1、解读排水管道工程施工质量管理重点及措施中英文Interpretation of drainage pipeline construction quality management focus and measures从施工准备阶段、管道施工阶段、管线安装、检查井施工以及土方回填和闭水试验等方面论述了市政给排水管道工程施工质量管理重点及措施。From the aspects of the construction preparation stage, construction stage, pipeline installation, pipeline inspection well const
2、ruction and earthwork backfilling and closed water test of municipal water supply and drainage engineering construction quality management focus and measures. 一、 施工准备阶段质量控制Quality control, construction preparation stage(一)公共设施保护? 管道沟槽施工应根据土质情况采用支撑以免造成滑坡、塌方,若施工遇到建构筑物基础或电杆、灯杆等应制定防止下沉或变形措施后方可施工,一般应采用钢板
3、桩加固方法;施工地区地下水量丰富则在管道施工过程中往往需要排水,应制定合理措施以保证地面不发生过大沉降而影响周围建构筑物使用安全;在埋有高压线地区内开挖时要求挖掘机不能在其正上方开挖,必要时采用人工开挖;开挖过程中遇到地下管线和各种构筑物应尽量迁移,若不能迁移应人工开挖使其外露之后采取吊托等加固措施。( a ) public facilities protection? Pipeline trench construction should be based on soil conditions with support so as to avoid landslide, collapse,
4、if in the construction of building foundation or pole, a lamp post should be developed to prevent sinking or deformation measures before the construction, should generally be used for steel sheet pile reinforcement method; construction area, the underground water is abundant in the pipeline construc
5、tion process often need to drain, should make reasonable measures to ensure that the ground is not too large settlement of surrounding buildings safe use; buried in a high-voltage wire area excavation excavator is not in its just above the excavation, when necessary, using artificial excavation; exc
6、avation encountered in the process of underground pipelines and structures should as far as possible migration, if you cannot transfer should be excavated after the exposure to take reinforcement measures such as hanging bracket. (二)道路拆除与恢复? 市政给排水管道施工必然涉及到一定路面的拆除与恢复工作,为了能够保证施工安全及路基质量,在道路开挖前应根据施工图纸计算
7、开口宽度,用白漆标出开挖线之后用切割机将路面切断,用挖掘机对破碎的混凝土路面及碎石等垫层进行开挖并合理堆放以备后用,管路施工完成后的沟槽回填工作直接影响路面的质量及使用功能,尤其是在高原地区更应注重沟槽回填质量,一般对回填土或砂采用夯实或灌水密实,之后采用压路机分层碾压,回填应分层回填及夯实,并应控制每层回填厚度不超过25cm,夯实后采用核子密度仪测量密实度,待其压实率达到95%以上后方可进行下道工序施工。( two ) the road for removal and recovery of municipal water supply and drainage pipeline const
8、ruction? Must involve the removal and recovery of pavement structure, in order to ensure the quality of construction safety and roadbed, in the road before excavation should be based on the construction drawings calculated opening width, with white paint mark the excavation line with cutting machine
9、 will cut off the pavement, concrete pavement and gravel such cushion broken excavation excavator and arrange for later use, the pipeline after the completion of construction of backfilling work directly affects the pavement quality and using function, especially in the plateau region should pay mor
10、e attention to the trench backfill quality, generally for the backfill soil or sand used to compact or dense after irrigation, the roller stratification rolling, backfill should be stratified backfill and compaction, and should control every layer filling thickness of not more than 25cm, nucleon den
11、sity instrument measuring compactness by tamped, the compaction rate reached 95% above the rear can undertake construction of next working procedure. 二、 管道施工Two, the pipeline construction(一) 沟槽开挖与支护? 开挖过程中应根据土壤类别及性质确定槽帮坡度,对于较深沟槽宜分层开挖,挖槽土方应合理安排堆放位置以防止塌方;根据槽底宽、槽深边坡坡度及层间留台宽度来确定开槽断面,根据管道结构宽度加两侧工作宽度确定槽底宽
12、度;雨季施工应在沟槽四周叠筑土埂,必要时在埂外开挖排水沟以防止雨水流槽内,必要时加设集水井用泵抽水来防止槽底泡水;开挖过程中随时对槽底进行高程检验,采用机械开挖时在槽底高程以上20cm应改换人工进行清挖以防止超挖,若遇超挖应采用碎石回填到设计高程或填土夯实,并保证其密实度不低于天然地基密实度。( a ) the trench excavation and support? In the process of excavation shall be determined according to the groove side slope soil type and character, for
13、 a deep trench should be stratified excavation, dredging earthwork shall be reasonably arranged stacked position to prevent collapse; according to the channel bottom width, the depth of the groove slope and interlayer in Taiwan width to determine the slotted section, according to the pipeline the wi
14、dth and the working width determined structure on both sides of the groove bottom width; construction of the rainy season should be in the groove around the stacking soil ridges, necessary drain ditches in the ridge outside to prevent rainwater groove, when necessary, add water pump to prevent the t
15、ank bottom water; excavation at any time in the process of the tank bottom elevation inspection, should be change the manual cleaning to prevent the overbreak in the groove bottom elevation above 20cm mechanical excavation is adopted, in case of overbreak shall adopt the gravel backfill to the desig
16、n elevation or soil compaction, and to ensure that the density of not less than the natural foundation compaction.(二) 检查井、截门井施工市政给排水检查井施工容易出现基础尺寸及高程偏差较大,井壁砌砖通缝、砂浆不密实、不饱满,抹灰面起鼓发裂等质量问题,因此在检查井及截门井施丁中应尽量避免带水浇筑垫层和基础,并要保证基础的几何尺寸和高程符合设计要求,并待垫层混凝土达到一定强度后方可砌砖施工;井壁砖砌筑应保证竖直度,不得有通缝,灰浆饱满,砖缝平整,抹面要压光,不能有空鼓、裂缝现象;污水
17、检查井雨水流槽高度应与主管内顶相平,下半部分是与主管半径相同的半圆弧,上半部分与两侧井墙平行,其宽度与主管管径相同,雨水流槽高度应与主管半径相平,流槽形状应为与主管半径相同的半圆弧;井内踏步若为灰口铸铁材质必须保证其安装牢固,污水井内踏步必须刷防锈漆,井盖安装时必须保证井圈座浆饱满,井盖与井圈配套,必要时采用重型井盖。( two ), the valve shaft construction inspection well in municipal water supply and drainage inspection well construction are basic size and
18、 height deviation, wall brick, mortar seam less dense, not full, plastering surface blistering crack and other quality problems, so in the inspection shaft and the valve pit construction should be avoided with water pouring cushion and basis, and to ensure the basic geometry and elevation shall comp