1、振冲碎石地基处理第1页/共27页夯扩碎石桩振冲碎石地基处理振冲碎石地基处理第2页/共27页碎石振冲置换桩第3页/共27页碎石桩地基处理第4页/共27页 采用振冲法在地基中设置碎石桩加固地基的方法称为振冲碎石桩法。振冲碎石桩法适用于处理不排水抗剪强度不小于20kPa的黏土、粉土、砂土、饱和黄土和人工填土地基。9.2 9.2 振冲碎石桩法振冲碎石桩法9.2 Vibroflotation Stone Column Method第5页/共27页9.1.1 Introduction For over 70 years depths vibrators have been used to improved
2、 the bearing capacity and settlement characteristics of weak soils.Vibro compaction was introduced and developed to maturity by the Johann Keller Company in 1936,which enabled the compaction of non-cohesive soils to be formed with excellent results.第6页/共27页 Vibro compaction has been applied successf
3、ully on numerous sites around the world.Reliable stone column production by vibro compaction in cohesive soils with a high water content is achievable with the aid of a heavy water jet.Water is jetted from the vibrator tip as the vibrator is lowered to the desired depth.Mud flushes loosened soil and
4、 rises to the surface,stabilising the cavity.This is known as the wet vibro replacement method.第7页/共27页To overcome the limitations of the vibro compaction method,a technique to insert the vibrator into the soil without the aid of simultaneously flushing in water was developed in 1956.After the vibra
5、tor is lifted,the temporarily stable cylindrical cavity is filled with coarse material,section by section.The coarse material is then compacted by repetitive use of the vibrator.第8页/共27页 This vibro replacement procedure came to be known as the conventional dry method.Such technical developments in d
6、ense stone column construction allowed for a greater range of treatable weak natural soils and man-made fills.Vibro replacement continues to be widely used in Europe to improve weak soil.It has a reputation for providing stable ground which allows for safe and economic construction of residential an
7、d light commercial and industrial structures.第9页/共27页The conventional dry method utilizes the vibrator to displace the surrounding soil laterally,rather than for primary compaction of the original soil.The crushed stone is pressed laterally into the soil during both the cavity-filling stage and comp
8、action stage.This produces stone columns that are tightly interlocked with the surrounding soil.第10页/共27页Groups of columns created in this manner can be used to support large loads.The conventional dry method reliably produces stone columns to depths of 8 m in cohesive soils that have a shear streng