1、ConstructionStatementforPVC 真空预压发处理软土地基施工方案 (as per 22.1.7 of section 1.0)1.Source of borrows pit indicating the location and quantity We have license given by Vietnam authority to exploit a quantity of 8,400,000 m3 in Nha Be river and the location is in Nhon Trach district,Dong Nai province.2.Physi
2、cal proprieties of proposed fill material The sampling test of sand proposed to use is carried out according to AASHTO M45-89,C144-88(see Test Result of Analyses of Sand component).The specific weight of the sand is 2.634,unit weight 1.5g/cm3,organic content 2.87%and modules 2.52.3.Proposed method o
3、f statement and monitoring devices 3.1 Method statement According to the geotechnical report of the site,the void ratio of the soft silty clay(e)is 2.377,and the permeability coefficient (Kv)5.5*10-7cm/s.If we adopt“wick drains and pre-loading”method to reach a soil bearing capacity of 50Kpa,75Kpa,1
4、00Kpa under the sites conditions,the consolidation period would be far beyond the proposed work period.For the purpose of reducing the consolidation period of foundation soil an overload should be added,though the loading would be 7.30m high to fulfill the bearing capacity of 100Kpa.Obviously,this t
5、echnique would bear a tremendous number of loading and unloading,which would also mean a high construction cost.The stability of side slope would also be difficult to monitor.Based on our previous experience of soft soil improvement of China coastal and Hiep Phuoc Power Plant in Nha Be,15km Southeas
6、t of Hochiminh City,the pre-loading method is appropriate only for general area.In process area we suggest to adopted the following method(details see drawings“Proposed Process Area Plan”and“Proposed Process Area Zone”in page 6,7):f=50 Kpa,vacuum precompression method;f=75 Kpa,vacuum precompression
7、and filling water(2.0m)on membrane method;f=100 Kpa,vacuum precompression compound with loading method.The hydraulic filling of sea sand should be adopted under the elevation+2.80,which is specified in the tender documents.But based on our site investigation report,we propose to use sweet water sand
8、 instead of sea sand for these following reasons:(1)Fine grade and high mud content of the sea sand;(2)No local facilities available such as hydraulic filling mud absorption.The backfill material(sweet water sand)will be delivered by barges to the nearest dock and then carried by trucks to the site.
9、3.2 Monitoring devices According to the requirement of the tender documents,settlement gauge should be installed at 50mx50m grid and be measured by leveling instruments.In accordance with the requirement of the owner,the static penetration test should be carried out at the 10 specified points and th
10、e penetration instruments should be buried through the whole depth of the compressible soil layers.The compaction test of filling materials in site should be carried out with heavy compactor.4.Design philosophy to achieve the requirement of the specification for soil improvement 4.1 philosophy of va
11、cuum precompression method The vacuum precompression method is used to consolidate foundation soil.This method consists in laying on the surface of foundation soil a sand bed,and in installing a drainage system with wick drains.The sand bed drain line is buried and connected with vacuum system to fo
12、rm an air exhaust and a dewatering system.A set of airtight seal membranes is laid on the surface of the sand bed with its edge buried in soil.Thus,a negative pressure area within sand bed and foundation soil can be formed from air exhaust and dewaturing pumps.The vacuum method can reach a soil bear
13、ing capacity of 80KPa.Under the vacuum condition,soil is in the state of consolidating and pore water is discharged from soil under the pressure difference.The consolidation is completed when pressure of soil to be consolidated is reaching the same pressure of the drainage system.The philosophy of v
14、acuum recompression method is that under the pressure difference (Pa-Pv),soil can be consolidated;Pa indicates atmospheric pressure and Pv indicates air pressure in the sand bed and the vertical drains.In the calculation of consolidation of the foundation soil,the RENDULIC-TERZAGE Theory and BICOT T
15、heory of Consolidation can be adopted which are the same of those adopted in loading recompression method.The drop of the ground water table may also accelerate the consolidation of foundation soil beside the pressure difference.The effective stress in the soil increases successively during the peri
16、od of consolidation of the foundation soil with vacuum recompression method.The horizontal displacement of the soil is toward the center of the consolidation area from the beginning of the period of vacuum recompression,which is different from the loading recompression method.So the stability of the
17、 foundation soil will not become a problem,and the required vacuum capacity can immediately be obtained and consequently,the period of vacuum recompression can be curtailed.Details is shown in drawings“Design Philosophy for Vacuum Precompression“and “Flow Diagram of Vacuum Precompression Method”in p
18、age 8,9.Regarding the short work period of this project,the vacuum compound with loading recompression method is used in the process area where the required bearing capacity of the foundation soil is 100 Kpa.It has been proved from the theoretical calculation and our previous experience that the eff
19、ects of vacuum and loading recompression methods on the consolidation can be coaxed.For this purpose,a soil capacity of 150 Kpa had been obtained in one of our previous project in the turbine house of Hiep Phuoc power plant located at Nha Be district in Hochiminh city.During the vacuum process and u
20、nder the pressure difference(Pa Pv),the pore water permeates into the vertical drains and the consolidation occurs.On the other hand,when using pre-loading method,the air pressure raises to Pp and the consolidation occurs under the pressure difference(Pp Pa).Therefore,by using the vacuum compound wi
21、th pre-loading method,the pressure can be increased to(Pp PV)and the consolidation effect would be improved as a result.The process of vacuum compound with pre-loading method is shown in drawing“The Process drawing of Vacuum Precompression combined with Loading Method”in page 10.4.2 Monitoring metho
22、d The loading height and loading period of each step of general area is mainly controlled by the stability of the foundation soil.The settlement monitoring should be mainly concerned in this area.Because the vacuum precompression method will not cause a soil stability problem,the site measurements h
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ConstructionStatementforPVC 真空 预压 处理 土地 施工 方案
限制150内