1、长 春 工 业 大 学 毕业设计(论文)外文资料翻译 学 院 电气与电子工程学院 专业班级 110310 指导教师 姓 名 外文出处 International journal of electrical power and energy systems 2015 年 5 月 10 日 General Requirements to Construction of Substation Carpentier J;Optimal Power Flows International journal of electrical power and energy systems,EI SCI 2011
2、 Feb Substations are a vital element in a power supply system of industrial enterprises They serve to receive,convert and distribute electric energy.Depending on power and purpose,the substations are divided into central distribution substations for a voltage of 110-500kV;main step-down substations
3、for110-220/6-10-35kV;deep entrance substations for 110-330/6-10kV;distribution substations for 6-10kV;shop transformer substations for 6-10/0.38-0.66kV.At the main step-down substations,the energy received from the power source is transformed from 110-220kV usually to 6-10kV(sometimes 35kV)which is
4、distributed among substations of the enterprise and is fed to high-voltage services.Central distribution substations receive energy from power systems and distribute it(without or with partial transformation)via aerial and cable lines of deep entrances at a voltage of 110-220kV over the enterprise t
5、erritory.Central distribution substation differs from the main distribution substation in a higher power and in that bulk of its power is at a voltage of 110-220kV;it features simplified switching circuits at primary voltage;it is fed from the power to an individual object or region.Low-and medium-p
6、ower shop substations transform energy from 6-10kV to a secondary voltage of 380/220 or 660/380.Step-up transformer substations are used at power plants for transformation of energy produced by the generators to a higher voltage which decreases losses at a long-distance transmission.Converter substa
7、tions are intended to convert AC to DC(sometimes vice versa)and to convert energy of one frequency to another.Converter substations with semiconductor rectifiers are convert energy of one frequency to another.Converter substations with semiconductor rectifiers are most economic.Distribution substati
8、ons for 6-10kV are fed primarily from main distribution substations(sometimes from central distribution substations).With a system of dividing substations for 110-220kV,the functions of a switch-gear are accomplished by switch-gears for 6-10kV at deep entrance substations.Depending on location of su
9、bstations their switch-gear may be outdoor or indoor.The feed and output lines at 6-10kV substations are mainly of the cable type.at 35-220kV substations of the aerial type.When erecting and wiring the substations,major attention is given to reliable and economic power supply of a given production.S
10、ubstations are erected by industrial methods with the use of large blocks and assemblies prepared at the site shops of electric engineering organizations and factories of electrical engineering industry.Substations are usually designed for operation without continuous attendance of the duty personne
11、l but with the use of elementary automatic and signaling devices.When constructing the structural part of a substation.it is advisable to use light-weight industrial structures and elements(panels,floors,etc.)made of bent sections.These elements are pre-made outside the erection zone and are only as
12、sembled at site.This considerably cuts the terms and cost of construction.Basic circuitry concepts of substations are chosen when designing a power supply system of the enterprise.Substations feature primary voltage entrances.transformers and output cable lines or current conductors of secondary vol
13、tage.Substations are mounted from equipment and elements described below.The number of possible combinations of equipment and elements is very great.When elaborating a substation circuitry,it is necessary to strive for maximum simplification and minimizing the number of switching devices.Such substa
14、tions are more reliable and economic.Circuitry is simplified by using automatic enclosure or automatic change over to reserve facility which allows rapid and faultless redundancy of individual elements and using equipment.When designing transformer substations of industrial enterprises for all volta
15、ges,the following basic considerations are taken into account:1.Preferable employment of a single-bus system with using two-bus systems only to ensure a reliable and economic power supply;2.Wide use of unitized constructions and bustles substations;3.Substantiated employment of automatics and teleme
16、try;if the substation design does not envisage the use of automatics or telemetry,the circuitry is so arranged as to allow for adding such equipment in future without excessive investments and re-work.4.Use of simple and cheap devices-isolating switches,short-circuiting switches,load-breaking isolat
17、ors,fuses,with due regard for their switching capacity may drastically cut the need for expensive and critical oil,vacuum,solenoid and air switches.Substation and switch-gear circuitries are so made that using the equipment of each production line is fed from individual transformers,assemblies,the l
18、ines to allow their disconnection simultaneously with mechanisms without disrupting operation of adjacent production flows.When elaborating circuitry of a substation,the most vital task is to properly choose and arrange switching devices(switches,isolators,current limiters,arresters,high-voltage fus
19、es).The decision depends on the purpose,power and significance of the substation.Power System Substation is an important and indispensable component of the power it assumed the task of conversion and distribution of grid security and the economy play a decisive role in running is to contact the user
20、s power plants and intermediate links.With economic development,expanding grid capacity,reliability of operation of the power grid is getting higher and higher requirements.Development of science and technology,intelligent switches,photoelectric current and voltage transformer,a run-line state detec
21、tion,training simulation Substation Operation matures,such as high-tech,as well as fiber-optic technology,computer high-speed network system in the development of real-time applications,bound to the existing substation automation technology have a profound impact,all-digital substation automation sy
22、stem development trend.Power system is operated by the production,transmission,distribution and consumption of a variety of power linked to the composition of electrical equipment.As a result of a large number of powers can not be stored,we must ensure that the production of electricity and energy b
23、alance.With the scientific and technological advances in the technological development of our country has reached a certain level.Intelligent switches,photoelectric current and voltage transformer,a run-line state detection,training simulation Substation Operation matures,such as high-tech,as well a
24、s fiber-optic technology,computer high-speed network system in the development of real-time applications,significantly increase the transformation degree of automation.Design of our substation cable programs tend to be simple,many of the recent domestic new 220 k V substation and 110kV voltage level
25、s of wiring without the use of dual-bus bypass bus.The use of GIS,the priority sub-bus single wire.Terminal Substation,the line as far as possible,such as transformer unit wiring.A large number of the introduction of new technology,transformer substation rising level of electrical equipment,power di