1、PROJECT PROCEDURE MANUALRevDateDescriptionPreparedCheckedProject ManagerClientDisclaimerThis document has been prepared on behalf of and for the exclusive use of GASAN, and is subject to and issued in accordance with the agreement between GASAN and SAMI. The information in this document may not be d
2、isclosed to, or used by any other party without SAMIs prior written consent.184. Hepingbei Street Shenyang, LN P.R.ChinaTel: +86-24-Fax: +86-24-Shenyang Aluminum & Magnesium Engineering & Research Institute Company Ltd.Table of Contents1EXECUTIVE SUMMARY11.1Staff Force Mobilization11.2Kick-off Meeti
3、ng11.3Project Status11.4Payment11.5Key Issues and Areas of Concern12TECHNICAL QUERY33ENGINEERING43.1General43.2Achiedved This Month43.3Planed Next Month44PRICE QUOTATION65PHASE II IMPLEMENTATION PLAN66OPEN BOOK ESTIMATE67CDRL6文档管理部分2 TYPES OF DOCUMENTATION2.1 Technical Documents of Project2.1.1 Proj
4、ect drawings2.1.2 Project technical documents2.1.3 Standardized documents2.1.4 External drawings and documents2.2 Non-technical Documents of Project2.2.1 Correspondence2.2.2 Management documents2.2.3 Commercial documents2.3 Procedure, Planning, Instructions and Statements of Projects3 PROJECT DOCUME
5、NT NUMBERING FORMAT3.1 Numbering FormatN NNNNNN NANN NN NNN NNNN NNN3.1PrefixProject NumberingSheet NumberSequential NumberFunctional GroupPlant Area and PackageDocument TypeN refers to numeric character and A refers to alpha.3.2 Document Numbering Elements Explanation3.2.1 Prefix and Project Number
6、l Alpha character u S = SAMIu E = External (Supplier-Contractor-External Consultant)u CAS = CHALIECOu Six numeric characters (NNNNNN),prepared by the Project Management Department,or same as the Project Number for the preliminary projecte.g. CAS1117 represents GASAN CPC Project3.2.2 Plant Area and P
7、ackage Numberl One alpha and three numeric characters (NANN) identified as part of plantu The first numeric character represents the Project Type, refer to Appendix Au The second alpha represents the area from the plant, refer to Appendix Bu The last two numeric characters are the Project Package, r
8、efer to Appendix Be.g. 3C01 means GPC Storage and Conveying and 3U10 means Domestic Sewage Lift Station3.2.3 Functional Groupl Two numeric characters, refer to Appendix Ce.g. 09 indicates carbon process discipline and 13 indicates layout discipline3.2.4 Document Typel Three numeric characters, refer
9、 to Appendix De.g. 001 indicates 3D model design and 203 indicates minutes of meeting3.2.5 Sequential Numberl Four numeric characters applied to drawings and documentsl By default the Document Number Generator (DNG) will start at 0001 and allocate each number in strict sequence. However, the gaps ar
10、e allowed in sequential numbers (e.g. drawings of a particular type can be numbered 0010, 0020, 0030 and etc.)3.2.6 Sheet Numberl Only used to drawings and not used for documents, three numeric characters applied to any single drawing sequential number with multiple sheets3.3 Project Document Number
11、ing ExamplesProject DocumentExampleProject DrawingsCAS1117-3C01-09-042-0001Project Drawings with Sheet NumberCAS1117-3C01-09-030-0001-001CAS1117-3C01-09-030-0001-002Project Technical DocumentsCAS1117-3S09-50-123-0001Minutes of MeetingCAS1117-3A00-00-030-00014 GASAN CPC PROJECT ELECTRONIC FILE NAMING
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Project Procedure Manual项目管理手册 Manual 项目 管理 手册
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内