduling5.Accounting issues for engineers6.Engineering law3.Why is it necessary to provide a local manager?What kind of qualities should he possess?When the projects are based in remote locations,particularly overseas,and when the client requires the design to be carried out locally,
4、it becomes necessary to provide a project manager possessing not only well-honed engineering skills and good judgment,but other skills in contract management,such as those needed to negotiate changes in project scope and duration.Lesson 2 The Construction IndustryWhat is construction?Why is the cons
5、truction of projects so complicated?Construction is essentially a service industry,whose responsibility is to convert the plans and specifications prepared by an engineer or an architect into a finished project.The construction of projects involves thousands of details and complex interrelationships
6、 among owners,architects,engineers,general contractors,speciality contractors,manufacturers,material dealers,equipment distributors,governmental bodies and agencies,labor,and others What should designers and constructors do in order to cooperate with each other harmoniously?The designer must be in c
7、lose contact with everything that is done during the construction work so that any changes in the site conditions,materials and work being done can be evaluated and,if necessary,corrected or improved.The constructors should have the same knowledge of the working-plan as the designer.They must also k
8、now the details of the design and must understand any unusual aspect of the design.Both the designers and constructors must always work in harmony.Give a brief analysis of the five steps of construction.The first stage of evaluation consists of a careful study of demand of design and of the site its
9、elf.The second stage is most important if the job is to be done economically.The equipment,labor and materials for each stage in the construction must be provided at the correct time.The third includes constructing access roads,making the warehouse,concrete mixers,offices and housing for the workmen
10、 ready.The fourth is building the structure and the fifth is cleaning up.Unit 2 Building Types and MaterialsLesson 3 Building Types1.What are industrial buildings and civil buildings?Industrial buildings are used by various factories or industrial production while civil buildings are those that are
11、used by people for dwelling,employment,education and other social activities.2.What are peoples requirements today for housing besides shelters?Why?people today require much more than this of their housing.A family moving into a new neighborhood will want to know if the available housing meets its s
12、tandards of safety,health,and comfort.A family will also ask how near the housing is to grain shops,food markets,schools,stores,the library,a movie theater,and the community center.3.What is the modern trend of industrial buildings?The modern trend is towards light,airy factory buildings with the of
13、fices,reception rooms,telephone exchange,etc.,house in one low building overlooking the access road,the workshop,also light and airy,being less accessible to public view.Lesson 4 Material Procurement and Delivery1.According to the text,what is the broad classification of material for delivery?The ma
14、terials for delivery to and from a construction site may be broadly classified as:(1)bulk materials,(2)standard off-the-shelf materials,and(3)fabricated members or units.2.Describe in detail how to simplify field assembly.Fabricated members such as steel beams and columns for buildings are pre-proce
15、ssed in a shop to simplify the field erection procedures.Welded or bolted connections are attached partially to the members which are cut to precise dimensions for adequate fit.Similarly,steel tanks and pressure vessels are often partly or fully fabricated before shipping to the field.3.What should
16、be taken into consideration when it comes to the time for equipment procurement?Requisition ready by designerOwner approvalInquiry issued to vendorsVendor quotations receivedComplete bid evaluation by designerOwner approvalPlace purchase orderReceive preliminary shop drawingsReceive final design dra
17、wingsFabrication and delivery Unit 3Construction TechnologyLesson 5 Surveying and Mapping1.How can you survey an area of land?An area of land without hill or many buildings can be accurately surveyed with nothing but a good steel tape,but this is hard work when the land has more sides than four,or w
18、hen its sides are longer than 1,000 meters.A small area with many hindrances to the lines of sight across it can not be exactly surveyed with a tape,and an instrument that measures angles will then be needed.2.In what way can you get the length of the unmeasured sides?With a theodolite,it is possibl
19、e to get the lengths of the unmeasured sides from the known angles of the triangle and measured side.3.How do you use a tachometer?The tacheometer is often used with the plane table.It is an ordinary theodolite with two horizontal hair lines in the telescope which are at such a distance apart that t
20、hey subtend at a100 meters a length of 1 meter.Lesson 6 Earthwork1.What does earthmoving mean?How can the earthwork costs be reduced?Earthwork or earthmoving means cutting into ground where its surface is too high(cuts),and dumping the earth in other places where the surface is too low(fills).To red
21、uce earthwork costs,the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placed near to fills of equal volume so as to reduce transport and double handling of the fill.2.What are the respective advantages and disadvantages of draglines,bulldozers
22、 and face shovels?Draglines,bulldozers and face shovels can do this.The largest radius is obtained with the draglines,and the largest tonnage of earth is moved by the bulldozer,though only over short distances.The disadvantages of the dragline are that it must dig below itself,it cannot dig with for
23、ce into compacted material,it cannot dig on steep slopes,and its dumping and digging are not accurate.3.What is the distinction between dumpers and dump trucks?The distinction between dumpers and dump trucks must be remembered.Dumpers tip forwards and the driver sits behind the load.Dump trucks are
24、heavy,strengthened tipping lorries,the driver travels in front of the load and the load is dumped behind him,so they are sometimes called rear-dump trucks.Unit 4Project Management1.What is project management and how is it accomplished?Project management is the application of knowledge,skills,tools a
25、nd techniques to project activities to meet project requirements.Project management is accomplished through the application and integration of the project management processes of initiating,planning,executing,monitoring and controlling,and closing.The project manager is the person responsible for ac