1、目 录Contents第1章 工程情况 protect introduction31.1工程概况及编制说明 General Situation and Information31.2本装置工程范围内设备概况 Condition of Facilities3第2章 编制依据 basis of compilation6第3章 吊装方案确定及吊车选型、来源confirming of hoisting scheme and the type and source of crane73.1方案的确定 Confirming of Hoisting Scheme73.2吊车选型、来源Type and Sou
2、rce of Crane73.3吊装条件 Condition of Hositing8第4章 大型设备的吊装工艺及吊装准备hoisting craft and equipmeng of large-scale equipments104.1吊装工艺流程图Process Flow Diagram of Hoisting104.2 吊装方案前期确定的原则Principle of Hoisting Scheme Confirmed on the Early Stage104.3吊装准备 Preparation of Hoisting114.4主吊吊车的站位设计 Design of the Posit
3、ion of the Main Crane124.5大型设备吊装主要参数及主要设备的吊装工艺方法 Main Parameter of Large-scale Equipment Hoisting and Hoisting Craft of Main Equipments134.6 吊装机具的运输 Transportaion of Hoisting Equipments164.7设备的卸车及二次倒运Unloading and Secondary Transportation of Equipments164.8吊装工具及附件 Hoisting Tools and Accessories17第5章
4、 大型设备吊装计算及校核calculationg and checking of large-scale hoisting equipments195.1尿素塔(R06101)的吊装 Hoisting of urea tower R06101195.2氨合成塔(R04501)的吊装 Hoisting of ammonia synthesis tower (R04501)235.3真空预浓缩分离器(S06104)的吊装Hoisting of vacuum pre-concentration separator (S06104)285.4其他设备吊装 Other equipments hoisti
5、ng315.5吊装用工装及校核 Lifting with the tooling and checking32第6章 起重吊装的指挥和吊装工艺岗位的分工direction of hoisting and division work of hoisting craft366.1起重吊装的指挥协调工作Direction and Coordination Work of Hoisting366.2吊装工艺岗位的分工 Division Work of Hoisting Craft37第7章 吊装安全保证体系及措施SYSTEM AND MEASURES OF HOISTIN SAFETY397.1安全目
6、标Safety Target397.2 建立吊装安全保证体系 Establishing System of Hoisting Safety397.3吊装安全措施和要求 Measures and Requirements of Hoisting Safety40第8章 文明施工、环境保护措施MESSURES OF CIVIL CONSTRUCTION AND ENVIRONMENTAL PROTECTION40第9章 主要机具设备与工装MAIN EQUIPMENTS AND TOOLING44第10章 施工进度计划及劳动力计划安排SCHEDULED PLAN OF CONSTRUCTION AN
7、D ARRANGEMENT OF LABOR46第11章 附件:大型设备吊装总平面图ATTACHMENT: GENERAL LAYOUT OF LARGE-SCALE EQUIPMENTS HOISTING46第1章 工程情况 protect introduction1.1工程概况及编制说明 General Situation and Information越南金瓯化肥项目是越南当地单套年产量最大的化肥项目。EPC总承包商为中国五环工程有限公司,工程地点在越南金瓯省金瓯市幽明县。The Chemical Fertilizer Project in Ca Mau Vietnam is the V
8、ietnams largest single set of annual fertilizer project. The EPC general contractor is the China Wuhuan Engineering Co., Ltd. The site of project is in Ca Mau City Ca Mau Province Vitenam.本项目中最大的生产单位工程为合成氨、尿素、造粒和尿素储运等工序,大型设备主要集中在合成氨、尿素,共有30台,其中氨合成塔、尿素塔、尿素装置内的其他高压容器为吊装工程的重点。吊装前地基的处理尤为重要。The largest p
9、roduction units in this project are ammonia synthesis, urea, granulation and urea storage and transportation, etc. Large-scale equipments are focused on ammonia synthesis and urea, a total of 30 sets. And ammonia synthesis tower, tower of urea and other high-pressure vessels in urea devices are the
10、focuses of hoisting work. Lifting pre-treatment of the foundation is particularly important.由于本次招标文件所提供的技术资料不尽详细,因此我公司将根据同类的施工经验、技术参数的基础上进行了方案的编制,如有不妥之处,待施工图纸和相关技术资料完备后,再进行补充和完善。吊装方案的编制从整个项目安装整体考虑。Because of the provided technical information in this tender document is not in detail exactly, our com
11、pany wrote the scheme based on similar construction experience and technical parameters. Any wrong with that, we will complete and improve it further after supplementing the construction drawings and related technical information. The hoisting scheme is from the overall consideration of the entire p
12、roject to install.1.2本装置工程范围内设备概况 Condition of Facilities 本项目各种容器、塔器、换热器、分离器及储罐达数百台。其中超限设备达30台之多,主要有以下关键设备(其他部分散装设备重量待定): The various containers, towers, heat exchangers, separators and tanks of the project are up to hundreds. Transfinite equipments are as many as 30 sets. The following are the key
13、equipments (Other parts of the weight of loose equipment to be determined):(1) 氨合成塔(R04501)是本装置单体最重的设备,设备直径2800mm,立式,上下切线之间高度22400mm,重量407.7吨,安装标高为6.00m。吊装作业区域较小。The Ammonia Synthesis Converter(R04501)is the heaviest single unit of equipment. Its diameter is 2800mm, vertical. The height between the
14、upper and lower tangent is 22400mm, and the weight is 407.7 tons. The absolute elevation of installation is 6.00m. The region of lifting operations is small.(2) 尿素塔(R06101)是尿素装置单体高度最高的设备,设备直径为2250mm,高度达43000mm,重量为230吨(不包括内件及外部平台), 安装标高为3.7m。The Urea Synthesis Converter(R06101)is the highest single u
15、rea plant equipment. Its diameter is 2250mm, height of up to 43000mm, weight 230 tons (not including the inner parts and the external platform), and the absolute elevation of installation is 3.7m.(3) 二氧化碳吸收塔(C04302)是本装置最大超限设备之一,设备直径为4360* mm,高度达39530mm,重量为252.1吨(不包括内件及外部平台), 安装标高为0.30m。The Carbon Di
16、oxide Absorption tower(C04302)is one of the largest transfinite Equipment units. Its diameter is 4360 * mm, height of up to 39530mm, weight 252.1 tons (not including the inner parts and external platforms), and he absolute elevation of installation is 0.30m.(4) 汽轮机冷凝器(E04401) 为本装置最大的卧式设备之一, 外形尺寸为130
17、0032004350,重量为85吨(包括内件) , 安装于压缩机主机下部,吊装就位难度较大。The Steam Turbine Condenser (E04401) is one of the largest horizontal devices. The overall dimensions is 13000 3200 4350, weighs 85 tons (including the inner parts), installed in the lower part of the host compressors. It is more difficult to be installa
18、ted.(5) 二段转化炉(R04302),为本装置最关键设备之一,外形尺寸为3500*10200重量为173吨。转化炉配套的冷凝器及过热器较多,重量都在40吨以上,最重达180吨,设备布置较集中,吊装难度较高。The Sec-Reformer (R04302) is one of the most critical equipments. The overall dimensions is 350010200, weighs of 173 tons. The quantity of the condenser and superheater of the conversion furnace
19、 supporting is more. The weight is more than 40 tons and the max-weight is up to 180 tons. The equipment layout is more focused and the lifting is more difficult.(6) 尿素工序的高压设备:此处设备布置的较密集,多数设备支撑楼层之间,且大部分为联体设备,设备总长度较大,多数需从楼层顶部,从吊装孔吊入,作业难度大。The high-pressure urea process equipment: Equipment layout her
20、e is more intensive. Many of the equipments are between the floor supports, and most of them are conjoined equipments. The total length of them is much longer. Many of the equipments need to be lifted from the top of the floors, from the lifting crane into the hole, operation difficult.(7) 1#废热锅炉,外形
21、尺寸为2324*20600 mm,重量为130吨。The external dimensions of 1 # waste heat boiler is 2324 * 20600 mm, weight 130 tons.第2章 编制依据 basis of compilation2.1大型设备吊装工程工艺标准 SHJ515-90 Large Equipment Hoisting Engineering Process Standards2.2化工工程建设起重规范 HGJ20183Chemical Engineering Construction Crane Specification2.3石油化
22、工施工安全技术规程 SH3505-1999Petrochemical Construction Safety Technical Regulation2.4现场施工平面布置图General Layout for Construction Site2.5装置设备布置图 Equipment Arrangement Drawing of the Plant2.6公司吊装技术装备及人员技术状况 The State of Companys Technical Equipment and Personnel Lifting Technology2.7起重工操作规程 (SYB411280)Crane Wor
23、kers Operating Procedures2.8 LR1750型750/400吨及SCC1500型150吨级履带式起重机性能表LR1750-type 750/400 tons and SCC1500-type 150-ton crawler cranes Performance Table2.9中国化学工程第十四建设有限公司的有关标准和制度Relevant Standards and Systems of CNCEC No.14 Co., Ltd.第3章 吊装方案确定及吊车选型、来源 confirming of hoisting scheme and the type and sour
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 大件 设备 吊装 施工 方案
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内