1、 Sinohydro Corporation Limited ENVIRONMENTAL MANAGEMENT PLAN On International Transit Corridor Project“Western Europe Western China”Reconstruction of the Road-2 Khorgos-Almaty-Shymkent Border of the Republic of Uzbekistan 593km-806km.(section 632km-674km)SKO 2013 Reconstruction of the Road A-2 Khorg
2、os-Almaty-Shymken-Border of the Republic of Uzbekistan/593km-806km(section 632-km-674km)Contract SWRP-632-674-ICB(W)002/2013 _ 2 62 Content 1.Introduction 1.1 Information on the Project 1.2 Environmental Management Plan 2.Guiding principles of EMP 2.1 Methodology 3.Mitigation Measures 4.Monitoring M
3、echanism 4.1 Monitoring schedule and performance indicator 5.Public awareness activities 6.Budget estimates 7.The institutional basis for implementation of the Plan for monitoring and environmental impact reduction 8.Managing the environmental impact of the project 9.Resettlement Action Plan 10.Land
4、scaping and tree planting 11.Plan for responding to emergencies 12.Reporting on the implementation of EMP and EPP 13.Conclusion Reconstruction of the Road A-2 Khorgos-Almaty-Shymken-Border of the Republic of Uzbekistan/593km-806km(section 632-km-674km)Contract SWRP-632-674-ICB(W)002/2013 _ 3 62 Appe
5、ndix Appendix-1:Environmental Management Plan Appendix-2:Environmental Monitoring Program Appendix-3:Control schedule for Emissions into the Air Appendix-4:Control schedule for Quality of Wastewater Appendix-5:Control schedule for Standards of Physical Factors on test points Appendix-6:Schedule of I
6、nternal Inspections Appendix-7:A Schematic Drawing of Section 632-674 km-2 Khorgos-Almaty-Shymkent-Border of the Republic of Uzbekistan.Appendix-8:Scheme of shift camp Appendix-9:A Brief Plan of Monitoring and Environmental Impact Reduction Appendix-10:Additional Information Reconstruction of the Ro
7、ad A-2 Khorgos-Almaty-Shymken-Border of the Republic of Uzbekistan/593km-806km(section 632-km-674km)Contract SWRP-632-674-ICB(W)002/2013 _ 4 62 ABBREVIATIONS WB-World Bank BWC-Bad Weather Conditions CR-Construction Regulations E-Efficiency CIS-The Commonwealth of Independent States CBP-Concrete batc
8、hing plant CP-Check point CFR-Committee for Roads CSP-Crushing and Screening Plant CCS-Construction Supervision Consultant E-Environment AEI-Assessment of Environmental Impacts PMEIR-Plan of Monitoring and Environmental Impact Reduction EP-Environment Protection EMP-Environment Monitoring Plan GS-Ga
9、s Station IEC-Industrial Environmental Control PM-Production Monitoring.-Kazakhstan Tenge(Currency of RK)MoE-Ministry of Environment MT&C-Ministry of Transports and Communications MAC-Maximum allowable concentration MAW Maximum allowable emissions MAL-Maximum allowable level SD-Standard Documentatio
10、n OM-Operation and Maintenance P-Pollutants PAAM-Point of Ambient air monitoring PMC-Project Management Consultant RK-The Republic of Kazakhstan SCA-Sanitary Control Area SRN-Sanitary Rules and Norms GOST-GOST State Standard SRPCLR&LM-State Research and Production Center for Land Resources and Land
11、Management STA-State Territorial Administration DSW-Domestic Solid Wastes Reconstruction of the Road A-2 Khorgos-Almaty-Shymken-Border of the Republic of Uzbekistan/593km-806km(section 632-km-674km)Contract SWRP-632-674-ICB(W)002/2013 _ 5 62 Introduction 1.1.Information on the Project 1.The project
12、is devoted to the implementation of large-scale international project-the construction of the road Western Europe-Western China.Overall length of the road is 8500km.This highway starts in China from the port Lyangun and goes to the territory of the Russian Federation.This road covers 2700 km on the
13、territory of the Republic of Kazakhstan.Considered by the project the construction site is placed in Tulkubas and Sairam districts.Highway Khorgos-Almaty-Shymkent the border of the Republic of Uzbekistan runs through the territory of South Kazakhstan oblast.Road section km632-km674 is new and locate
14、d in Tulkubas district.2.In order to implement the project Sinohydro Corporation Limited was chosen as the Contractor for the execution of road construction works on section 632-674km.The new road will provide road transport links of Asian countries of CIS and northern regions of Kazakhstan with the
15、 northern regions of Kazakhstan and Russia.This road is one of the sections of the international transit corridor“Western Europe-Western China”as well as intra-regional linkages,which confirms the exceptional economic importance of the performed works.The length of the section is-42 km 1.2.Environme
16、ntal Management Plan 3.WBs security strategy principles(FSR,2009)asserts that the Environmental Management Plan(EMP),which aims to develop measures to mitigate and manage possible consequences that need to be carried out during the project in order to:avoid,minimize,mitigate or compensate for advers
17、e impact on the environment(in descending order of priority).4.In this regard,measures have been taken to prevent and reduce the negative environmental impacts that have been taken into account in project design and additional recommendations to prevent in future or reduce the effects,given in AEI,a
18、s reflected in the proposed EMP.5.In FSR it is said that with regard to mitigation and compensation in the EMP it should consider“the following key components:mitigation,monitoring,application and performance indicators”.2.Guiding principles of EMP 2.1 Methodology 5.The Plan of Monitoring and Enviro
19、nmental Impact Reduction is prepared for all types of revealed environmental impacts before construction,operation and monitoring activities.Reconstruction of the Road A-2 Khorgos-Almaty-Shymken-Border of the Republic of Uzbekistan/593km-806km(section 632-km-674km)Contract SWRP-632-674-ICB(W)002/201
20、3 _ 6 62 Methodology consists of the following steps:defining measures of mitigation and environment protection for each type of project activities and environmental component;ways to reduction,compensation and improvement measures for each of the reveled impacts and risks;development of a monitorin
21、g mechanism for the proposed mitigation measures;assessment of budgetary requirements for mitigation of consequences of project implementation and for monitoring measures;defining the responsibilities of different agencies involved in the project implementation and monitoring of measures to mitigate
22、 the effects of construction.6.The Plan of Monitoring and Environmental Impact Reduction has been prepared in accordance with the above criteria and presented in Appendix 1 and Appendix 2,each of the components is reviewed in the following sections.The Plan of Monitoring and Environmental Impact Red
23、uction is included in all bidding documents for the project and will be a part of the contract for civil works.Strict implementation of the Plan and following adequate practices and building standards by the project management will significantly reduce the negative impact of the project.3.Mitigation
24、 Measures 7.This section covers the principles,procedures and mitigation measures that are necessary to ensure the most appropriate environmental mitigation and improvement of plans that are applicable at different stages of the project.In order to avoid and minimize consequences resulting from the
25、project,measures/management plans are based on the appropriate technology design,improvement or adjustment.This plan has been recommended for the determination of actions to prevent and minimize/control the consequences arising from the various phases of the project,i.e.prior to construction,during