临沂文化广场D楼塔吊施工方案.pdf
《临沂文化广场D楼塔吊施工方案.pdf》由会员分享,可在线阅读,更多相关《临沂文化广场D楼塔吊施工方案.pdf(8页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、relationship,establirelationship,establi sheshed equivalent relatid equivalent relati onshiponship 14,and subje14,and subje ct:act:applipplication problem(4)-scorecation problem(4)-score s and pers and percentage acentage applipplication problem reviewcation problem review contecontent overvient ove
2、rview answw answers scores,aers scores,andnd percentage applicatipercentage applicati onon problem of key is:accorproblem of key is:accor ding to meading to meaningning,(1)determine standard v,(1)determine standard v olume(units 1)(2)find associate volume rate corresponds to relatiolume(units 1)(2)f
3、ind associate volume rate corresponds to relationship,onship,TheThen inn in-line-line solsolution.Category fractiution.Category fracti on multion multiplicatiplication won wordord problproblem score Divisiem score Divisi on aon applipplications ecations engineeringineering prng problemoblem pr probl
4、oblem XV,aem XV,a subject:revisubject:review of the measurementew of the measurement of the amount of caof the amount of ca pacitpacity,measuremey,measurement and units of measurnt and units of measur ement of common units of measurement of common units of measur ement and their significaement and t
5、heir significa nce ince in rate 1,currency,len rate 1,currency,le ngth,arength,area,volumea,volume,unit,unit size,volsize,volume,weigume,weight and rate.(Omitted)2,commonly used time units and their relht and rate.(Omitted)2,commonly used time units and their relationshiationships.(Slightly)with a m
6、easurementps.(Slightly)with a measurementunits Zunits Zhijianhijian of of poly 1,and of method 2,and poly method 3,aof of poly 1,and of method 2,and poly method 3,andnd of method and poly method of relationship measurementof method and poly method of relationship measurementdistance of method 1,adis
7、tance of method 1,a nd tnd tool measurement 2,aool measurement 2,a nd end estimates 16,stimates 16,and subject:geand subject:ge ometry preliminary kometry preliminary k nowlenowledge(1)-lidge(1)-line ane and and angle review contengle review conte nt line,ant line,and segment,and Ray,and segment,and
8、 Ray,a nd verticalnd vertical,and parallel,a,and parallel,a nd and angle anglngle angle of classification(slightly)17,and subjee of classification(slightly)17,and subje ct:geometry prct:geometry pr eliminary knowleeliminary knowle dge(2)-plane gradge(2)-plane gra phiphics reviewcs review conteconten
9、t triangle,ant triangle,a nd end edges shapedges shaped,ad,and round,and fan axisymmetric graphind round,and fan axisymmetric graphi cs perimeter and arecs perimeter and are a coma combinatibination grapon graphics of area subjehics of area subje ct:Preliminary knowledge(3)-reviewct:Preliminary know
10、ledge(3)-reviewof soliof solid content categd content category 1-d shapeory 1-d shape s are divided ints are divided int o:cylio:cylinder ander andnd cone 2,columcone 2,colum n is divin is divided ided into:nto:cuboicuboid,square 3,d,square 3,cone conecone cone of the features of cuboids aof the fea
11、tures of cuboids a ndnd cubes relaticubes relationshiponship betweebetween characteristin characteristi cs of circs of circularcular cone is sligcone is slightly solihtly solid surfad surface area and volce area and vol ume 1,size 2,table.ume 1,size 2,table.和和塔 吊 施 工 方 案一、编制依据1。1 临沂图书馆综合楼岩土工程勘察报告;1.
12、2 建设单位下发的临沂市图书馆综合楼文化大厦建筑施工图纸;1.3 QTZ125G 塔式起重机安装使用说明书;1.4相关规范、规程要、技术求。二、工程概况2.1 临沂市文化广场工程位于新华路的西侧,红旗路的南侧。文化广场住宅楼部分由 C、D、E 三栋楼构成,位于整个建筑群的西侧。D 座楼位于三栋楼中间位置。地下室 2 层,地上共 33 层,建筑总高度 103。1 米。地上 1-3 层总高度为 10.4 米,4 层以上为标准层,层高 2。9 米。主楼基础筏板面标高9。48 米、裙房基础底板面标高-9.88 米;考虑基底岩石开挖难度且南侧主楼结构已经施工到 4 层,塔吊基底不再深挖,标高与裙房基底标
13、高相同,塔吊基础位于 D 楼北侧裙房内。2。2 地质情况:详见建设方提供临沂图书馆综合楼岩土工程勘察报告。三、塔吊选型及技术性能指标1、塔吊选型考虑目前施工进度需要,CD 楼必须同时进行主体施工,而 E 座楼未完成主体结构施工,E 座楼塔吊只能满足 DE 楼施工。因此考虑在 D 楼东北侧安装一台塔吊可确保 DC 两栋主楼同时进行主体结构施工(具体位置见附图),塔吊型号为 QTZ125 附墙式塔式起重机。由江苏张家港浮山建设机械有限公司生产的 QTZ125 塔式起重机为水平臂架、小车变幅、上回转自升式多用途塔机,其标准臂长 45m,加长臂可为 55m,最大起重重量为 10T,起重力矩为 125T
14、m,最大起重力矩为 148 Tm。无附着时独立高度达 50 米,附着后最大升高达 123m,其机械性能,起重特性,机构等详见说明书.三、塔基施工1、塔吊基础砼、配筋1.1 结合生产厂家的塔吊说明书要求及现场地基承载力,决定选用地面许用relationship,establirelationship,establi sheshed equivalent relatid equivalent relati onshiponship 14,and subje14,and subje ct:act:applipplication problem(4)-scorecation problem(4)-sc
15、ore s and pers and percentage acentage applipplication problem reviewcation problem review contecontent overvient overview answw answers scores,aers scores,andnd percentage applicatipercentage applicati onon problem of key is:accorproblem of key is:accor ding to meading to meaningning,(1)determine s
16、tandard v,(1)determine standard v olume(units 1)(2)find associate volume rate corresponds to relatiolume(units 1)(2)find associate volume rate corresponds to relationship,onship,TheThen inn in-line-line solsolution.Category fractiution.Category fracti on multion multiplicatiplication won wordord pro
17、blproblem score Divisiem score Divisi on aon applipplications ecations engineeringineering prng problem problem probloblem XV,aem XV,a subject:revisubject:revi ew of the measurementew of the measurement of the amount of caof the amount of ca pacitpacity,measuremey,measurement and units of measurnt a
18、nd units of measur ement of common units of measurement of common units of measur ement and their significaement and their significa nce ince in rate 1,currency,len rate 1,currency,le ngth,arength,area,voluma,volum,unit,unit size,volsize,volume,weigume,weight and rate.(Omitted)2,commonly used time u
19、nits and their relht and rate.(Omitted)2,commonly used time units and their relationshiationshi ps.(Slightly)with a measurementps.(Slightly)with a measurementunits Zunits Zhijianhijian of of poly 1,and of method 2,and poly method 3,aof of poly 1,and of method 2,and poly method 3,andnd of method and
20、poly method of relationship measurementof method and poly method of relationship measurementdistance of method 1,adistance of method 1,a nd tnd tool measurement 2,aool measurement 2,a nd end estimates 16,stimates 16,and subject:geand subject:ge ometry preliminary kometry preliminary k nowlenowledge(
21、1)-lidge(1)-line ane and and angle review contengle review conte nt line,ant line,and segment,and Ray,and segment,and Ray,a nd verticalnd vertical,and parallel,a,and parallel,a nd and angle anglngle angle of classification(slightly)17,and subjee of classification(slightly)17,and subje ct:geometry pr
22、ct:geometry pr eliminary knowleeliminary knowle dge(2)-plane gradge(2)-plane gra phiphics reviewcs review contecontent triangle,ant triangle,a nd end edges shapedges shaped,ad,and round,and fan axisymmetric graphind round,and fan axisymmetric graphi cs perimeter and arecs perimeter and are a coma co
23、mbinatibination graphics of area subjeon graphics of area subje ct:Preliminary knowledge(3)ct:Preliminary knowledge(3)-review-review of soliof solid content categd content category 1-d shapeory 1-d shape s are divided ints are divided int o:cylio:cylinder ander andnd cone 2,columcone 2,colum n is di
24、vin is divided ided into:nto:cuboicuboid,square 3,d,square 3,cone conecone cone of the features of cuboids aof the features of cuboids a ndnd cubes relaticubes relationshiponship betweebetween characteristin characteristics of circs of circularcular cone is sligcone is slightly solihtly solid surfad
25、 surface area and volce area and vol ume 1,size 2,table.ume 1,size 2,table.和和比压为 15T/的塔吊基础,按照生产厂家的塔吊说明书要求,基础采用6.06。01.4m 钢筋砼基础,设计砼标号为 C30.1。2 基础施工由于塔吊基础底标高与裙房基底标高相同,即塔吊基础底标高为-10。28 米。根据土石方开挖情况,挖至方案定的塔吊基础底标高后按规范要求进行清槽,清槽验收后即可浇筑基础垫层砼。垫层面标高比设计标高低 50,同时考虑塔吊基础底筋与裙房基础底筋的重合,可将垫层再降低 50,垫层浇筑完成后即可进行防水层、防水保护层施
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 临沂 文化 广场 塔吊 施工 方案
限制150内