《监理年终参考总结英文自我评价》.doc
《《监理年终参考总结英文自我评价》.doc》由会员分享,可在线阅读,更多相关《《监理年终参考总结英文自我评价》.doc(9页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、此资料由网络收集而来,如有侵权请告知上传者立即删除。资料共分享,我们负责传递知识。监理年终总结英文自我评价 监理工作它不同于承建商的直接生产活动,也不同于建设单位的直接投资活动,它不向建设单位承包工程,不参与承包单位的利益分成,它获得的是技术服务性的报酬。下面是由小编分享的英文自我评价,希望对你有用。监理年终总结英文自我评价篇一2020 is coming to an end, the new year is nearing. Xx project from mid-April 2020 formal construction to the present, of which the tota
2、l number of steel pipe gantry workshop area of 9820 square meters, reserved warehouse door frame steel structure with a total area of 3840 square meters, the main body in early June 2020, 2020 In mid-October across the board into use, the results with the company's leadership and the project dep
3、artment of the hard work of all employees are inseparable, but also our design department, Department of Materials, Engineering and other companies from top to bottom the result of unity and cooperation. In the whole construction process of the project, also deeply aware of the importance of teamwor
4、k, some of their own shortcomings, team harmony, etc. are the key factors affecting the smooth progress of the project. To this end, now the fourth quarter engineering work summarized as follows:First, the schedule of progressIn the early stage of construction, under the consistent efforts of the wh
5、ole company, the whole works well and the project has a good trend from safety, quality and progress. However, the processing of raw materials is an important link. , The audit of its materials related to the acceptance of the project safety, progress and other major links. (Materials often problems
6、: 1, the material does not match the original drawings. Refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the Do not
7、need to do a good job guarantee .2, raw materials approach the corresponding information is not perfect .It is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .3, good
8、drawings review, the original design of common sense I would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, The meeting will be responsible for t
9、he corresponding person in charge of a "pre-Conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, Responsibilities, unity team strength.In the found
10、ation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, Party, weather and other factors to do the appropriate adjustments, reasona
11、ble arrangements for the construction schedule, Effective measures to catch up with the progress of the system. In this, I also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the
12、work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , The corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future wo
13、rk there are many places need to learn to grow.Second, the construction safetySite construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. We can realize the social attitude of "people-oriented, safety first"
14、;, and can realize the importance and necessity of safety facilities, safety education and prevention. In the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, xx rese
15、rved warehouse project midway construction workers in the process of fall, as the scene responsible for people I can not Shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight fo
16、r the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this I also reflect on their own deep, In the future construction site safety management work, always do a good job "Sambo, four, five edge", the construction of civilization, the
17、 safety education of workers, investigation of security risks as the focus of the work and the development of specific security Implementation of programs and measures for the smooth conduct of escort the project.Third, the construction qualityA hundred years, quality-oriented. Xx project, with the
18、already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks . . to the party's production has caused some impact, but also for the company The unnecessary loss, which I am deeply guilty, has been working to repair. In view of the
19、above, I think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in
20、the construction process quality defects The implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. In strict accordance with national norms, standards and household acceptance criteria for the construction, the qual
21、ity of the implementation.Fourth, cost control and project advance payment1. Cost control1) material control: the construction of the early preparation of a detailed construction budget and material consumption plan, in the construction process according to site conditions changes, design changes, n
22、egotiation and other factors gradually improve. The construction team with the task list to receive materials, materials, out of the library has a detailed record. To ensure the normal supply of materials in the circumstances, to eliminate waste.2) the use of new technology, reduce labor, improve ef
23、ficiency to increase efficiency (combined with the actual situation on the site may be).2. Project advance paymentAnd xxx Group Co., Ltd. signed a construction contract in the terms of the project advances, the construction unit there arrears and delays, which makes the smooth progress of the projec
24、t have also been affected, in view of this issue on-site managers to fully do a good job under the premise of engineering work to ensure, Party A to do a good job when the communication, to ensure that the payment of funds for the company to do the most effective back-up guarantee.With the contract
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 监理年终参考总结英文自我评价 监理 年终 参考 总结 英文 自我 评价
限制150内