1、精选优质文档-倾情为你奉上Engineering supervision system in Chinas Engineering construction in the positionWith the dominance of Chinas socialist market economy, the determination of the project supervision system in Chinas highway construction is gradually becoming more mature. Talking about the project in the
2、country, people always focus on project quality side, it seems that the focus of the task of supervision is to protect the quality of projects, in fact, it is very comprehensive, according to FIDIC provisions in the project construction, project quality, of course, crucial, but only to protect the p
3、roject supervision of the three objectives (quality, duration, cost), one of these three goals are interrelated and influence, from different angles to protect the owners of the project efficiency. Of which cost control is also very important to the management aspect of this work, good or bad, is di
4、rectly related to whether the quality of the project can achieve the desired goals, and whether the progress can be completed on time.First, the design phase of the design phase of SupervisionThe introduction of engineering supervision, determine a reasonable design, mature technology, reduce the co
5、nstruction phase of major design changes and program changes to occur, the effective cost control will play a certain role. Experts say: If the project supervision involved in the design stage, then, and can be ruled out, to correct 80% of the errors, but to the construction stage to be involved in
6、supervision of works, at best, can only save 20% of the investment. According to the information briefing, a German university laboratory building, the original design is three and a basement, the project management company to meet the commissions space requirements and functional conditions, propos
7、ed to increase the layer to shorten the two-axis then the abolition of the basement. But also reduces the flow of people to evacuate distance (to the required standards), so modified after the design is not only reduced costs, has also been improved functionality, access to credit and praise of the
8、municipal government. At present, China for engineering supervision at the design stage to introduce the practice is still rare, we should learn from foreign countries mature and developed system, the development of relevant systems, and standardize the market. Advocates strengthening the design pha
9、se of the supervision, control and management from a cost sense, ex ante control, prevention, which is scientific and reasonable. Therefore, to enhance the design stage to control the cost of supervision is necessary. Second, the construction phase of the SupervisionAs we all know, domestic and inte
10、rnational construction markets are the dominant owners of a buyers market, the construction of competition among enterprises is very cruel. In order to bid, bidders tend to almost zero profits or even below cost bids, but the owners often use low-cost way of winning. While the bidders promised to ab
11、ide by the provisions of contract documents, but once the contract, they refused to the end there is no profit or losing money, so, often with inferior materials, do not follow standard construction, bribery, or layers of subcontracting means to profit. This time, the absence of an effective supervi
12、sion mechanism, the victims can only be the owners.From the process, process control the cost of supervision of supervision engineer should not only be concerned with whether the works to meet the required quality goals, he should be the focus all the objectives of the project design, in the actual
13、operation, the contractor engaged in construction prior to permanent per days must be carried out by a variety of inspection, testing, content or face a new job, workload, construction methods, measures, materials testing and sub-contracting part of the work or works submitted to the approval of sup
14、ervisory engineer. The contractor can only work within the approved, without approval or beyond the approved engineers work can not be recognized. At the same time is also an engineer approved the contractor to obtain a basis for progress payments. Engineers, contractors, any non-approved inputs (ma
15、npower, materials, equipment) will not receive compensation, meaning that there is no engineers approval, the contractor shall not proceed to the next one process or face, shall not be put into construction materials, use, shall not subcontract part of the project or work.Supervision and Control of
16、project cost from the cost of the engineering supervision of the project cost management goal is to project to be completed within the contract price can not be there far exceed estimates. Supervision of the strict monitoring of the project, due to the contractor causes the possibility of super-budg
17、et is almost zero. This is because: Engineering Super-budget, no more than two kinds of reasons, the first rise in unit labor and materials, first, during the construction works increased volume, while the contractors bid is a commitment to its binding, and the contractor not entitled to their own w
18、orks to increase the amount of the project, even if there are engineers, required the contractor to increase the input of resources to protect the project design goals, the contractor has no right to be compensated, therefore, because in the tender document, the contractor can protect a large number